Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/18/2020 - P50

Finance Committee - Agenda - 11/18/2020 - P50

By dnadmin on Mon, 11/07/2022 - 13:24
Document Date
Fri, 11/13/2020 - 12:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/18/2020 - 00:00
Page Number
50
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111820…

Harvey Construction Spreadsheet Report Page t
Nashua PAC GMP PostBid VE 19/21/2020 8:45 AM

Project nama Nashua PAC GMP Post8id VE
201 Main St.
Nashua
NH
Estimator JEB
Laborrate table == NH
Job size s7c00 sf
Bid date 10/2/2020 2:00 PM
Notes Based on 100% CO Drawings & Specifications dated 8/14/20

Exclusions:
-Design Contingency
-Recent Tariffs.

Construction Testing & Air Quilty Tasting
~Building Pennit Fes, Sewer Impact Feo, Water Meter Fee
-Sidewalk Closure Fee, Sidewalk encumbrance Fee,
-Winter Concrete or Masonry
-Purchasing Construction Parking spaces.
Clerks Office
~Purchase CADD Files
Utility (Fleciric, water, gas} Consumpfian cost
-Ledge ar Boulders
Unsuitable Soils
-Lightweight Concrete
Architectural Cancrete
-Isclated Concrete Floating Floor.
-Woad Plaza Decking.
-Roof Davits
_ “Qverhead Coiling Grilles.
~Metal Framed Skylight.
-Exterior Lighted Poster Cases.
-Lath & Plaster.
-Acoustic Ceiling Tie & Grid systems.
-Roof Screens, Root Railings
~Vertical Acoustic Cperable Panels
“BDA System
-Monitored Fire Extinguishers
-Telephone & Data system equipment,
-Atue Print matched wood paneling,
-Demountable Trap Stage Floor
~Glass Shower Enclosures
+Walleoverings.
~Grouling or reinforcament of existing Masonry.
-Level § GWE Finish.
-Painted wood base. AN base is resilient or tie.
-Painted concrete
-Exterior Paint other than 4-story window frames. HM Ext doors &

Page Image
Finance Committee - Agenda - 11/18/2020 - P50

Footer menu

  • Contact