Finance Committee - Agenda - 6/3/2020 - P148
TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
ni en
co: oO
aa
io
Od
wn
io
oo
Ln
2
: Waterproofing
' Concrete Surfaces
_ Barrier Membrane
: Bridge Fence
: Structural Timber
Preformed Joint Filler
» Requirements
Bivision 600
603
in -
iO
in
on
oO:
cn
in
im
(00
eal
im
MO
cr
hire
A
mn
On
i Guardrail
Plastic Pipe
» Plastic Pipe
* Detectable Warning
Devices
: Curbs
403.1.3 | Night Item Removal
410 Bituminous Surface
Treatment
|
411 © Pneumatic Tired
» Roller
417 Rumble Strip Inlay
Division 506
520 Portland Cement
' Concrete
! change after two sub-lots (06/06/17)
21.4, 2.1.2, 3.2, 3.3, 3.4 - Identifies
© conformance (06/06/17)
Section 403
3.4.11 - 3.4.15 - Describes the
Introduction of Recycled Materials at a
Batch Plant and Controls Minimum Dry
Time for Recycled Aggregates (07/06/18)
The following Construction Specifications amend, revise, supplement and/or otherwise modify
the New Hampshire Department of Transportation’s STANDARD SPECIFICATIONS FOR
ROADWAY AND BRIDGE CONSTRUCTION (2016 edition as amended).
NHDOT SUPPLEMENTAL SPECIFICATIONS
(2016 EDITION) —- UPDATED JULY 6, 2018
DIVISION 9
TECHNICAL SPECIFICATIONS
A. NHDOT Supplemental Specifications (2016 Edition) — updated July 6, 2018
B. ‘Technical Specifications
CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN
Project:
Owner Contractor
Owner:_City of Nashua, New Hampshire Name:
Address:_229 Main Street Address:
Nashua, New Hampshire 03060
City State Zip City State Zip
Contractor License:
Contract Date:
TO ALL WHOM IT MAY CONCERN:
CONTRACTOR'S AFFIDAVIT
STATE OF:
COUNTY OF:
Before me, the undersigned, a
(Notary Public, Justice of Peace, Alderman)
in and for said County and State personally appeared,
(Individual, Partner or duly authorized representative of corporate contractor)
who being duly sworn according to law deposes and says that the cost of all the Work, and
outstanding claims and indebtedness of whatever nature arising out of the performance of the
contract between
CONSENT OF SURETY FOR FINAL PAYMENT
OWNER's Project No.:
Project:
Amount of Contract (including
Type of Contract: Change Orders):
CONTRACTOR:
Contract For: Contract Date:
In accordance with the provisions of the above named contract between the OWNER and the
CONTRACTOR, the following named Surety Company:
On the Payment Bond of the following named CONTRACTOR:
CERTIFICATE OF FINAL COMPLETION
PROJECT:
OWNER’S CONTRACT NO;
DATE OF ISSUANCE:
OWNER:
OWNER’s Purchase Order NO.:
CONTRACTOR:
City of Nashua, NE
ENGINEER:
The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be substantially complete in
accordance with the Contract Documents on
(DATE OF FINAL COMPLETION)