THIS FORM MUST BE SUBMITTED WITHALL RESPONSES TO IFB
ALTERNATE BID ITEMS (IF AWARDED BY CITY)
e BID ALTERNATE—A
The Bidder agrees to perform all the of the work for coating the Exterior Ladder on the Energy Recovery Building
according to the project scope/specifications/measurement and payment section as described above for the sum of:
$12,200.00 (S_ 12,200.00 ) (Use figures)
Twelve Thousand Two Hundred Dollars _ Zero Cents (Use words)
e BID ALTERNATE —B
The Bidder agrees to perform all the of the work for Concrete Seal Coating and all related work ( including replacing
caulking between bearing wall and ringwall) on the Secondary Digester Foundation according to the project
scope/specifications/measurement and payment section as described above for the sum of:
$22,200.00 (S__22,200.00 ) (Use figures)
Twenty Two Thousand Two Hundred Dollars Zero Cents (Use words)
e BID ALTERNATE—C
The Bidder agrees to perform all the of the work for New Gasket on Gas Holding Tank and all related work (including
replacing removal of old caulking between the tank and concrete foundation) according to the project
scope/specifications/measurement and payment section as described above for the sum of:
$3,200.00 {(S__ 3,200.00 ) (Use figures)
Three Thousand Two Hundred Dollars Zero Cents (Use words)
Authorized Signature: hebut(C Brkeale
Printed Name and Tile: _ Robert Belisle / President
Date: 1/24/2022
IFB1092-010522 WWTF Primary and Secondary Digester Coating Pagel 7of9