Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P627

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P627

16050-6
BASIC MATERIALS AND METHODS

Finance Committee - Agenda - 6/7/2017 - P626

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P626

7.

8.

16050-5
BASIC MATERIALS AND METHODS

Approved manufacturers shall be: Rob Roy Plasti Bond, Thomas & Betts-
OCAL or equal.

All fittings shall be of the same material as the respective raceway system.

B. Conductors and Cable

1.

All power wiring conductors (P-X on drawings) shall be insulated for 600 volts,

Type XHHW insulation, unless otherwise noted. Conductors shall be standard

AWG and KCMIL sizes. Conductors shall be 98 percent copper, stranded, heat

Finance Committee - Agenda - 6/7/2017 - P625

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P625

16050-4
BASIC MATERIALS AND METHODS

Finance Committee - Agenda - 6/7/2017 - P624

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P624

SNADMS

9

10.
Submit Shop Drawings per SECTION 16010.
Submit test results on all feeder conductors and heat trace cables as specified in

goa

16050-3
BASIC MATERIALS AND METHODS

Control Devices and Equipment

Motor Starters

Safety Disconnect Switches

Lighting Fixtures

Lighting flexible hangers

Conduit and wall and floor link seal fittings
Conduit cable sealing fittings

SECTION 16950.

PART 2 - PRODUCTS

2.1 MATERIALS
A. Conduit, Raceway and Tubing

1.

Finance Committee - Agenda - 6/7/2017 - P623

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P623

1.2

1.3

16050-2
BASIC MATERIALS AND METHODS

electrical wiring. If, after installation of any equipment, piping, ducts, conduit, etc.,
it is determined that ample maintenance and passage space has not been provided,
the work shall be rearranged and/or furnished with other equipment as required to
provide this space at no additional cost to the Engineer. The Contractor shall review
the drawings for all other trades to determine any potential interferences and identify
and coordinate with those with other trades.

Finance Committee - Agenda - 6/7/2017 - P622

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P622

16050-1

SECTION 16050

BASIC MATERIALS AND METHODS

PART 1 - GENERAL

1.1

DESCRIPTION

A.

Finance Committee - Agenda - 6/7/2017 - P621

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P621

3.1

3.2

3.3

16010-14
ELECTRICAL - GENERAL

INSTALLATION
A. Installation shall be as specified in the appropriate Sections of DIVISION 16.

TESTS
A. Refer to all related requirements as set forth within SECTION 16950 and additional
testing as indicated in the appropriate Sections of DIVISION 16.

CLEANING

A. Do not allow refuse and surplus materials to accumulate on the project site during
the course of the work. Areas shall be cleaned and picked up on a daily basis.

Finance Committee - Agenda - 6/7/2017 - P620

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P620

1.13

1.14

1.15

16010-13
ELECTRICAL - GENERAL

Finance Committee - Agenda - 6/7/2017 - P619

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P619

1.7

1.8

1.9

1.10

16010-12
ELECTRICAL - GENERAL

6. List of recommended spare parts.

RECORD DRAWINGS

A.

At the completion of the installation, provide reproducible Record Drawings
indicating the final configuration of all Electrical Systems as they were
installed. Symbols, equipment designations, etc. shall be consistent with the
Contract Documents. Provide exact locations of all work which has been concealed
in concrete, masonry or underground.

Finance Committee - Agenda - 6/7/2017 - P618

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P618

16010-11
ELECTRICAL - GENERAL

Pagination

  • Previous page ‹‹
  • Page 1234
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact