Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/3/2020 - P146

Finance Committee - Agenda - 6/3/2020 - P146

By dnadmin on Mon, 11/07/2022 - 13:29
Document Date
Fri, 05/29/2020 - 15:04
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/03/2020 - 00:00
Page Number
146
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060320…

403.1.3 | Night Item Removal

410 Bituminous Surface

Treatment
|
411 © Pneumatic Tired
» Roller
417 Rumble Strip Inlay

Division 506

520 Portland Cement

' Concrete

! change after two sub-lots (06/06/17)

21.4, 2.1.2, 3.2, 3.3, 3.4 - Identifies

© conformance (06/06/17)

Section 403

3.4.11 - 3.4.15 - Describes the
Introduction of Recycled Materials at a
Batch Plant and Controls Minimum Dry
Time for Recycled Aggregates (07/06/18)

3.5.2 & 3.5.2.1 - Revises Recycled :
Materials Requirements (07/06/18) i

3.10.10.1 - Removes penalty for failing
tack (06/06/17)

3.12 - Allows a reduction in use of
pneumiatic-tired rollers (06/06/17)

3.17.1.3 - Revises the NETTCP QA
Technologist requirements (11/07/18)

3.17.3.1.1 - Revises HMA gradation
specification Emits, completes addition of
winter binder, removes allowance for Aim

4.1.1 - Removes reference to Night Items
(06/06/17)

Removes aij references to Night Items in 06/06/17

2,1 - Adopts new AASHTO Specifications 06/06/17 | 07/06/18 -
for Emuisions (04/13/16) .

3.4.1.1 - Revises pavement conditions,
application rate for tack (01/04/17}

tack sampling and penalties for non-

3.2 & 3.5.2 - Amends Distribution
Equipment and Initiates an Annual Tack
Truck Inspection Program (07/06/18)

3.5.5 - Requires the use of pneumatic 04/02/18 : 07/06/18
tired rollers on all Section 411 paving :
(06/06/17)

5.1.1 - Ensures Tack Used for PMST and
Leveling Course is a Pay Item (07/06/18)

Removes Pay Items (04/02/18)
; 2.1 & 3.7 - Specifies PMST as the asphalt | 04/02/18 :

inlay to fill in rumble strips

3.1.6,2.1.2 A - Revise NETTCP QA | 04/02/18 11/07/18 ©
Technologist requirements (11/07/18) i
3.8.1.1 - Revises the acceptable concrete

delivery temp to 90 degrees Fahrenheit
(04/02/18)

Page 2 of 3

Page Image
Finance Committee - Agenda - 6/3/2020 - P146

Footer menu

  • Contact