Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 26031 - 26040 of 38765

Finance Committee - Agenda - 11/15/2017 - P364

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
364
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 62 70
SCADA COMPUTERS AND SOFTWARE

PART 1-— GENERAL
1.01 SUMMARY
A. Section Includes

1. Provide labor, materials, equipment and incidentals, as shown, specified
and required to furnish, install, and test the new computer system, including
human machine interface (HMI), computers, supervisory control and data
acquisition (SCADA) software and remote access hardware, in accordance
with this Section.

1.02 PRICE AND PAYMENT PROCEDURES

A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.
1.04 SUBMITTALS

A. Submit in accordance with Division 01 General Requirements.

B. Shop Drawings

1. Manufacturer’s literature, illustrations, Specifications, Drawings, data, and
descriptive literature on all pieces of equipment

2. Deviations from Drawings and Specifications
3. Engineering data including dimensions, materials, size, and weight
4. Fabrication, assembly, installation and wiring diagrams

C. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.

1.05 QUALITY ASSURANCE

A. Provide in accordance with Division 01 General Requirements.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P364

Finance Committee - Agenda - 11/15/2017 - P365

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
365
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.06 DELIVERY, STORAGE, AND HANDLING

A.

B.

C.

D.

Provide in accordance with Division 01 General Requirements.
Deliver equipment as directed to ensure uninterrupted progress of the Work.

Handle computer equipment very carefully. Damaged computer equipment will be
rejected.

Store equipment to permit easy access for inspection and identification.

1.07. SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

1.08 WARRANTY

A.

Computer 3-year basic limited warranty and 3-year next business day (NBD) on
Site service.

Software: Provide 1 year extended warranty, with software version upgrades,
telephone technical support and online web based download area and Knowledge
Base. Include customer support through a factory trained Engineer or technician
available 24 hours, 7 days a week.

PART 2-— PRODUCTS

2.01 RACK MOUNTED COMPUTER

A.

Furnish 1 Dell R730 rackmount computer with the following features.

1. PowerEdge R730 Server (210-ACXU)

2. PowerEdge R730/R730xd Motherboard (591-BBCH)

3. Dell Hardware Limited Warranty Plus On Site Service (976-8706)

4. MISSION CRITICAL PACKAGE: Enhanced Services, 3 Year (976-8709)
Mission Critical Package: 4-Hour 7x24 On-Site Service with Emergency
Dispatch, 3 Year (976-8710)

5. ProSupport: 7x24 HW / SW Tech Support and Assistance, 3 Year (976-
8711)

6. On-Site Installation Declined (900-9997) US Order (332-1286) PowerEdge
R730 Shipping (340-AKKB) R730/xd PCle Riser 2, Center (330-BBCO)

7. R730 PCle Riser 3, Left (330-BBCQ)

SCADA COMPUTERS AND SOFTWARE

WOODARD & CURRAN 40 62 70-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P365

Finance Committee - Agenda - 11/15/2017 - P366

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
366
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

8. R730/xd PCle Riser 1, Right (330-BBCR)

9. Intel Ethernet X540 DP 10Gb BT + I350 1Gb BT DP Network Daughter
Card (540-BBCC) Intel Ethernet I350 QP 1Gb Network Interface Card (xx)
VFlash, 8GB SD Card for iDRAC Enterprise (385-BBCB)

10. iDRAC8 Enterprise, integrated Dell Remote Access Controller, Enterprise
(385-BBHO) Chassis with up to 16, 2.5" Hard Drives (350-BBEP) Bezel
(350-BBEJ) Performance BIOS Settings (384-BBBL) No RAID for
H330/H730/H730P (1-16 HDDs or SSDs) (780-BBJS) PERC H730
Integrated RAID Controller, 1GB Cache (405-AAEG) Intel Xeon E5-2630
v3 2.4GHz,20M Cache,8.00GT/s QPL, Turbo,HT,8C/16T (85W) Max Mem
1866MHz (338-BFFU)

11. Upgrade to Two Intel Xeon E5-2630 v3 2.4GHz,20M Cache,8.00GT/s
QPILTurbo,HT,8C/16T (85W) (374-BBHD) 16GB RDIMM, 2133 MT/s,
Dual Rank, x4 Data Width (370-ABUG) 16 2133MT/s RDIMMs (370-
ABUF) Performance Optimized (370-AAIP) 300GB 10K RPM SAS 6Gbps
2.5in Hot-plug Hard Drive,13G (400-AEEC) x 6 Electronic System
Documentation and OpenManage DVD Kit, PowerEdge R730/xd (631-
AAJG).

12. DVD+/-RW, SATA, Internal (429-A APS)

13. ReadyRails Sliding Rails With Cable Management Arm (770-BBBR) Dual,
Hot-plug, Redundant Power Supply (1+1), 750W (450-ADWS) NEMA 5-
15P to C13 Wall Plug, 125 Volt, 15 AMP, 10 Feet (3m), Power Cord, North
America (450-AALV) 2 Internal Dual SD Module (330-BBCL) Redundant
SD Cards Enabled (385-BBCF) 8GB SD Card For IDSDM (385-BBIF)
8GB SD Card For IDSDM (385-BBIF) No Operating System (619-ABVR)
No Media Required (421-5736) DIMM Blanks for System with 2
Processors (370-ABWE) Standard Heatsink for PowerEdge R730/R730xd
(374-BBHM) Standard Heatsink for PowerEdge R730/R730xd (374-
BBHM)

14. Contact Bob Born of Axis Business Solutions (Phone: 603-294-4669) for
quotation and reference quote number AXSQ80744.

15. Provide additional network interface card.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-3

Page Image
Finance Committee - Agenda - 11/15/2017 - P366

Finance Committee - Agenda - 11/15/2017 - P367

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
367
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2.02 DESKTOP COMPUTERS AND ACCESSORIES

A. Furnish (5) Dell® Optiplex 7050 Desktop computers as indicated on drawings with
features as follows.

1. Processor: Intel® Core 13-7100 Processor 3.9 GHz, 4M, L2
2. Chassis configuration: Micro Form Factor

3. Memory: 32GB DDR4 Non-ECC SDRAM, 2400 MHz.

4. Keyboard: USB keyboard, no hotkeys.

5. Monitor: 24 inch widescreen flat panel LCD.

6. Mouse: USB optical mouse with scroll.

7. Hard drive: 128GB SATA solid state drive

8. Video: 256MB NVDIA® video card.

9. Audio: Integrated audio.
10. — Ports (minimum)

a. USB: 6

b. HDMI: 1

C. Serial: 1

11. Operating system: Microsoft Windows 10 Professional, 64 Bit ®
12. | Network Adapter

B. Provide 4 computer stands Dell 482-BBBP or equivalent. Stand shall be mounted
to back of control panel door to hold computer in place.

C. Provide 4 Industrial Monitors: Automation Direct ATM1900 or equivalent

D. Provide 4 DVI for HDMI video adapters for above monitors

E. Provide 1 desktop monitor 24 inch LED type, Dell or equivalent

F. Provide two 1000VA, 120VAC, UPS units: APC SMT1000 or equivalent

G. Provide 4 shelves for keyboard and mouse sets. Fasten to control panel door

exterior below monitor.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-4

Page Image
Finance Committee - Agenda - 11/15/2017 - P367

Finance Committee - Agenda - 11/15/2017 - P368

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
368
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

H. Locations for the five desktop computers shall be in two new panels (Gallery
Computer panel, Pump Building panel), two existing panels (Wet Weather CP-21,
Sedimentation CP-31) and on desk in main office. For panels, install computers and

industrial monitors similar to detail as shown on Gallery Computer Panel drawing
(1-2800).

2.03 SOFTWARE UPGRADES AND REGISTRATION

A. Provide upgrade of all software packages as listed in Table 40 62 70-1 to current
editions. Coordinate upgrade of software packages using serial numbers from
Owner as listed. Provide desired “Designated for (After Upgrade)” use as tabulated.
Some items require a trade-in for other items. Bidder shall work with local
Rockwell Software vendor (Horizon Solutions) to determine costing of upgrades
and include with bid. Contact Owner or Engineer for additional clarifications if
necessary.

B. Register all software licenses to Owner
2.04 SOURCE QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.

PART 3— EXECUTION (NOT USED)

END OF SECTION

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-5

Page Image
Finance Committee - Agenda - 11/15/2017 - P368

Finance Committee - Agenda - 11/15/2017 - P369

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
369
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-6

Page Image
Finance Committee - Agenda - 11/15/2017 - P369

Finance Committee - Agenda - 11/15/2017 - P370

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
370
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

SUIYIe|| JBAIAS - TVAVOS 39 UOHRIPA PABPURIS OOOS OIPNIS | T WINAOOECTY-7CE6 ff PESeyrind II4
dojde] Apuey qual|D UOHRIPA PABPURIS OOOS OIPNIS | T WNAO0ECTH-7ZE6| dojdeq Apuey
aulyse|| JOAIaS -TVGVIS) |PWON| = Mys 917 Aeldsiq JUN 4S JaAsas MalA 14 /T ANAVOOOSSMA-TOZ6| VOGOTO9SSZ
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON asldsajuq MalA 14 404 OIPNIS 14 /T ANALSMA-TOZ6| 6V8TO006CSZ
GALINIINA OLNIAGVYL- cvdvos) = JEWJON Ae|dsiq OOT JaAsas 4S MAIA 14|T ANAVOOTSSMA-TOZ6| 99TTOOLCSZ
GALINIINA OLNIAGVYL- cvdvos) = JEWJON Ae|dsiq OOT JaAsas 4S MAIA 14|T ANAVOOTSSMA-TOZ6| S9TTOOLCSZ
doyyjseq Wooy Aydos{) = |eWJON WUal|D AS MAIA L4AIT ANAVMISMA-TO0Z6| POZS90VCSZC
Z doyysaq Jayjyeay eM] = |EWJON WUal|D AS MAIA L4AIT ANAVMOSMA-TOL6| ZSv6007cS7
T doyysaq Jayjeay eM] = JEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZL6| 8T C8007CS7
UaasJosyono] Suajemaq| |eWJON WUal|D AS MAIA L4AIT ANAVMOISMA-TOZL6| CVT8007CS7
dojzyJseq Suuajzemaq) |eWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZ6| PO8EDOVCSZ
doyjsaq sulpjing dung) = JEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZ6| ECO8EOOVCSZ
doyjsad Z suolesadg Did} = |EWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| PESEDOVCSZ
dosed T suoiesadg Did} = |PEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| CE9EDOVCSC
doyjseq VAVIS a|9ON| = |PWON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| CESEOOVCSZ
| doyde] Apuey| = |eWJoNn Alossazay MalA|aued |T EQN-TTLZC| TSOOEOTOEC
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON UOHIPZ BUIYe|] 404 OIPNIS MA!IA L4A|T ANANLSMA-TOZ6 | 9ET6VOLIST
| doyde] Apuey| = |eWJoNn UOHIPZ BUIYe|] 404 OIPNIS MA!IA L4A|T ANANLSMA-TOZ6| ZSS7O0r9ST
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON JAAIAS IISSe[D UEMO3SIH 4/21 AsO} |T OOTZSLSH-8S€6| ZS8TOOZEST
| doyde] Apuey| = |eWJoNn NJ aemyos psepuels OOS XIS07Sy|T ANAOOEOTY-7ZE6 | 8CTLSTCTOT
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON NJ aemyos psepuels OOS XIS07Sy|T ANAOOEOTY-72E6 | TVZCLOCTOT
(apessdy¢ say) 404 pajeuzisag snjeqs uo!dii9saq | sjjeysuy Jaquinn sojezeD ON [elas

SWEISO1d BIEMIJOS BulysIxq JO 3s!]

T-OZ 29 OF FIGEL

Page Image
Finance Committee - Agenda - 11/15/2017 - P370

Finance Committee - Agenda - 11/15/2017 - P371

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
371
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

This page intentionally left blank

Page Image
Finance Committee - Agenda - 11/15/2017 - P371

Finance Committee - Agenda - 11/15/2017 - P372

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
372
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 63 43
PROGRAMMABLE LOGIC CONTROLLERS
PART 1 —- GENERAL
1.01 SUMMARY
A. Section Includes
1. Provide labor, materials, equipment, and appurtenances to furnish and

install the programmable logic controllers and operator interface terminals
as specified and on the Drawings in accordance with this Section.

2. Definitions
a. PLC: Programmable Logic Controller
b. RIO: Remote Input/Output Rack

OIT: Operator Interface Terminal
HMI: Human Machine Interface
€. RTU: Remote Terminal Unit

a 0

f. 1/O: Input Output
g. SCADA: Supervisory Control and Data Acquisition

3. Work not included

a. PLC programming, HMI/OIT screen development, and integration
of new SCADA system will be provided by Engineer.

1.02 PRICE AND PAYMENT PROCEDURES

A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.

1.04 SUBMITTALS

A. Submit in accordance with Division 01 General Requirements.

B. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.

C. Provide manufacturer’s descriptive literature (product data in the form of catalog

cut sheets) for each piece of equipment.

PROGRAMMABLE LOGIC CONTROLLERS
WOODARD & CURRAN 40 63 43-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P372

Finance Committee - Agenda - 11/15/2017 - P373

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
373
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.05 QUALITY ASSURANCE
A. Provide in accordance with Division 01 General Requirements.

B. PLCs and OITs provided under this Contract shall comply with the Specifications,
shall be supplied from manufacturers regularly engaged in the production of such
products, shall be standard products wherever possible, and shall be of the
manufacturer’s latest design.

C. This Specification has been developed to establish minimum requirements for the
solid-state programmable controllers and OITs designed to provide high reliability
in industrial applications. All PLCs, OITs, and associated software provided under
this Contract shall meet the requirements of this Specification unless approved by
the Engineer. If production of equipment is discontinued, the Contractor shall
submit an alternate of comparable quality to the Engineer for approval prior to
execution of Work, and at no additional cost to Owner.

1.06 DELIVERY, STORAGE, AND HANDLING
A. Provide in accordance with Division 01 General Requirements.

1. Coordinate equipment, instrument, and material delivery to coincide with
the Project schedule. If the delivery schedule of any equipment, instrument,
or material shall affect the overall Project schedule, notify the Engineer in
writing immediately. Include in the written notification, documentation
from the equipment Supplier indicating the revised delivery schedule and
reason for the change.

2. When applicable, coordinate delivery equipment, instruments, or materials
to be delivered directly to another trade or vendor for installation in a system
or control panel provided under another Specification section.

3. Repair or replace, at no additional cost to the Owner, all equipment,
instruments and materials that are defective or damaged during installation,
to the satisfaction of the Engineer.

B. Packing, Shipping, Handling, and Unloading

1. Exercise care while loading, unloading and transporting equipment,
instruments and materials to avoid damage. Check all equipment,
instruments, and materials for damage or defects within 7 days of delivery
to the Project Site.

C. Storage and Protection

1. Equipment, instruments, and materials required to be stored on Site prior to
installation shall be stored in such a manner to avoid damage or exposure to
water, dust, or construction debris.

PROGRAMMABLE LOGIC CONTROLLERS
WOODARD & CURRAN 40 63 43-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P373

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2600
  • Page 2601
  • Page 2602
  • Page 2603
  • Current page 2604
  • Page 2605
  • Page 2606
  • Page 2607
  • Page 2608
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact