Finance Committee - Agenda - 11/18/2020 - P49
THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
GMP ESTIMATE
EXHIBIT “H”
10/20/2020
THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
GMP ESTIMATE
EXHIBIT “H”
10/20/2020
321640 — Granite Curb
321723 ~ Pavement Markings
321726 — Tactile Warning Surfacing
323113 — Chain Link Fences & Gate
323130 — Bollards
Division 33 — UTILITIES
331100 — Water Distribution System
333100 — Sanitary Sewer System
334100 — Storm Drainage
ADDENDUMS -WNone BATE
235360 — Mini-Split Air Conditioning Systems
235400 — HVAC Pumps
235450 — Hydrostatic Testing & Chemical Water Treatment
237300 — Variable Refrigerant Flow Systems
237810 — Dedicated Outside Air Unit
238350 — Terminal Heat Transfer Units
238450 — Energy Recovery Units
238960 — Ductwork
239160 — Ductwork Accessories
239200 — Sound Attenuators
239300 — Air Terminal Units
299360 — Air Outlets & Inlats
239750 — Building Automation System
239806 — Instrumentation
Division 69 - FINISHES
092116 — Gypsum Board Assemblies
092120 — Gypsum Board Shaft Wail Assemblies
092409 — Plaster Patching and Repairs
093006 — Tiling
0951006 — Acoustical Ceilings
096454 — Stage Floor
096510 — Resilient Flooring & Accessories
096800 — Carpeting
099000 — Painting & Coating
DIVISION 10 —- SPECIALTIES
101400 — Signage
102110 - Toilet Compartments —
102210 — Wire Mesh Partitions
102800 — Toilet Accessories
10440 — Fire Protection Specialties
105110 ~ Metal Lockers
DIVISION 04 —- MASONRY
040120 — Masonry Restoration & Cleaning
042000 — Unit Masonry
044000 — Exterior Stonework
DIVISION 05 - METALS
051200 — Structural Steel
051250 ~ Architecturally Exposed Structural Steel
052100 — Steel Joist
053100 — Steal Decking
054000 - Cold-Farmed Meial Framing
055000 — Metal Fabrications
055100 — Metal Stair & Railings
057300 - Decorative Metal Railings
057500 — Decorative Formed Metal
059000 — Hof Dip Galvanized Coatings
Telcom — As Prepared by ICON Architects
T-001
T+104
T-102
T-103
7-104
T-105
T-201
T-301
Telecom Legend, Notes & Abbreviations
Basement Floor Telecom Plan
Ground Floor Telecom Plan
Parterre Floor Telecom Plan
Third Floor Telecom Plan
Fourth Floor Tefecom Plan
Telecom Riser Diagram
Telecom Details & Schedules
Theatrical LightIng — As Prepared by ICON Architects
oo * 2 @ 68 8 ©
ee #68 @ @ @ 8 @ 6& & & & @ © @ 8 @
Fire Alarm — As Prepared by Rist Frost Shumway Englneering, P.C.
es = @ @ @ # @ ©
E-203
E-204
E-205
E-206
£-301
E-302
E-303
E-304
E-305
E-401
E-402
E-403
F501
E-502
E-503
E-504
ES-101
ES-102
FA-004
FA-101
FA-192
FA-103
FA-104
FA-105
FA-106
FA-201
Parterra Floor Power Plan
Third Floor Power Plan
Fourth Floor Power Plan
Roof Power Plan
Plumbing — As Prepared by Rist Frost Shumway Engineering, P.C.
Mechanical — As Prepared by Rist Frost Shumway Engineering, P.C.
**?e ¢@ © @ @ @©@ @ @ 8 8 ® HehmUchHMUC OFHOrhUchFhUchMmrChCUCcPOhUhCUCchUchmUMPPhmhUCUhFOhmhUCUCMrhlUhH
Poot
Pi00
P101
P102
P103
P104
P105
P106
P201
P202
P201
*s «68 @® #@ &@ wb & & © & *&® @ © Fe FF F FF Fe Fhe FeO ehUhhUh hhUrhhlCUc hUchhUrhhUhrhUhHhUhhUchhUh}]h UhV!LhUh)M])hUMhrhUh]hUh!hUhOhUmh!
soo @#@ @hmUch OoOmhlUchrhUchO OO oHhUhHhUhFDhUchOmhUrhFhUrhOrhlUrhHDhUhFOChUrhhlUchhhlUrhhUcrhhUch FP HH HOhUchhUhhUhmhUhOrhUCUchFmhUchFhUchOFrhUcCPOrhUrhUhFhUhrChUhhrhUCUcPmhUCUchOhmrhCUcrhhUCcr Chr he PRP FP FH FH Fh hUhMDhUhO