Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 6751 - 6760 of 38765

Finance Committee - Agenda - 5/3/2016 - P182

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
182
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

CITY OF NASHUA LED STREET

ED STREET LG: ONVERSION PROJECT - "SCHEDULE ot __!t _ _ [ T T L T I 7
Stamens Industry, Ine. _ —— _ _ | _ es ——_] 2 ~ | = t f T | +——
eotek Fixtures,CIMCONControl | De ees i | _ - 4 |: —__] | 1 = + j | =
| | a 8 i c | D_ 4 { F q _ 6 a : de ad _K ts} oM yn [| o [oP Q R 5s | sT
| | i i | | | Fixture Material | | Other Project) OtherFaes Total Unit Cost \
Line easter HPS |; getting rintare it proposed! | Matertal unit Total Installation Labor | Labor Total Fees velect Total 8) Extended Cost | curent) Driver diode Pops Typles}
Ne ture | Existing Wattage Tyee |Proposed quentity|Propased Wattage 4 TTPO’ = Proposed Fiature Ordering Information (1) Cost PerFhaure Unit Cost Per cast Per ima} Menu Mana NM | Delivered
| Qusntity | (3) Fixture (4] (0%) (arm) ™ anufecturer | Manufactirer | KelvinTemp | ens
i (D* Ky | Fixture (5) (o*L [H4J4L)
3906 | _ 50 CobraHead =| 3806 24 ___ 601-206. MV-NW-2-GY-270 509,147.10 | $ 4397, $ 171,746.82 | §_ | $ 207,282. “para | § 888,146.28 270 t tteon | Cree _ | 3000K ar 4000k| 2400
357, 70 Cobra Head 367 L 38 _t GCI1-206-MV-NW-2-Gy-450 43.97 $ 16,136.99 |$ 53.06 | $ 19,473.02 | $ 227.38 | $ 83,408.46 480 | tteon | Cree __|3000K or 400K) 3700
508 100_ CobraHead | 508 i #8 GCI1-206- MV-NW-2-GY-620 $ $53.06 |$ 26,954.48 | $ 227.38 |$ 115,503.04; 620 | ‘LiteOn | cre 3000K or 4000k| 4400
wo | a0 CobraHead 190 ! 74 602-206 MV-NW-2-GY-1A $ $53.06 |$ 10,091.40 | $ 255,63 [$48,563.70 1000 | ‘LiteOn Cree | 300K ar 4000K/ 7000
ta =| so CobraHead | 23 | 1387 GCM2-40F-MV-NW-2-GY-1A is L$ 53061 $" 12, $327.93) $ 75,095: ar 1000 | Liteon | Lumileds “| 3000K or 4ocax) 12000
1 ~w | 400 Cobra Head _ 2 | 200 | __ GC2-120FMV-NW-2-GY-530-PCRS-WL $s i$ 53.06 [$ 4,538.74 $ 47553 § 13,790.37 [530] _uteon | _.umiteds [300K or 4000-20800]
| a | isa ' _ 3B | 52 | __ LFLG-60 _ ss w81§ 5306|§ 201628 1$ 555.12 |S 21,09456 | 105) Thomasind | Nicht ‘| 3000K or 400K, 7164
_ 8 | 250 x 8 82 jo WFue-6o 3 $ 555.128 4,440.96 | 105 Thomas ind | Nichia | 3000Kor4000K) 7164
— Rk 4 400 LL 2 | 12a bumecon_ LF Le120 $s 21 $ 68402 $ 8208.24) 105 Thoma nd | Nichia | 3000K or 4000K,— 43574 |
\ 2 ; 1000 2 4 124 | kumecon == LFLG-120 $ 1s __ 68402 $1,368.04 105 Thomas Ind Nichia | 300K or 400k 13574
; OB 50 108 18 Leotek | _ 2471 20LEDE7OMVOLT 4K Ra AY Is $ 58332) $ 6299856) 700) Phitps Nichia 3000K or 4000k| 7295
_ 3s _ 70 | 45 a leotek | _-247L 2OLEDEJOMVOLT4KR3AY 3 ($_ $83.3; 4,749.80 700 Philips _Nichia | 3000K or 4000k| 2295
7a 50 ! Suburhan 78 4s _ Leotek ___247L20LEDEVOMVOLT 4K RAY | $ $ 583. 2 $45,498.96 700 XITANIUM Nichia [300K or 000k) 2295,
18 I 100. Suburban 18 i 45 I Leotek_ _2471 20LEDE70 MVOLT 4K R3 AY _ $ as 593.32 /$ 10,499.76, 700 NITANIUM | __Nichia_—_| 300GK or 400K; 2295
[
| i { t Cc _ |
f 5,508 | | I 5,508 | ! !
_— Lo. ob Ot =| = — —f _— OT :
mets — ~; = | =H —— + —+ —_} _ _
1 4
21 | [ADDITIONAL PROIECT UNIT PRICES I 7 __ - So 7
|2] Hourly Labor Rates far Traffic Contro! . i aS | _ I _ _ - __ COMMENTS: Je a |
+ ‘lice Detail i$ suas. reetion Per Hour ail __ ee Nan-supervisor a __
| ‘Traffic Flogger | $ 25.00 | Par Flagger, Per Hour {1 ed $2 for '$37,50/1 work) NETC hardware to connect to existing poles, 4
I
[z]Misellanecus Unit Pricing | ce lh 2 b> [Material Unit Cost linstallation Unit Cost | re 4) Provide only Labor cost associsted with the Inst Not Including Traffic Control). —
Bracket-4° —_| Galvanized Cantitever Wood Pole Bracket & Hardware is _ 64,00 | § TT _ |(5) Provide All Costs assaclated with Audit, Shipping, Project Management, requirad bands/permits, and any adéltional overhead prafit (excluding Trafic Control). ~|
Bracket - 6" | Galvanized Cantilever Woad Pole Bracket & Hardware "$ poo tg ___ 174,00 |Per Bracket — —_ _____|{6) Tatal Unit Cost will be the Unit pricing used for tha schedule: of values. Total Unit Cost fs the cum of [[Matertals (H}, Installation (J), and Project Fees (UJ). | J
= (Bracket - 8 | Galvanized Cantilever Wood Pole Bracket & Hardware $ 110.00 | $ Saal 275,00 |PerBrocket | _|[- [(7) All Fixtures Must BE DLC Certified. | if = J | T 1 _
nat a _ aE : = 30 = __ _ - _[f6) A mlotmum ten year Manufacturer Warranty per AFP Is required. _| = | 5
_{3)Flature Recycling _ | to J 4 et ae z (9)The Chty reserves the right to salect fiaure colors similer to exfsting fixtures and pales, | he : i 4 J
: [estimated Vale | - [Per Fixture [Assumes dollvering comptete fixtures to Eversoure - = ___| "Colors will be selected fram th turer's option color chart (onfy applies to dacorative fixtures). | [ |
| 34 | 4} Proposed Smart Control System 4 [Price per Node —_ fo __ _ ah -T_ |. _ _ i { 7, ] 1 _
| 3s | jo Proposed Smart Control System _ "$ 628,262.28 | $ 114.06 | - - _ = a _ : _ tr :
al J ___ [Unit Price for Additlonal Nodes $ 108,00 a I _ =I 4 2 | ee -_ | | __ | — = | L
37 | i Unkt Price for Additional Gateways = $ 2,350.00 a | __ | _ ih ce == | _ | _ t 2
| 38 + 4 } 4 +
39 t [ I | _ 7 _ E ese
ap Twores: | { YES/NO |_COMMENTSIFNO | __ _ I - L 1 —_ __
[a1 |All proposed fixtures covered by.a Manufacturers Joye waranty? YES aE ‘ _ - ES t t { ai _
P42 {Allfotures models are DLC approved? YES _ = — oo T rT | e 1 a | -
a3 | tal propased Smart Controls covered Manufacturer's 1041. warranty? YES Lan oe = =e | = - 1 _ : oi | at a
44 I |
as ADD OTHER NOTES AS NEEDED “ft = I _ | _ aa 1 t _t an wh i z J
46 ' -
[47 [SUMMARY - BASE PROPOSAL PRICING WITH SMART CONTROTS I | | | T L j 1 4
48 ‘Proposal Date : _ [March33,7016 | 1 _ _ LC _ i a
49 | _ [Base Bid Materials - All new fixtures per given quantities _ _ Js 848,377 | — _ | - ! . 1]
so | |Base aid | labor | | ae [$246,787 | | __ tt _ _ | | i _|
51 _ ___ | Base ld Smart Control System — | ao \$ _ _ ee a 4 __- =
| sz | [Base Od Cuber Fees [ _ _ $ _ 292, _ | — __ L __ =e < 1 |
1 53 | | Traffic Contral & Contingency Allowance t $ 275.4 __ ee oa _ | |
54 | [Total Estimated Project Cost $2,083,936 _ - tC A
55 ] |
st —5 — += =. = +— io = pease

