Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 6771 - 6780 of 38765

Finance Committee - Agenda - 4/20/2016 - P16

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
16
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

4/4/2016 www.wdal.goviwdol/scafiles/davisbacor/NH 12.dvb?v=3

the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana, 2012 is the year of survey on which
these classifications and rates are based. The next number, @07
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a
new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
Classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-@@10
08/29/2014, UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 9010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.

WAGE DETERMINATION APPEALS PROCES

1.) Has there been an initial decision in thew. “ter? This can
be:

* an existing published wage determinacion

* a survey underlying a wage determi. ytion
a Wage and Hour Division letter sett..g fo‘th a position on
a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.

With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division

U.S. Department of Labor

260 Constitution Avenue, N.W.

Washington, DC 20210

http:/Avww.wdol.goviwdol/s cafiles/davisbacon/NH 12.dvb?v=3

Page Image
Finance Committee - Agenda - 4/20/2016 - P16

Finance Committee - Agenda - 4/20/2016 - P17

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
17
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

4/4/2016 www.wdol.goviwdol/scafiles/davisbacoNH 12.dvb?v=3

2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor

20@ Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor

280 Constitution Avenue, N.W.
Washington, DC 20216

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

http:/Avww.wdal.gov/wdol/scafiles/davisbacon/NH 12.dvb?v=3

Page Image
Finance Committee - Agenda - 4/20/2016 - P17

Finance Committee - Agenda - 4/20/2016 - P18

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
18
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

tyco
Integrated Security
915 4UE0O0 1

EXHIBIT B

Proposal for
Nashua Wastewater Treatment Facility
Sawmill Rd
Nashua, NH 03060
03/25/2016

This Tyco Integrated Security Proposal (the “Proposal”) contains Tyco proprietary and
business confidential information and may not be shared wit!: third parties without the prior
written consent of Tyco. Tyco’s provision of the equipment, s, stems, and/or services described
in this Proposal is expressly conditioned upon Company’s ~cceptance of the terms and
conditions of the standard Tyco Integrated Security ““GREEME ‘T” COMMERCIAL TERMS
AND CONDITIONS posted on http:/Awww.tycois.co. /scandardtandc. The system design
and specified equipment are subject to final approval b, vour local fire department or other
authority having jurisdiction. This Proposal is valic ..- period of sixty (60) days from the above
date and any deletions or additions to this Proposz| :nay result in changes to the pricing and/or
terms and conditions.

Inquiries reg7¢ding 1. is p.oposal may be directed to:

Tyle Devoe

Tyco integrated Security
Cell Phone #: 603.706.0534
Email: tylerdevoe@tyco.com

© 2015 Tyco = All rights reserved. Tyco, the Tyco logo are service/trademarks of Tyco. All other product names
and/or company names used herein may be protected as trademarks of their respective owners.
TYCO CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION

Page Image
Finance Committee - Agenda - 4/20/2016 - P18

Finance Committee - Agenda - 4/20/2016 - P19

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
19
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

Nashua Wastewater Treatment Facility
CoO Sawmill Rd
Nashua, NH 03060

Integrated Security Estimate Name: Nashua Wastewater Treatment IP CCTV 1-4-16

DATE 03/25/2016
DEAR Nick Miseirvitch:

Thank you for allowing Tyco Integrated Security (Tyco) the opportunity to provide Nashua
Wastewater Treatment Facility with our proposal for Nashua Wastewater Treatment IP CCTV
1-4-16.

As an industry leader, Tyco’s desire is to bring experience, industry insight and value to our
customers by providing solutions that deliver lasting results while help keeping risk to a
minimum. Your business is our business and helping to reduce your losses while improving
operations means Tyco is consistently evaluating your issues and needs.

Tyco provides integrated security solutions to businesses like yours throughout the world. In
North America, Tyco maintains over 200 full-service brick and mortar offices, staffed by more
than 10,000 company-trained employees, including over 3,700 service personnel. With
unparalleled presence across the U.S., Tyco service and installation teams are specially
trained and focused on our technology offerings.

We are proud of our history, financial strength and depth and brec ‘th of services we offer and
| look forward to discussing our proposal with you anc shoving you why Tyco is the premier
leader in the electronic security industry.

| offer you my personal commitment to help ensure, Tyco ~ieets your business needs.
Sincerely,

Tyler Devoe
Commercial Business Solutions

License Information: AL 2014/15-1498, 1499, 1500,1501,1502, 47,994,595 The Security Industry is governed by the rules and regulations of the Alabama
Electronic Security Board of Licensure. If you would like information on these rules and regulations or would like to register a complaint you can contact the Board at:
AESBL 7956 Vaughn Rd., Montgomery 36116, (334) 264-9388 Fax: 334-264-9332 AK 38381, 5430 Fairbanks Street, Suite 8 Anchorage, AK 99507 AR
0030740116, 003587, Regulated by Arkansas Ba. of Private Investigators & Private Security Agencies, #1 State Police Plaza Dr., Little Rock 72209, (501) 618-8600
AZ ROC281489 CA ACO7207, 977249; alarm company operators are licensed and regulated by the Bureau of Security & Investigative Services, Dept. of Consumer
Affairs, Sacramento, CA 95814 DC _ECS1327 FL EF20000413, EF20000890, EF20000341,EF0000478 GA LVA002833, LVA205386, LVA204776, LVA205526,
LVU001160, LVU004635 HI CT-32427 IL 127001526 MA 45-C MI 3601206461, 5103373, 6060 Torrey Rd. Suite F Flint, Ml 48504; MN TS651063 MS 16024088 NC
846-CSA, 4901 Glenwood Ave., Suite 200, Raleigh, NC 27612, (919) 788-5320 NM 375283 NV 0077542 NY 12000305846, Licensed by NYS Dept. of State OH
E16782, 50-18-1052, 50-25-1050, 50-29-0003, 50-48-1032, 50-57-1119, 53-31-1582 OK 67 OR CLE322, 197010; PA Pennsylvania Home Improvement Contractor
Registration Number, PA010083 RI 18004, TSC2726, AF-09170 TN C-1704,-1705,-1706,-1707,-1708,-1709,-1710,-1711 TX B00536, 4200 Buckingham Road Ste
150, Ft. Werth, TX 76115 — Dept of Public Safety, Private Security 5805 N. Lamar Blvd, Austin 78752 UT 8390557-6501 VA 11-7587, 11-7580, 11-7575, 11-7591,
11-7589, 11-7578, 2705147765A WA TYCOIIS88600, 11824 N Creek Pkwy. #105, Bothell, WA 98011 WV 050291.

Mississippi: MS 15024088. see a comprehensive list of licenses on www.tyoois.com/about-us/legal. California Customers Only: Upon
completion of the installation of the alarm system, the alarm company shall thoroughly instruct the purchaser in the proper use of the alarm system. Failure by the
licensee, without legal excuse, to substantially commence work within 20 days from the approximate date specified in the agreement when the work will begin is a
violation of the Alarm Company Act.

© 2015 Tyco = All rights reserved. Tyco and the Tyco logo are service/trademarks of Tyco. All other product names and/or
company names used herein may be protected as trademarks of their respective owners.

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 2 of 6

© TYCO 2015. ALL RIGHTS RESERVED

Page Image
Finance Committee - Agenda - 4/20/2016 - P19

Finance Committee - Agenda - 4/20/2016 - P20

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
20
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

Nashua Wastewater Treatment Facility
GC oO Sawmill Rd
Nashua, NH 03060

Integrated Security Estimate Name: Nashua Wastewater Treatment IP CCTV 1-4-16

PAYMENT OPTIONS

Outright Sale Option
Provides your business with ownership of the electronic security equipment upon purchase.

Installation Investment Package: $49472.79

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 3 of 6

© TYCO 2015, ALL RIGHTS RESERVED

Page Image
Finance Committee - Agenda - 4/20/2016 - P20

Finance Committee - Agenda - 4/6/2022 - P119

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
119
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

31. Choice of Law and Venue. This contract shall be governed exclusively by the laws of the
State of New Hampshire and any claim or action brought relating to this contract, the work
performed or contracted to be performed thereunder, or referable in anyway thereto shall
be brought in Hillsborough County (New Hampshire) Superior Court Southern Judicial
District or in the New Hampshire 9th Circuit Court—Nashua and not elsewhere.

GC 13 of 13

Page Image
Finance Committee - Agenda - 4/6/2022 - P119

Finance Committee - Agenda - 4/20/2016 - P21

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
21
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

tyco

Nashua Wastewater Treatment Facility
Sawmill Rd
Nashua, NH 03060

Integrated Security Estimate Name: Nashua Wastewater Treatment IP CCTV 1-4-16

SCOPE OF WORK FOR Nashua Wastewater Treatment Facility

This proposal presented by Tyco is being provided at the request of Nashua Wastewater Treatment
Facility to successfully meet the specifications of the Nashua Wastewater Treatment IP CCTV 1-4-16

Project at the Sawmill Rd, , Nashua, NH 03060 location.

We propose to install and maintain a Video system which will consist of the following:

Contact Information:

System Operation:

Please contact Nick Miseirvitch at (603)
589-3305 or at
MiseirvitchN@nashuanh.gov

Tyco Integrated Security shall:

A. Install (1) American Dynamics NVR
capable of handling (128) IP cameras with
36TB Hv that will record (8) IP cameras
on muti 1 detection only at 12 FPS. The
NV& ‘will bJocal only and will be located in
‘ne office at ..e main entry. City of Nashua
1, 1&1 provide (3) 120V outlets at the location
of 1. > DVR for the DVR itself, monitor and
PoE switch.

b. -:nstall (1) 17" LCD monitor that will be
located next to the NVR

C. Install (2) Transition 24-Port Gigabit PoE
switch at the location of the NVR

D. Install (8) Illustra Pro 3 Megapixel IP
cameras that are outfitted with infrared night
vision, vandal proof housing and wall
mounts. The cameras will be located on the
exterior of the facility and will view the
following:

1. Viewing Entry Lot and Entry Driveway
2. Viewing Sewer Dumping Station

3. Viewing Right Side Lot and Drive
Between Buildings

4. Viewing Basins and Overhead Doors
5. Viewing Lot Between Buildings on Left
Side of Building

6. Viewing Left Side of Building Drive -
Toward Rear of Building

7. Main Entry Door

8. Front Entry Lot

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION

Page 4 of 6

© TYCO 2015. ALL RIGHTS RESERVED

Page Image
Finance Committee - Agenda - 4/20/2016 - P21

Finance Committee - Agenda - 4/20/2016 - P22

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
22
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

Nashua Wastewater Treatment Facility
GCG O Sawmill Rd
Nashua, NH 03060

Integrated Security Estimate Name: Nashua Wastewater Treatment IP CCTV 1-4-16

E. Program NVR
F. Train end-user on basic use of the
system after installation

Programming Info: Cameras will record at 12 FPS on motion
detection only.
Site Conditions: Existing wastewater treatment plant

building with drop ceiling in some areas and
hard ceiling in others.

Customer Expectations: M-F 8-5

Training Expectations: Tyco technician shall train customer on
basic use of the camera system after
installation

Customer Responsibilities / Tyco Exclusions: The City of Nashua is responsible for the
following:

1. Provide (4) 120V electrical outlets at
location of the NVR, Monitor and PoE
switch
2. Prov +e access to all areas required for
insta.latic. between 8am and 5pm
“onday-Fric +y.
. Be present during camera sight-ins to
en. ire the views are satisfactory.
4. Be sresent on the last day of the
.>+allation for end-user training with the
technician.

Documentation Needs: Drawings to be completed upon signed
contract

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 5 of 6

© TYCO 2015. ALL RIGHTS RESERVED

Page Image
Finance Committee - Agenda - 4/20/2016 - P22

Finance Committee - Agenda - 4/20/2016 - P23

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
23
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

Nashua Wastewater Treatment Facility
G @ Sawmill Rd
Nashua, NH 03060

Integrated Security Estimate Name: Nashua Wastewater Treatment IP CCTV 1-4-16

BILL OF MATERIALS FOR Nashua Wastewater Treatment Facility

Nashua Wastewater Treatment IP CCTV 1-4-16 System

owns PRODUCT CODE DESCRIPTION LOCATION
ADLCD17GB 17" LCD 1280x1024
1 Resolution, DVI-D, VGA,
Audio
ADVER36R5DF VIDEOEDGE RACK MOUNT
4 NVR, 4 IP CAMERA
LICENSES, 36TB RAID 5 (42
TOTAL), 4 NIC, R
8 ADCIM6WALLBK illustra 600 wall mount indoor
outdoor black adapter Kit
IPSO3D20CBIT ILLUSTRA PRO 3MP
8 MINIDOME, 3-9MM,
OUTDOOR, VANDAL, CLEAR,
BLACK, TDN WIIR, TWOR
8 ADVEC01-ICF VE NVR Camera Lic ns.
w/purchase of Illi:tra Cat, >ra
TRANSITION TRANSITION
2 SM24TAT4XA-NA 24-Port | SM24TAT4XA-N. .24-Port GB
GB PoE Switch PoE Switch
4 Transition TN-SFP-SX Transitio, >5P Modt.es

TYCO INTEGRATED SECURITY CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION
Page 6 of 6

© TYCO 2015. ALL RIGHTS RESERVED

Page Image
Finance Committee - Agenda - 4/20/2016 - P23

Finance Committee - Agenda - 4/20/2016 - P24

By dnadmin on Mon, 11/07/2022 - 09:55
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

qco Security | Il | | | | |

u EO 1

EXHIBIT C

Proposal for
Nashua Wastewater Treatment Facility
Sawmill Rd
Nashua, NH 03060
04/01/2016

This Tyco Integrated Security Proposal (the “Proposal’) contains Tyco proprietary and
business confidential information and may not be shared wit!:.third parties without the prior
written consent of Tyco. Tyco’s provision of the equipment, =) stems, and/or services described
in this Proposal is expressly conditioned upon Company's <cceptance of the terms and
conditions of the standard Tyco Integrated Security “A“GREEME ‘T” COMMERCIAL TERMS
AND CONDITIONS posted on http:/Awww.tycois.co. /standardtandc. The system design
and specified equipment are subject to final approval b, vour local fire department or other
authority having jurisdiction. This Proposal is valic 12-4 period of sixty (60) days from the above
date and any deletions or additions to this Proposz|.:nay result in changes to the pricing and/or
terms and conditions.

Inquiries reg7rding .. ‘s p. oposal may be directed to:

Tyle Devoe

Tyco integrated Security
Cell Phone #: 603.706.0534
Email: tylerdevoe@tyco.com

© 2015 Tyco — All rights reserved. Tyco, the Tyco logo are service/trademarks of Tyco. All other product names
and/or company names used herein may be protected as trademarks of their respective owners.
TYCO CONFIDENTIAL AND PROPRIETARY BUSINESS INFORMATION

Page Image
Finance Committee - Agenda - 4/20/2016 - P24

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 674
  • Page 675
  • Page 676
  • Page 677
  • Current page 678
  • Page 679
  • Page 680
  • Page 681
  • Page 682
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact