Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 5311 - 5320 of 38765

Finance Committee - Agenda - 5/3/2016 - P145

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
145
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

RESPONSIBILITIES

OWNER: City of Nashua

CONTRACTOR:

The following documents are attached to and made a part of this Certificate:

[For items to be attached see definition of Substantial Completion as supplemented and other specifically
noted conditions precedent to achieving Substantial Completion as required by Contract Documents.}

This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR’s obligation to complete the Work in accordance with the Contract

Documents.
Executed by ENGINEER on 20
(ENGINEER)
By:
(Authorized Signature)
CONTRACTOR accepts this Certificate of Substantial Completion on, 20
(CONTRACTOR)
By:
(Authorized Signature)
OWNER accepts this Certificate of Substantial Completion on 20
(For the City of Nashua)
By:
(Authorized Signature)
2 of 2

Certificate of Substantial Completion

Page Image
Finance Committee - Agenda - 5/3/2016 - P145

Finance Committee - Agenda - 5/3/2016 - P146

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
146
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

CERTIFICATE OF FINAL COMPLETION

PROJECT:

OWNER’S CONTRACT NO:

DATE OF ISSUANCE:

OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.:

CONTRACTOR:

ENGINEER: DPW Engineering

This Certificate of Final Completion applies to all Work under the Contract Documents or to the following

specified parts thereof:
TO City of Nashua
(OWNER)
And To
(CONTRACTOR)

The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be finally complete in accordance
with the Contract Documents on

(DATE OF FINAL COMPLETION)

This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR’s obligation to complete the Work in accordance with the Contract
Documents. The Warranty for all Work completed expires one year from the date of this Final Acceptance

1 of 2
Certificate of Final Completion

Page Image
Finance Committee - Agenda - 5/3/2016 - P146

Finance Committee - Agenda - 5/3/2016 - P147

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
147
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Executed by ENGINEER on

20

(ENGINEER)

By:

(Authorized Signature)

CONTRACTOR accepts this Certificate of Final Completion on 20
(CONTRACTOR)
By:
(Authorized Signature)
OWNER accepts this Certificate of Final Completion on 20

(For the City of Nashua)

(Authorized Signature)

2 of 2
Certificate of Final Completion

Page Image
Finance Committee - Agenda - 5/3/2016 - P147

Finance Committee - Agenda - 5/3/2016 - P148

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
148
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

CONSENT OF SURETY FOR FINAL PAYMENT

OWNER's Project No.:
Project:
Amount of Contract (including
Type of Contract: Change Orders):
CONTRACTOR:
Contract For: Contract Date:

In accordance with the provisions of the above named contract between the OWNER and the
CONTRACTOR, the following named Surety Company:

On the Payment Bond of the following named CONTRACTOR:

Hereby approves of final payment to the CONTRACTOR, and further agrees that said final payment to
the CONTRACTOR shall not relieve the Surety Company named herein of any of its obligations to the
following named OWNER; as set forth in said Surety Company’s bond:

IN WITNESS WHEREOEF, the Surety Company has hereunto set its hand and seal
this day of of 20

(Name of Surety Company)

(Signature of Authorized Representative)

(Title)
(Affix corporate seal here)

lof 1
Consent of Surety

Page Image
Finance Committee - Agenda - 5/3/2016 - P148

Finance Committee - Agenda - 5/3/2016 - P149

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
149
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

DIVISION 9
CONSTRUCTION
SPECIFICATIONS

As Amended per Addendum # 2 issued March 24, 2016

Page Image
Finance Committee - Agenda - 5/3/2016 - P149

Finance Committee - Agenda - 5/3/2016 - P150

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
150
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

All Items that are not included in the special provision shall comply with the latest approved
NHDOT Standard Specifications for Road and Bridge Construction, the latest approved City of
Nashua Standard Specifications for Road Construction Sewer and Drains, the latest approved
NHDOT Standard Plans for Construction and the latest approved edition of Manual of Uniform
Traffic Control Devices. The most stringent specification shall apply.

Unless otherwise noted all work will be paid for by the quantity actually installed.

Additional Technical Specifications

ITEM ‘670.95’ — TEMPORARY SAFETY FENCE
A. SCOPE

This work shall consist of installation of a temporary safety fence around the project site or as
ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The fencing shall consist of a temporary 6’ tall chain link fence as per the detail
of the plan set provided.

C. MEASUREMENT AND PAYMENT

Temporary Safety Fence will be measured by the number of linear feet installed. Payment for
work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, labor, tools, equipment, disposal of construction debris
(existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P150

Finance Committee - Agenda - 5/3/2016 - P151

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
151
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A’ — STAMPED CONCRETE WALKWAY (6") (COBBLESTONE PATTERN)
A. SCOPE

This work shall consist of installation of a stamped concrete walkway at the location(s) shown
on the layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The concrete shall be installed at a 6” depth and be stamped with a random
cobblestone pattern.

C. MEASUREMENT AND PAYMENT

Stamped Concrete Walkway will be measured by the number of square feet installed. Payment
for work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, concrete, forms, labor, tools, equipment, disposal of
construction debris (existing sidewalk, concrete, asphalt, etc.), and any other incidentals
necessary for the satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P151

Finance Committee - Agenda - 5/3/2016 - P152

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
152
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A (ALT)’ — COBBLESTONE PAVER (OPTION TO REPLACE STAMPED
CONCRETE)

A. SCOPE

This work shall consist of installation of a cobblestone paver walkway at the location(s) shown
on the layout plan or as ordered by the Engineer. The contractor shall submit a sample of the
proposed paver to be used and installation specifications for approval prior to construction.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The pavers shall use a random cobblestone pattern.

C. MEASUREMENT AND PAYMENT

Cobblestone Paver will be measured by the number of square feet installed. Payment for work
under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, pavers, labor, tools, equipment, disposal of construction
debris (existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P152

Finance Committee - Agenda - 5/3/2016 - P153

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
153
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘B’ — STONE DUST PATHWAY (4” DEPTH)
A. SCOPE

This work shall consist of installation of a stone dust walkway at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The pathway shall be a minimum of 5’ wide and 4” in depth.

C. MEASUREMENT AND PAYMENT

Stone Dust Pathway will be measured by the number of square feet installed. Payment for
work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, labor, tools, equipment, disposal of construction debris
(existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P153

Finance Committee - Agenda - 5/3/2016 - P154

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
154
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘C’ —- LOAM AND SEED (4" DEPTH)
A. SCOPE

This work shall consist of installation of loam and seed at the location(s) shown on the layout
plan or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The loam shall be a minimum of 4” in depth.

C. MEASUREMENT AND PAYMENT

Loam and Seed will be measured by the number of square yards installed. Payment for work
under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, material, seed, labor, tools, equipment, disposal of
construction debris (existing sidewalk, concrete, asphalt, etc.), and any other incidentals
necessary for the satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P154

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 528
  • Page 529
  • Page 530
  • Page 531
  • Current page 532
  • Page 533
  • Page 534
  • Page 535
  • Page 536
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact