Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 4851 - 4860 of 38765

Finance Committee - Agenda - 12/7/2016 - P120

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
120
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

@) THE CITY OF NASHUA “the Gate Cy’

Financial Servicer

Purchasing Departonent
September 28, 2016

INVITATION TO BID
Enclosed Pipeline Inspection Camera Van

{FB1040-7102816

The City of Nashua Wastewater Department invites bids from qualified suppliers for one (1) new and unused, model year
2016 of 2017 Enclosed Pipeline inspection Van. There will not be any vehicle traded in.

INSTRUCTIONS TO BIDDERS:

Bids must $e submitted on the Bid-Form, in its entirety with one (1) original and one (1) copy, in.asealed envelope
clearly marked “Enclosed Pipeline Inspection Camera Van" and must be received at the Central Purchasing Office,
229:Main Street, Room 128, Nashua, NH 03066 prior to 3:00 PM on Friday, October 28, 2016, Postmarks or other
timestamps will not be accepted in lieu of actuat delivery. The contractor can use whatever delivery mechanism it:chooses
as long as itremains clear that the contractor is responsible for submissions prior to the date ‘and time. Further details are
available on the City's web site, www.nashuianh.gov, under Services, Current:Bids, document 1FB1040-102816. _

Bids will be opened in public on the due date and time. Results of the bid opening will be pasted on the City's web site,
under Bid Results, within twenty-four (24) hours ofthe opening. Bids must be submitted in the format provided and
address the items specified in the bid package. The City of Nashua may reject any or all of the bids on any basis and
without disclosure of a reason. The failure to make such a disclosure shail not result in accrual of any right, claim or

cause of action by any unsuccessful bidder against the City of Nashua.

Ail bids are binding for sixty (60) days after bid opening. The City is exempt of all taxes. All bids must be FOB delivered,
Nashua Transit System (NTS), 11 Riverside Street, Nashua, NH 03062.

Pursuant to NRO 5-74 (A), the City of Nashua supports the concept of purchasing products. which are-biodegradable, can
be or have been recycled, or are environmentally sound. Due consideration will be given to the purchase-of such
products. If you are bidding on any such products which qualify, please so indicate in a cover sheet by item number and

description.

Pursuant te NRO 5-76 (F}, the purchasing manager shall not solicit a bid from a contractor who is in default on the
payment of taxes, licenses or other moriiés due the city. Therefore, this bid request is vaid as to anyone who is in default

on said payments.
Questions on this Invitation for Bid must be submitted in writing to:

John Stewart
Fleet Manager, City of Nashua

StewartJ@NashuaNH.qov

Respectfully,

Danielle Greenberg
Purchasing Agent Il
City of Nashua

greenberod@nashuanh.gov

iFB1 040-1028 16 Enclosed Pipeline Inspection Camera Van
229 Main Street « Nashua, New Hampshire O3061 » Phone (603) 589-3330 + Fax (603) 589-3233,

Page Image
Finance Committee - Agenda - 12/7/2016 - P120

Finance Committee - Agenda - 12/7/2016 - P121

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
121
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Minimum Specifications for an Enclosed Pipeline inspection Camera Van
General

The Pipeline inspection Van is used by the Wastewater Department for inspection of sanitary sewer lines as well as
storm water drain lines throughout the City of Nashua. This van will carry a video camera inspection system comprised
of a work station desk with multiple video cameras, tool boxes, video monitors, computers, reels of cable and

transporters for the cameras.

1. Manufactures must list the exact specifications for the piece of equipment they are bidding for in each of the
categories listed. if any additional information is to be supplied regarding any items, the manufacturers should refer
to the number beside the item and type his information on blank pages. Failure to respond to any item may be
cause for the bid to be rejected as “non-responsive”.

2. Manufacturers are encouraged to elaborate on any aspect of their machine not listed in the bid specifications but
such explanations should be typed on a blank sheet of paper.

3. inclusion of manufacturer's specifications will not be considered as a substitute for filling in the specifications. It is
encouraged that the manufacturers bid be supplemented by their printed literature.

4. Equipment bid must be new and unused and manufactured in current model year, and ba the manufacturer’s latest

model.

A. Minimurn Specifications

1. 6 Cylinder Turbocharged Diesel engine, 240 HP minimum. Yes

2. Engine must be EPA Tier 4 Emissions.

3. 13 Gallon Diesel Exhaust Fluid Tank. Yes
4. Allison 2200RDS Automatic transmission. ¥és
5, Rear axle ratio of 3.91. Yes
6. A 216” Wheel Base shall be standard. Ye 5S
7. 25,500 Pound Gross Vehicle Weight Rating tes
B, Engine Equipment

8. Alternator shall be 12 Volt rated at a minimum of 270 AMPs. Yes

9, Truck shall have 2 Group 31 threaded stud maintenance free batteries. &

10. Positive load disconnect switch cab mounted outboard driver's seat.

11. Positive and negative posts for jump starts located on frame near starter.

iFB1040-102816 ENCLOSED PIPELINE INSPECTION CAMERA VAN
229 Main Street = Nashua, New Hampshire 03061 © Phone (603) 589-3330 « Fax (G03) 589-3233

Page Image
Finance Committee - Agenda - 12/7/2016 - P121

Finance Committee - Agenda - 12/7/2016 - P122

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
122
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Minimum Specifications for an Enclosed Pipeline inspection Camera Van

12. 950 square inch radiator minimum.

13. Gates Blue Strip Hoses or equivalent.

14. 750 Watt 120 Volt Block Heater.

15. Delco 29MT Starter.

C. Transmission Equipment

16. Allison 2200RDS 5 speed automatic transmission.

17. Water to oil transmission cooler to be in radiator end tank.
D. Axle and Air Brake Configurations.

18. Front axle shall be rated at 10,000 LBS.

19. Front brakes shall be 15x5 O+ Meritor with non-asbestos linings.
20. Meritor automatic slack adjustors shall be standard.

21, TRW THP-60 Power steering shall be standard.

22. Power steering shall have a2 quart see through reservair.
| 23. Truck shall ‘be e4tioned with a front sway: bar standard,
24. Rear axle shall be rated at 17,500 LBS.

25.3.91 rear axle ratio standard.

26. Driver controlled traction differential shall be standard.
27. Meritor Q+ 15x8.62 rear brakes with non-asbestos linings.
28. Brake cams and chambers te be on front side of rear axle.
29. Meritor automatic slack adjusters on rear axle brakes.

30. Synthetic 75W90 Rear Axle Lube standard.

31. Shock absorbers on both axtes will be standard.

32. Aluminum air tanks shall be standard.

iret 040-1028 16 ENCLOSED PIPELINE INSPECTION CAMERA VAN

Yes

yes

VES

Yes

Yes
YCs

Ye S

229 Main Street « Nashua, New Hampshire 03067 « Phone (603) 589-3330 « Fax (803) 589-3233

Page Image
Finance Committee - Agenda - 12/7/2016 - P122

Finance Committee - Agenda - 12/7/2016 - P123

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
123
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Minimum Specifications for an Enclosed Pipeline inspection Camera Van

E. Frame Specifications
33. 90” Rear frame overhang.
Frame overhang range 81 to 90 inch.
Calculated back of cab to rear suspension C/L: 150.45 inch
Calculated effective back of cab to rear suspension C/L: 147.45
Calculated frame tength- overall: 335.39
Calculated space available for deckplate 150.45 inch
34. Painted front bumper with collapsible ends.
35. Frame mounted front tew hooks.
F. Fuel Tanks
36. 80 Galion aluminum fuel tank standard.
G. Tires
37. Michelin 245/70R19.5 16 Ply Radial Front Steer Tires.
38. Michelin 245/70R19.5 16 Ply Radial Rear Snow Tites.
39. Accuride 29195 19.5x7.5 10 Hub Pilot 5.96 inset 5 hand hole front wheels.
40. Accuride 29195 19.5x7.5 10 Hub Pilot 5 hand steel disc rear wheels,
41. Conmet Preset Plus tron Hubs on Front and Rear.
H. Cab
42. Cab shail be made of aluminum.
43. Exterior grab handles on LH and RH will be standard.

44, Dual 24” Aluminum air horns mounted on the cab roof.

45. Dual west coast heated mirrors mounted on doors with LH and RH remote.
46. 102” Equipment width mirrors.

47. RH down view mirror
48. LH and RH 8 inch stainless convex mirrors mounted under primary mirrors.

49. LH and RH & inch stainless steel fender mounted convex mirrors mounted

1FB1040-1025816 ENCLOSED PIPELINE INSPECTION CAMERA VAN

229 Main Street ¢ Nashua, New Hampshire 03061 « Phone (603) 589-2330 « Fax {603) 589-3233

Page Image
Finance Committee - Agenda - 12/7/2016 - P123

Finance Committee - Agenda - 12/7/2016 - P124

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
124
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Minimum Specifications for an Enclosed Pipeline inspection Camera Van

on stainless steel tripods. 2. S
¥eéS

50. Cab shall have standard Air Conditioning and Heat.

51. Driver and Passenger seats shall be Premium High Back Air Suspension style
covered in a heavy duty cloth fabric .

52. Gauges shall be standard factory gauges. ye S

53. Truck shall be equipped with a self-adjusting Back Up alarm. ‘6 S
54. Radio shall be AM/FM with CD player. t0/ Buebsth Yes

55.2 on/off rocker switches in the dash with indicator lights and wire routed
to back of cab labeled opt.

1. Body
Ye:

56. Body shail be an Aluminum Dry Freight body 20 foot fong, 8 foot wide. S
57. Interior dimensions shall be 85H x 243”"L x 93°W. YES
58. Rear doors shall be “Barn Doors”, 88”W X 78” H ve. Ss
59. Body flaor shall be smooth 1 1/8” hardwood, fastened to subframe with 2 counter-

_ Sunk screws per floor board per crossmember ina staggered pattern. ye?
60. Body floor boards shalj be undercoated. VEC 5

61. Threshold shail be steel galvanized angle flush to rear.

!

62. interior rear body shall be free of tie downs or load strapping or covering on the wails. i

63. Roof shafl be one piece aluminum, .032 thick with anti-sag roof bows an 24” centers
with crowned roof design.

64. Full width drop step for under-ride protection with pooched 10” step surface.

65. 10” Dock extension consisting of steel diamond plate farmed cover over a hardwood
Filler painted black.

66. Aluminum grab handles mounted on LH and RH rear of body.

67. All lighting shall meet Federal Motor Vehicle Safety Standards.

FER RP

1FB1040-102816 ENCLOSED PIPELINE INSPECTION CAMERA VAN
229 Main Sueet e Nashua, New Hampshire 03061 = Phane (603) 589-3330 « Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 12/7/2016 - P124

Finance Committee - Agenda - 12/7/2016 - P125

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
125
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Minimum Specifications for an Enclosed Pipeline inspection Camera Van

4. Warranties
68. Engine shall have a 5 year, 100,000 mile warranty.
69. After-treatment system shall have a 5 year, 100,000 mile warranty.

70. Transmission shall have a 5 year unlimited mile warranty.

K. Manuals

71. Repair manuals shall be provided.

72. Online website subscription shall be included for engine diagnostics.
L. Transportation

73. Winning vendor shall incur all expenses to transport the chassis to the
body installation vendor and to the camera installation vendor in

Mt Sterling, Kentucky.
M. Vehicle color

74. Color of cab and body shall be dark blue.

iFB1040- 102816 ENCLOSED PIPELINE INSPECTION CAMERA VAN

Kes

¥es
_ Yes

_ es
yes

YES

229 Main Steet » Nashua, New Hampshire 03061 » Phone (G03) 589-3330 » Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 12/7/2016 - P125

Finance Committee - Agenda - 12/7/2016 - P126

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
126
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Prepared for: Prepared by:

John Stewart Bryan Sansouci
State of NH = (City of Nashua) FREIGHTLINER OF NEW
229 Main St HAMPSHIRE, INC.
Nashua, NH 03061 ROUTE 102
Phone: 603-589-4714 LONDONDERRY, NH 03053

Phone: 603-421-9000

A proposal for
State of NH (City of Nashua)

Prepared by
FREIGHTLINER OF NEW HAMPSHIRE, INC.
Bryan Sansouci .

Oct 26, 2016

Freightliner M2 106

Components shown may not reflect all spec’d options and are not to scale

Application Version 9.1.016 M4 40/26/2016 3:15 PM
Data Version PRL-14M.004 FREIGHTLINER

Nashua camera Page 1 of 18

Page Image
Finance Committee - Agenda - 12/7/2016 - P126

Finance Committee - Agenda - 12/7/2016 - P127

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
127
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Prepared by:

Prepared for:
John Stewart Bryan Sansouc
State of NH (City of Nashua) FREIGHTLINER OF NEW
229 Main St HAMPSHIRE, INC.
Nashua, NH 03061 ROUTE 102
Phone: 603-589-4714 LONDONDERRY, NH 03053
Phone: 603-421-9000

SPECIFICATION PROPOSAL

: So es Weight. . Weight Ck
Data Code Description Front Rear Retail Price

“001-172 M2106 CONVENTIONAL C CHASSIS 5,759 3,503 $98,616.00
004-217 2017 MODEL YEAR SPECIFIED STD
002-004 SET BACK AXLE - TRUCK STD
019-002 STRAIGHT TRUCK PROVISION STD
LH PRIMARY STEERING LOCATION STD
TRUCK CONFIGURATION “STD
DOMICILED, USA (EXCLUDING CALIFORNIA AND sto
CARB OPT-IN STATES)
A85-002 PICKUP AND DELIVERY/SHORT HAUL SERVICE STD
A84-1GM GOVERNMENT BUSINESS SEGMENT NIC
AAL0411 FIXED LOAD COMMODITY NIC
AAS-002 TERRAIN/DUTY: 100% (ALL) OF THE TIME, IN STD
TRANSIT, IS SPENT ON PAVED ROADS
AB1-008 MAXIMUM 8% EXPECTED GRADE sTD
ABS-001 SMOOTH CONCRETE OR ASPHALT PAVEMENT - STD
MOST SEVERE IN-TRANSIT (BETWEEN SITES)
ROAD SURFACE
995-091 MEDIUM TRUCK WARRANTY STD
AG6-99D EXPECTED FRONT AXLE(S) LOAD : 8000.0 Ibs
A68-99D EXPECTED REAR DRIVE AXLE(S) LOAD :
1750.0 ibs
A67-99D EXPECTED PUSHER AXLE(S) LOAD : 0.0 Ibs
A63-89D EXPECTED GROSS VEHICLE WEIGHT CAPACITY

> 25500.0 Ibs

Application Version 9.1.016 10/26/2016 3:15 PM

Data Version PRL-14M.001 ikon
Nashua camera Page 2 of 18

Page Image
Finance Committee - Agenda - 12/7/2016 - P127

Finance Committee - Agenda - 12/7/2016 - P128

By dnadmin on Mon, 11/07/2022 - 09:47
Document Date
Wed, 12/07/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/07/2016 - 00:00
Page Number
128
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120720…

Prepared by:

Prepared for:
John Stewart Bryan Sansouci
State of NH (City of Nashua) FREIGHTLINER OF NEW
229 Main St HAMPSHIRE, INC.
Nashua, NH 03061 ROUTE 102
Phone: 603-589-4714 LONDONDERRY, NH 03053
Phone: 603-421-9000
Weight Weight
Data Code Description Front Rear Retail Price
AA3-001 DRY VAN BOBY STD
AF7-99D EXPECTED BODY/PAYLOAD CG HEIGHT ABOVE

FRAME "XX" INCHES : 32.0 in

4012GD ss CUMISB 6,7-240 240 HP @2300RPM, 2600GOV,—~™~” "$1,954.00 |

560 LBFT @ 1600 nee

“794072 72MPHROADSPEEDLIMT . NIC
79B-000 CRUISE CONTROL SPEED LIMIT SAME AS ROAD NIC
SPEED LIMIT
79K-007 PTO MODE ENGINE RPM LIMIT - 1100 RPM NIG
79P-002 PTO RPM WITH CRUISE SET SWITCH - 700 RPM NIC
790-003 PTO RPM WITH CRUISE RESUME SWITCH - 200 NIC
798-001 PTO MODE CANCEL VEHICLE SPEED - 5 MPH NIC
79U-007 PTO GOVERNOR RAMP RATE - 250 RPM PER NIC
SECOND
806-002 PTO MINIMUM RPM - 700 NIC

80J-002 REGEN INHIBIT SPEED TES “5 MPH NIC

~ 2016 ONBOARD Beneerieseos
EPA/CARB/GHG17 BUT NOT FINAL GHG17

" 990-016

CONFIGURATION
99D-010 NO 2008 CARB EMISSION CERTIFICATION N/C
13E-001 STANDARD OIL PAN STD
105-001 ENGINE MOUNTED COIL CHECK AND FILL STD
133-004 ONE PIECE VALVE COVER STO
074-099 SIDE OF HOOD AIR INTAKE WITH FIREWALL STD
MOUNTED DONALBSON AIR CLEANER
424-iCC LN 12V 270 AMP 4949PGH PAD MOUNT 10 $832.00
ALTERNATOR WITH AC TAPS
292-098 (2) ALLIANCE MODEL 1231, GROUP 31, 12 VOLT $41.00
MAINTENANCE FREE 2250 CCA THREADED
STUD BATTERIES
290-1CDB BATTERY BOX WITH ALUMINUM COVER $245.00
MOUNTED SHORT SIDE TO RAIL
281-001 STANDARD BATTERY JUMPERS STD
282-003 SINGLE BATTERY BOX FRAME MOUNTED LH NIC
SIDE BACK OF CAB
291-017 WIRE GROUND RETURN FOR BATTERY CABLES STO

WITH ADDITIONAL FRAME GROUND RETURN
Application Version 9.1.016

mp 4 10/26/2016 3:15 PM
Data Version PRL-14M.001 tate

Nashua camera Page 3 of 18

Page Image
Finance Committee - Agenda - 12/7/2016 - P128

Finance Committee - Agenda - 4/20/2022 - P72

By dnadmin on Sun, 11/06/2022 - 21:43
Document Date
Fri, 04/15/2022 - 11:50
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2022 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

HOMEOWNER OPPORTUNITY PROGRAM:

HURRICANES IKE & DOLLY
TEXAS GENERAL LAND USE OFFICE (GLO)

Pre
era
= cm

=—

PROJECT DESCRIPTION

MCL served as the Program Manager for GLO’s pilot
“Homeowner Opportunity Program” (HOP), which entailed
creating policy and procedures, providing direct mobility
counseling services to homeowners who voluntarily
relocated to promote housing choice and affirmatively
further fair housing, and vendor management for provision
of real estate and title clearance services in the wake of
Hurricanes Ike and Dolly (round 2 CDBG-DR program}, HOP
involved relocation of low-income applicants in FEMA-
designated high-risk areas or areas of high minority or
poverty concentration to higher opportunity areas. The MCL
Team drafted and implemented policies and procedures
involving the provision of real estate services, housing
counseling, protection of housing choice, affirmatively
furthering fair housing, URA regulations concerning real
property acquisition and rights of displaced persons.

We were tasked with determining program eligibility,
conducting counseling to determine housing preferences
and requisite amenities for relocated households, grant
execution, real estate closing, and applicant management
through closeout. To achieve the goals of

the program, MCL was tasked with coordination and
collaboration with multiple vendors contracted to deliver
specific aspects of the program. We spearheaded
orchestration of legal services for title clearance, provision
of real estate services, environmental reviews, and
construction, allowing the program to serve hundreds of
applicants who were successfully relocated to safe,
sanitary homes.

@) Resilience + Recovery

KEY PROJECT FEATURES
¢ CDBG-DR Housing Program Design,
Management & Closeout

©
QE ax

Texas General Land Use Office

CONTACT

Jorge Ramirez

Deputy Director; Coastal Resiliency
and Recovery Program

(512) 463.5001
Jorge.ramirez@glo.tx.gov

PROJECT DATES
2012-2017

CONTRACT VALUE
$5,920,457

PROJECT PERSONNEL
INCLUDED IN THIS

PROPOSAL
Jenna Abbey

Justin Cauley

www. femarecoveryteam.com|
1821 Commerciat Drive, Suite S, Harvey, LA 70058

Page Image
Finance Committee - Agenda - 4/20/2022 - P72

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 482
  • Page 483
  • Page 484
  • Page 485
  • Current page 486
  • Page 487
  • Page 488
  • Page 489
  • Page 490
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact