Finance Committee - Agenda - 11/18/2020 - P59

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P59

Harvey Gonstruction : Spreadsheet Report Page 10
i Nashua PAC GMP PostBid VE 10/21/2020 8:45 AM

t
i

Temp Werking Piatforms at T.O. Shafts 5,000.08 5,000.00 /ea
Lift
eftical Wheelchair Lift 760 LB B 14,357 00 14,357.00 fs 414,357

3 Pit - Allowance 2,900.00 ils

FIRE SUPPRESSION

Sprinkler Sub (includes attic space at 62,500,00 sf . Hampshire 3.14 sf
Indl. VE-9 i Fire

220008 PLUMBING i

Finance Committee - Agenda - 11/18/2020 - P58

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P58

Harvey Construction

Wire Mesh Partiions (200 1f & Doors (2
ez.)

Toilet Accessories

: Toilet Accessories
‘EQUIPMENT

&

Support work for Stage Rigging &

Div.

FURNISHINGS

Blinds & Shades (B9 ea) Manual rover
shades with 1% or 3%

CONVEYING SYS

Elevators

EL-B 5-Stop Service - Gearless Traction 1.09 Is
Elevator 4500 LB

ELEV-1 Clevator Operator Time (1.5 12,00 mh
ELEV-2 Decommission existing Elevator 8.00 ea

Spreadsheet Report
Nashua PAC GMP Postfid VE

Finance Committee - Agenda - 11/18/2020 - P57

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P57

Harvey Construction

Incl. VE-9
Ext wall systems not shown
Gypsum Drywall Fry Reglet reveal
Allowance
Soffits

Infill Orywall Ceilings not shown on plans -
Allowance
Parcelain Tile
Porcelain Tile

Panels
Kinetics “Ovations” Reflectar Panels
2-rows (1200 sf}

Tila, Resilient & Carpet

Protect Finished Flooring & Exposed 35,000.00 sf
Concrete
Floor
Robbins Bic-Channel Floor System 3-1/8" 2,011,009 sf
thick with standard Johnsonite venteove
base

Finance Committee - Agenda - 11/18/2020 - P56

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P56

Harvey Construction Spreadsheet Report . Page 7
Nashua PAC GMP PostBid VE 10/27/2020 8:45 AM

" [Smoke Vents
est Smoke Vents §,000.00 fea
Fumish (2} STG48 Rated Smoke Vents 43,582.00 As

&
Intern, Fireproof of all Vert. Steel, Columns x 432,500.00 132,500.00 fs
and bracing at Ii14 Construction (1-Hr, per
RFI-?7)
Intum. Fireproof of Gast fron Columns - A 14,500.00 14,590.00 fis
ALLOWANCE
Patch Fireproofing Allowance ‘ 5,000.00 §,000.00 fs

Firestop at Edge of Slabs F 34 34,800.00 fs

Finance Committee - Agenda - 11/18/2020 - P55

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P55

Harvey Construction

$150

6600

Mise. Ga

Arch, Millwork

Millwork - Ind. VE-12, VE-18

-2
Bui Insulation

Air! Barrier
Sheat Applied Air Vapor Baniar &
Membrane

Preformed Silioone ‘Transition strips at SF

Metal Roof at Loading Dock - Reduce per

VE-10

Structured Panets

EXTECH LIGHTWALL 3440 Structured
Panis

Metal Panels & Trim

Baard Panels

Hardie FOP System
Membrane

Reinforce Surf Rest Roof Structure & Misc !

Unidentified on Raof

Finance Committee - Agenda - 11/18/2020 - P54

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P54

Spreadsheet Report Page 5
Nashua PAC GMP PostBid VE 10/24/2020 8:45 AM

Harvey Gonstuction

Masonry (Includes rebar & cavily wail

Granite
Granite Sills w/Thermal finish - Ramps,
& deleted by VE13

Veneers
Clean Brick & Granite
Mise. lafill Alewaree
‘Thin-Brick (in liew of Swisspeari

METALS

Structural Steel
Structural Steel Colurnns, Beams, Joist,
& Ind. VE-8, VE.10

Finance Committee - Agenda - 11/18/2020 - P53

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P53

Harvey Construction Spreadsheet Report . Page 4
Nashua PAC GMP PostBid VE 10/21/2026 3:45 AM

isolated Footi

isolated

Elevator Pit

ELEV-2 Elevator Pit & Walls Gone4000

ELEV-2 10.00 106.00

4" Basemant 806 2-Slory Conc3S00 psi 140.00 cy . 110.00 /cy

402.00
Mise Conc; Stair Pans, Housekeeping 80.00 cy 416.00 Icy
Concrete
Additives for Flatwork 501.00 cy 3.98 fey
4° Bayement SOG Infills 4-Slory Gone3500 10.00 wy 710.00 /cy

Site Gone 4" Loading Dock, Ramp & Stairs 46.00 cy 112,00 fey

Finance Committee - Agenda - 11/18/2020 - P52

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P52

Harvey Construction

GENERAL CONDITIONS

P Dimensions

General Conditions

GENERAL REQUIREMENTS
T
at Main St. Sidewalk
EXISTING CONDITIONS
Demolition
TJakedowa + 2
Selective Demolition 4-Story Bldg

Completed Exploratery Demolition inv

Police Details on Main St. during

Asbestos Removal

Asbestos Removal

Concealed Asbesios Removal - Allowance
&

2-Story Foundation Wall Shores at A-Ln,
41-Ln & N-Ln. (prier to Bldg T:
Underpinning Allgwance

CONCRETE

Finance Committee - Agenda - 11/18/2020 - P51

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P51

Harvey Construction

Spreadsheet Report
_Nashua PAC GMP PostBid VE _

Page 2
10/27/2020 3:45 AN

Notes

Report foniat

Frames and Paitted Terrace rails.

-Banquet Tablas or Chairs / Moveable Furniture.

No Foundation demolition at the 2-Story Building.

~S5SP6 AESS Prep.

-Architectural As-Built in CADD

-Design Services, Cost associated with Spacial inspections, Sales Tax
-See exhibit "J"

Sorted by ‘Group phase/Phase’
‘Detail summary

Finance Committee - Agenda - 11/18/2020 - P50

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P50

Harvey Construction Spreadsheet Report Page t
Nashua PAC GMP PostBid VE 19/21/2020 8:45 AM

Project nama Nashua PAC GMP Post8id VE
201 Main St.
Nashua
NH
Estimator JEB
Laborrate table == NH
Job size s7c00 sf
Bid date 10/2/2020 2:00 PM
Notes Based on 100% CO Drawings & Specifications dated 8/14/20

Exclusions:
-Design Contingency
-Recent Tariffs.