Finance Committee - Agenda - 3/6/2019 - P614
B.
c. Verification of existing taps in service by flowing water, dye test, or visually
with a pan and tilt head camera or other means.
d. Cleaning of line (recorded on video tape).
Root cutting
f. Construct and complete any and all point repairs deemed necessary shall
receive Engineer’s approval before reworking the lines and the liner is
installed.
@
Prior to installation, the diversion pumping system, including back-up pumps,
shall be tested and running.
3.03 PREPARATION
A.