COST PROPOSAL WITH CONTROLS

Page Image
Finance Committee - Agenda - 5/3/2016 - P182

Finance Committee - Agenda - 5/3/2016 - P183

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
183
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

_A
Existing HPS ft

Fixture Existing Wattoge |
Quantity

ial
Materlal Unit Fiomure Mite ‘*' | Installation Labor | Lebor Total Other Fees | Total Unit Cost ended Cost Twetce!

!
Proposed Fixture Ordering Information {1} | Cost Per Fixture Unit Cost Per Fees Unit Total s Drive Current | var Manufacturer Dlode Proposed = Delivered
(3) Fixture (8) pen Cost Per aon (ma) Manufacturer | Kelvin Temp |
(oH) Fixture (5) | {D*L) (Hasey
ee Tr . 8 __270 o
367 ; Cobra Head 37 _| fe -—teotek 16,136.99 227.38 | $
| CobraHead 3973
|__ Cobra Head
--—_Cobra Head
“| Cobra tead
Hoodlight iB — & _tumecon of a 105 Thomas Ind
B iG
iF '
LG:120 : _Nichia_
MVOLT 4K R3 AY 5,730.48
MVOLTAKRBAY | § ______ 906.90, Philips __Nidila
AK R3 AY 583,32 |$ 45,498.96 Nichla
583.32 $ 10,499.76 700__

Existing Fixture
Type

Proposed
Manufacturer

L
|
!
[roped quantity | Proposed Wattage
|

Lumens

Hourly
_|Police . f .
Flogger : Material

Miscellaneous Unit Pricing
ick

‘OTHER NOTES AS N

~ BASE PROPOSAL PRICING: _ __ _

___}Proposal Date | 7 __|March 11,
[Base Bid Materiaks - All : is

__ ase Bid Labor _! . : $

[Based Other Fel

COST PROPOSAL NO CONTROLS

Page Image
Finance Committee - Agenda - 5/3/2016 - P183

Finance Committee - Minutes - 4/20/2016 - P1

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__042020…

REPORT OF THE FINANCE COMMITTEE
APRIL 20, 2016

A meeting of the Finance Committee was held on Wednesday, April 20, 2016, at 7:00 p.m. in the
Aldermanic Chamber.

Mayor Jim Donchess, Chair, presided.

Members of the Committee present: Alderman-at-Large Mark S. Cookson, Vice Chair
Alderman-at-Large Lori Wilshire
Alderman-at-Large Michael B. O’Brien
Alderman Benjamin M. Clemons
Alderman June M. Caron
Alderman Ken Siegel

PUBLIC COMMENT — None
COMMUNICATIONS

From: Dan Kooken, Purchasing Manager
Re: Purchase of Access Control and Camera System for WWTP (Value: $82,532)

MOTION BY ALDERMAN SIEGEL TO ACCEPT, PLACE ON FILE AND APPROVE THE PURCHASE

FROM TYCO INTEGRATED SECURITY IN THE AMOUNT OF $82,532. FUNDS ARE AVAILABLE IN
DEPARTMENT 156, EMERGENCY MANAGEMENT; 2014 STATE HOMELAND SECURITY PROGRAM
GRANT; SECURITY EQUIPMENT AT WASTEWATER

MOTION CARRIED

UNFINISHED BUSINESS — None

NEW BUSINESS — None

RECORD OF EXPENDITURES

MOTION BY ALDERMAN SIEGEL THAT THE FINANCE COMMITTEE HAS COMPLIED WITH THE CITY
CHARTER AND ORDINANCES PERTAINING TO THE RECORD OF EXPENDITURES FOR THE PERIOD
TO APRIL 1, 2016 TO APRIL 14, 2016

MOTION CARRIED

PUBLIC COMMENT — None

ADJOURNMENT

MOTION BY ALDERMAN CARON TO ADJOURN
MOTION CARRIED

The Finance Committee meeting was adjourned at 7:01 p.m.

Alderman Ken Siegel
Committee Clerk

Page Image
Finance Committee - Minutes - 4/20/2016 - P1

Finance Committee - Agenda - 4/6/2022 - P117

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
117
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

22.

23.

24.

25.

26.

Professional Engineer shall have the right, in order to avoid such claims or actions, to
substitute at its expense non-infringing materials, concepts, products, or processes, or to
modify such infringing materials, concepts, products, or processes so they become non-
infringing, or to obtain the necessary licenses to use the infringing materials, concepts,
products, or processes, provided that such substituted or modified materials, concepts,
products, or processes shall meet all the requirements and be subject to all the terms and
conditions of this contract.

Final Acceptance. Upon completion of all work under the contract, Professional Engineer
shall notify the City of Nashua in writing of the date of the completion of the work and
request confirmation of the completion from the City of Nashua. Upon receipt of the
notice, the City of Nashua shall confirm to Professional Engineer in writing that the whole of
the work was completed on the date indicated in the notice or provide Professional
Engineer with a written list of work not completed. With respect to work listed by the City
of Nashua as incomplete, Professional Engineer shall promptly complete the work and the
final acceptance procedure shall be repeated. The date of final acceptance of a project by
the City of Nashua shall be the date upon which the Board of Public Works or other
designated official accepts and approves the notice of completion.

Taxes. Professional Engineer shall pay all taxes, levies, duties, and assessments of every
nature due in connection with any work performed under the contract and make any and all
payroll deductions required by law. The contract sum and agreed variations to it shall
include all taxes imposed by law. Professional Engineer hereby indemnifies and holds
harmless the City of Nashua from any liability on account of any and all such taxes, levies,
duties, assessments, and deductions.

Non-Waiver of Terms and Conditions. None of the terms and conditions of this contract
shall be considered waived by the City of Nashua. There shall be no waiver of any past or
future default, breach, or modification of any of the terms and conditions of the contract
unless expressly stipulated to by the City of Nashua in a written waiver.

Rights and Remedies. The duties and obligations imposed by the contract and the rights
and remedies available under the contract shall be in addition to and not a limitation of any
duties, obligations, rights, and remedies otherwise imposed or available by law.

Prohibited Interests. Professional Engineer shall not allow any officer or employee of the
City of Nashua to have any indirect or direct interest in this contract or the proceeds of this
contract. Professional Engineer warrants that no officer or employee of the City of Nashua
has any direct or indirect interest, whether contractual, noncontractual, financial or
otherwise, in this contract or in the business of Professional Engineer. If any such interest
comes to the attention of Professional Engineer at any time, a full and complete disclosure
of the interest shall be immediately made in writing to the City of Nashua. Professional
Engineer also warrants that it presently has no interest and that it will not acquire any
interest, direct or indirect, which would conflict in any manner or degree with the
performance of services required to be performed under this contract. Professional
Engineer further warrants that no person having such an interest shall be employed in the
performance of this contract. If City of Nashua determines that a conflict exists and was not
disclosed to the City of Nashua, it may terminate the contract at will or for cause in
accordance with paragraph 8.

GC 11 of 13

Page Image
Finance Committee - Agenda - 4/6/2022 - P117

Finance Committee - Agenda - 4/20/2016 - P1

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

FINANCE COMMITTEE
APRIL 20, 2016

7:00 PM Aldermanic Chamber

ROLL CALL

PUBLIC COMMENT

COMMUNICATIONS

From: Dan Kooken, Purchasing Manager

Re: Purchase of Access Control and Camera System for WWTP (Value: $82,532)
Department: 156 Emergency Management; Fund: 2014 State Homeland Security Program
(SHSP) Grant; Activity: Security Equipment at Wastewater

UNFINISHED BUSINESS — None

NEW BUSINESS — None

DISCUSSION

RECORD OF EXPENDITURES

PUBLIC COMMENT

NON-PUBLIC SESSION

ADJOURNMENT

Page Image
Finance Committee - Agenda - 4/20/2016 - P1

Finance Committee - Agenda - 4/20/2016 - P2

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

D\ THE CITY OF NASHUA “the Gate City’

Financial Services

Purchasing Department

April 14, 2016
Memo #16-132

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: | PURCHASE OF ACCESS CONTROL AND CAMERA SYSTEM FOR WWTP (VALUE:
$82,532)
DEPARTMENT: 156 EMERGENCY MANAGEMENT
FUND: 2014 STATE HOMELAND SECURITY PROGRAM (SHSP) GRANT
ACTIVITY: SECURITY EQUIPMENT AT WASTEWATER

Please see the attached communication from Justin Kates, Director of Emergency Management
information related to this purchase.

Pursuant to § 5-84 Special purchase procedures A. (5) Purchases from a sole manufacturer, where it
is determined to be more efficient and economical to reduce costs of maintenance of additional repair
parts, supplies or services.

The Director of Emergency Management and the Purchasing Department recommend awarding this
purchase in an amount of $82,532 to Tyco Integrated Security of Nashua, NH.

Respectfully,

Dan Kooken

Purchasing Manager

Ce: B. Codagnone N. Miseirvitch C.O'’Connor —L. Fauteux D. Simmons

229 Main Street « Nashua, New Hampshire 03061 « Phone (603) 589-3330 « Fax (603) 589-3344

Page Image
Finance Committee - Agenda - 4/20/2016 - P2

Finance Committee - Agenda - 4/20/2016 - P3

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

) THE CITY OF NASHUA ‘The Gate City’

Office of Emergency Management

TO: Dan Kooken
Purchasing Manager

SUBJECT: Purchase of Access Control and Camera System For Wastewater Treatment
Plant (Value: $82,531.73)

Funding: 2014 State Homeland Security Program (SHSP) Grant $82,531.73

This project will also install access control on doors to the plant, as well as CCTV cameras to
monitor the grounds around the building. In addition, it will enhance the work completed to
install a sliding electric access gate to include a camera and intercom beyond the keypad
access. This request will improve the security to the City of Nashua’s wastewater facility.
Previous DHS and EPA assessments have identified the lack of access control and the lack of
CCTV as critical gaps in the security of the facility.

Pursuant to NRO § 5-84 (A) (5), these items will be purchased from Tyco Integrated Security
who is currently the provider of access security for the Transit Building, Parking Garages, and

City Hall. Continuing our build out of this integrated access control system will ensure full
interoperability with current and future buildings.

Funding for this project will come from a Department of Homeland Security Grant accepted by
the Board of Aldermen on September 9th, 2015. No local match is required.

The Information Technology Division and this Office recommend the award of this purchase in
the amount of $82,531.73 to Tyco Integrated Security, Nashua, NH.

Thank You,

()

Justin Kates
Director of Emergency Management

Cc: B. Codagnone N. Miseirvitch C.O’Connor L. Fauteux D. Simmons

229 Main Street « Nashua, New Hampshire O3060 Phone (603) 589-3261 © Fax (603) 589-3450

Page Image
Finance Committee - Agenda - 4/20/2016 - P3

Finance Committee - Agenda - 4/20/2016 - P4

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

This agreement is made:

BETWEEN the Owner: City of Nashua, New Hampshire
229 Main Street
Nashua, NH 03060-2019

And the Contractor:

For the following Project:

ARTICLE 1 — THE CONTRACT DOCUMENTS

The Contractor shall complete the work described in the Conti :t Documents for this project. The
documents consist of:

1. This Agreement signed by the Owner and-C. tractor, including the General Terms and Conditions;
Exhibit A - DOL Wage Determination4 ste - Buildirg (Hillsborough County in New

Hampshire), dated 04/01/2016;

3. Exhibit B - Tyco Proposal, dated3/25/.16 — CCTV;

4, Exhibit C - Tyco Proposal, daic 4/01/20 6 — Access System;

5. Exhibit D- Tyco Proposal, dated » 25/2016 — Gate Intercom;

6. Exhibit E- Tyco Proposal, dated 4/1,,7016 — Gate Intercom;
7
8

N

Exhibit F - Contract Timeline;
. Exhibit G- Special Provisions , Federal Clauses;
9. Performance Bond;
10. Insurance Certificate;
11. Executed amendments issued after execution of this Agreement; and
12. Fully Executed City of Nashua Purchase Order

The Contract represents the entire and integrated agreement between the parties and supersedes prior
negotiations, proposals, representations or agreements, either written or oral. Any other documents which
are not listed in this Article are not part of the Contract.

In the event of a conflict between the terms of the Proposal and the terms of this Agreement, a written

change order and/or fully executed Owner Purchase Order, the terms of this Agreement, the written change
order or the fully executed Owner Purchase Order shall control over the terms of the Proposal.

Page 1 of 9

Page Image
Finance Committee - Agenda - 4/20/2016 - P4

Finance Committee - Agenda - 4/20/2016 - P5

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

ARTICLE 2 — DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION DATE

The date of commencement shall be the date of the Notice to Proceed. Substantial Completion shall be

ARTICLE 3 — CONTRACT SUM

Subject to additions and deductions by Change Order, the Owner shall pay Contractor, in accordance with
the Contract Documents, the Contract Sum of:

($ }
The Contract Sum shall include all items and services necessary for the proper execution and completion of
the Work.

ARTICLE 4-— INSURANCE AND INDEMNIFICATION

Contractor shall carry and maintain in effect during the performance of services under this contract:

> General liability insurance in the amount of $1,000,000 per occurrence; $2,000,000 aggregate;
> Motor Vehicle Liability: $1,000,000 Combined Single Limit;

*Coverage must include all owned, non-owned and hired vehicles,

> Workers’ Compensation Coverage in compliance with the State of NH Statutes,
$100,000/$500,000/$100,000.

Contractor and subcontractors at every tier will fully comply vith: “1 RSA Chapter 281-A,
“Workers’ Compensation”.

The parties agree that Contractor shall have the status of and shall pe. “orm all work under this contract as an
independent contractor, maintaining control over all it, oonsultams, sub consultants, contractors, or
subcontractors. The only contractual relationship created/oy ais contract is between the City and
Contractor, and nothing in this contract shall crs), any contractual relationship between the City and
Contractor’s consultants, sub consultants, ce: ‘acters, or subcontractors. The parties also agree that
Contractor is not a City employee and that there sh. ": be nu.

Withholding of income taxes ky he City:

Industrial insurance coverage prov. ‘ed bv the City;

Participation in group insurance plans »/nich may be available to employees of the City;
Participation or contributions by either the independent contractor or the City to the public
employee’s retirement system;

5. Accumulation of vacation leave or sick leave provided by the City;

6. Unemployment compensation coverage provided by the City.

BRYN

Contractor will provide the Owner with certificates of insurance for coverage as listed below and
endorsements affecting coverage required by the contract within ten calendar days after the City issues the
notice of award. The Owner requires thirty days written notice of cancellation or material change in
coverage. The certificates and endorsements for each insurance policy must be signed by a person
authorized by the insurer and who is licensed by the State of New Hampshire. General Liability and Auto

Liability policies must name the Owner as an additional insured and reflect on the certificate of
insurance. Contractor is responsible for filing updated certificates of insurance with the Owner's Risk
Management Department during the life of the contract.

> All deductibles and self-insured retentions shall be fully disclosed in the certificate(s) of insurance.

Page 2 of 9

Page Image
Finance Committee - Agenda - 4/20/2016 - P5

Finance Committee - Agenda - 4/20/2016 - P6

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Wed, 04/20/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2016 - 00:00
Page Number
6
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

> If aggregate limits of less than $2,000,000 are imposed on bodily injury and property damage,
Contractor must maintain umbrella liability insurance of at least $1,000,000. All aggregates must
be fully disclosed on the required certificate of insurance.

> The specified insurance requirements do not relieve Contractor of its responsibilities or limit the
amount of its liability to the City or other persons, and Contractor is encouraged to purchase such
additional insurance, as it deems necessary.

> The insurance provided herein is primary, and no insurance held or owned by the Owner shall be
called upon to contribute to a loss.

> Contractor is responsible for and required to remedy all damage or loss to any property, including
property of the City, caused in whole or part by Contractor or anyone employed, directed, or
supervised by Contractor.

Regardless of any coverage provided by any insurance, Contractor agrees to indemnify and shall defend
and hold harmless the City, its agents, officials, employees and authorized representatives and their
employees from and against any and all suits, causes of action, legal or administrative proceedings,
arbitrations, claims, demands, damages, liabilities, interest, attorney’s fees, costs and expenses of any
kind or nature in any manner caused, occasioned, or contributed to in whole or in part by reason of any
negligent act, omission, or fault or willful misconduct, whether active or passive, of Contractor or of
anyone acting under its direction or control or on its behalf in connection with or incidental to the
performance of this contract. Contractor’s indemnity, defense and hold harmless obligations, or
portions thereof, shall not apply to liability caused by the sole negligence or willful misconduct of the
party indemnified or held harmless.

Page 3 of 9

Page Image
Finance Committee - Agenda - 4/20/2016 - P6

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 672
  • Page 673
  • Page 674
  • Page 675
  • Current page 676
  • Page 677
  • Page 678
  • Page 679
  • Page 680
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact