Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 24371 - 24380 of 38765

Finance Committee - Agenda - 5/17/2017 - P280

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
280
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 01330

SUBMITTALS

SHOP AND WORKING DRAWINGS

A.

As required by the General Conditions, Contractor shall submit a schedule of shop and
working drawing submittals.

In accordance with the accepted schedule, the Contractor shall submit promptly to the
Engineer, through its authorized resident representative at the job site, or by mail, three
(3) copies each of shop or working drawings required as noted in the specifications, of
equipment, structural details and materials fabricated especially for this Contract.

Such drawings shall show the principal dimensions, weight, structural and operating
features, space required, clearances, type and/or brand of finish of shop coat, grease
fittings, etc., depending on the subject of the drawings. When it is customary to do so, when
the dimensions are of particular importance, or when so specified, the drawings shall be
certified by the manufacturer or fabricator as correct for this Contract.

All shop and working drawings shall be submitted to the Engineer by and/or through the
Contractor, who shall be responsible for obtaining shop and working drawings from his
subcontractors and returning reviewed drawings to them.

Only drawings which have been prepared, checked and corrected by the fabricator should
be submitted to the Contractor by his subcontractors and vendors. Prior to submitting
drawings to the Engineer, the Contractor shall check thoroughly all such drawings to
satisfy himself/herself that the subject matter thereof conforms to the Contract Documents
in all respects. Shop drawings shall be reviewed and marked with the date, checker's name
and indication of the Contractor's approval, and only then shall be submitted to the
Engineer. Shop drawings unsatisfactory to the Contractor shall be returned directly to their
source for correction, without submittal to the Engineer. Shop drawings submitted to the
Engineer without the Contractor's approval stamp and signature will be rejected. Any
deviation from the Contract Documents indicated on the shop drawings must be identified on
the drawings and in a separate submittal to the Engineer, as required under subsection 6.17
Shop Drawings and Samples; D. Submittal Procedures, Paragraph 3 of the General
Conditions.

The Contractor shall be responsible for the prompt submittal and re-submittal, as
necessary, of all shop and working drawings so that there will be no delay in the work due to
the absence of such drawings.

The Engineer will review the shop and working drawings as to their general
conformance with the design concept of the project and general compliance with the
information given in the Contract Documents. Corrections of comments made on the
drawings during the review do not relieve the Contractor from compliance with
requirements of the Contract Documents. The Contractor is responsible for: confirming and
correlating all quantities and dimensions; selecting fabrication processes and

01330-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P280

Finance Committee - Agenda - 5/17/2017 - P281

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
281
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

techniques of construction; coordinating his work with that of all other trades; and
performing his work in a safe and satisfactory manner. The review of the shop drawings is
general and shall not relieve the Contractor of the responsibility for details of design,
dimensions, code compliance, etc., necessary for interfacing with other components, proper
fitting and construction of the work required by the Contract and for achieving the specified
performance.

With few exceptions, shop drawings will be reviewed and returned to the Contractor within
15 days of submittal.

No material or equipment shall be purchased or fabricated especially for this Contract nor
shall the Contractor proceed with any portion of the work, the design and details of which are
dependent upon the design and details of equipment or other features for which review is
required, until the required shop and working drawings have been submitted and reviewed
by the Engineer as to their general conformance and compliance with the project and its
Contract Documents. All materials and work involved in the construction shall then be as
represented by said drawings.

Two copies of the shop and working drawings and/or catalog cuts will be returned to the
Contractor. The Contractor shall furnish additional copies of such drawings or catalog cuts
when he needs more than two copies or when so requested.

END OF SECTION

01330-2

Page Image
Finance Committee - Agenda - 5/17/2017 - P281

Finance Committee - Agenda - 5/17/2017 - P282

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
282
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 01331

DOCUMENTATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. This section covers the requirements for documentation to be furnished by the

Contractor on this project.

1.02 RELATED WORK:

A. Section 02441, CLEANING, TELEVISION INSPECTION, & TESTING OF NEW
PIPELINES

1.03 DOCUMENTATION:

A. — The Contractor shall maintain printed television inspection logs of sewer segments, for
each sewer line segment undergoing replacement under this contract and provide two (2)
copies of the logs within five (5) working days of the work being performed. Log sheet
format shall be approved by Engineer prior to start of work.

B. The log sheet(s) as a minimum shall clearly identify:

1. Project Name

2. Street Location, Name, Intersection, Station

3. Date of inspection

4. Total Length of Line Inspected

5. Line Size(s)/Joint Spacing/Type

6. Line and Manhole(s) Condition

7. Significant observations such as service connections, offset joints, drop joints,
broken/cracked pipe, protruding services, roots, collapsed sections, infiltration,

presence of scale and corrosion and other discernible features.

8. Videocassette number, including tape counter (beginning and ending) location.

01331-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P282

Finance Committee - Agenda - 5/17/2017 - P283

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
283
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

All television inspection shall be recorded on VMS format system that utilitizes ¥2-inch
recording videotapes and the SLR mode. The Contractor shall provide two (2) original and
labeled copies of each videotape to the Owner, at no additional cost, at the end of the
project. All VCR videotapes shall have a typed label listing tape number, date work
was performed, “City of Nashua’, contract number and sub area designation. Each tape
shall be referenced in a logbook that details upstream and downstream sub area and
manhole designations, street names, pipe diameter and length.

END OF SECTION

01331-2

Page Image
Finance Committee - Agenda - 5/17/2017 - P283

Finance Committee - Agenda - 5/17/2017 - P284

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
284
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 01550

TRAFFIC CONTROL AND SIGNAGE

PART 1 - GENERAL

1.01

1.02

WORK INCLUDED:
This Section covers furnishing and installing traffic control signs and other devices.
SYSTEM DESCRIPTION:
The Contractor shall furnish and install all construction signs deemed necessary by and in

accordance with the latest edition of Part VI of the Manual on Uniform Traffic Control
Deyices (MUTCD) as published by the U.S. Department of Transportation.

PART 2 - PRODUCTS

2.01

TRAFFIC WARNING AND REGULATING DEVICES:

Contractor shall provide warning signs, barricades and other devices in accordance with the
specifications provided in the MUTCD. Size of signs, lettering, colors, method of support and
other factors prescribed in the MUTCD shall be adhered to.

PART 3 - EXECUTION

3.01

INSTALLATION:

A. Contractor shall erect barricades, barrier fences, traffic signs, and other traffic control devices

as required by the MUTCD, or as directed by the Engineer, to protect the work area from traffic,
pedestrians, and animals.

Contractor shall relocate barricades, signs and other devices as necessary as the work
progresses.

Unless extended protection is required for specific areas, when the work has been
completed, all temporary warning and regulatory devices used by the Contractor shall be
removed so that traffic can move unimpeded through the area.

All detour and traffic routing plans shall be submitted to the City of Nashua Traffic Department

for their review and approval, prior to implementation. The Engineer shall also receive a copy.

END OF SECTION

01550-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P284

Finance Committee - Agenda - 5/17/2017 - P285

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
285
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 01570

ENVIRONMENTAL PROTECTION

Description

Notification

Implementation

Areaof Construction Activity

Protection of Water Resources
Construction in Areas Designated as Wetlands on the Drawings
Protecting and Minimizing Exposed Areas
Location of Storage Areas

Protection of Landscape

10. Cleering and Grubbing

11. Dischargeof Dewatering Operations

12. Dust Control

13. Seperation and Replacement of Topsoil

14. Bded Straw

15. Silt Fence

1. Description

OAONDWABRWN >

A. The work covered by this section of the specifications consists of furnishing all labor,
materias, tools and equipment and performing al work required for the prevention of
environmental pollution during and as a result of construction operations under this
contract.

B. Therequirenents set forth in this section of the specifications apply to roadway
reconstruction areas, cross-country areas, river and stream crossings, and construction in and
adjacent to welands, unless otherwise specifically stated.

2. Notification

The Engineer will notify the Contractor in writing of any norm-compliance with the foregoing
provisions. The Contractor shall, after receipt of such notice immediately take corrective action.
Such notice when delivered to the Contractor or his authorized representative at the site of the
work, shal be deemed sufficient for the purpose. If the Contractor fals to act promptly, the
Engineer may order stoppage of all or part of the work until satisfactory corrective action has
been taken. No clam for an extension of time or for excess costs or damage incurred by the
Contractor as a result of time lost due to any stop work orders shall be made unless it was later
determined that the Contractor was in compliance.

01570-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P285

Finance Committee - Agenda - 5/17/2017 - P286

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
286
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

3. Implementation

A.

Prior to commencement of work, the Contractor shall meet with representatives of the
Engineer to devdoo mutud understandings rddive to compliance of the environmenta
protection program.

The Contractor shdl submit for aoprova six sets of deals and literature fully describing
environmenta protection methods to be enployed in carrying out construction activities within
100 feet of wetlands or across areas desi gnated as wetlands.

4. Areaof Construction Activity

Insofar as possible, the Contractor shall confine his construction activities to those areas defined
by the plans and specifications. All land resources within the project bounderies and outside the
limits of permanent work performed under this contract snall be preserved in their present condition or
be restored to acondition after completion of construction at least equal to that which existed prior to
work under this contract.

5. — Protection of Water Resources

A.

The Contractor shal not pollute streams, lakes or reservoirs with fuels, oils, bitumen, cdcium
chloride, acids or other harmful materids It is the Contractor's regoonsibility to comply with
all applicable Federal, State, County and Municipal laws regarding pollution of rivers
and streans.

B. Specia measures should be ta&ken to insure against spillage of any pollutants into public waters

Construction in Areas Designated as Wetlands on the Drawings

A.

Insofar as possible, the Contractor shal make every effort to minimize disturbance within
areas designated as wetlands. Total easement widths shall be limited to the widths snown.

The Contractor shall perform his work in such a way that these areas are left in the
condition existing prior to construction.

The elevations of areas designated as wetlands shal not be unduly disturbed by the
Contractor's operations outside of the trench limits. If such disturbance does occur, the
Contractor shdl ta<e all meesures necessary to retum these areas to the elevations which existed
prior to construction.

In areas designated as wetlands, the Contractor shall carefully remove and stockpile the top 24
inches of soil. This topsoil material shall be used as backfill for the trench excavation top
layer. The devation of the trench shal be restored to the preconstruction elevations wherever
disturbed by the Contractor's operation.

The Contractor snd use a trench box, sheeting or bracing to support the excavation in arees
designated as wetlands.

Excavated materids shall not be permanently placed or temporarily stored in aeas
01570-2

Page Image
Finance Committee - Agenda - 5/17/2017 - P286

Finance Committee - Agenda - 5/17/2017 - P287

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
287
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

7.

8.

9.

designated as wetlands. Temporary storage areas for excavated materia shall be as directed
by the Engineer.

The use of atenporary gravel roadway to construct the pipeline in the wetlands area is not
acceptable The Contractor will be required to utilize timber or rubber matting to support his
equipment in these areas. The timber or rubber matting shall be constructed in such away that
it is capable of supporting al equipment necessary to instal the pipdine The timber or
rubber matting shal be constructed of materids and placed in such a way that when
removed the material below the matting will not be unduly disturbed, mixed or compacted
so as to adversely affect recovery of the existing plant life

Bentonite dams shall be placed in wetlands to prevent dranage Locations for dans ave as
indiceted on the drawings or as directed by the Engineer.

During construction, easements within wetlands shall be lined with a continuous straw-
bad e/siltaion fence barrier.

Protecting and Minimizing Exposed Areas

A.

The Contractor shall limit the area of land which is exposed and free from vegetation during
construction. In areas where the period of exposure will be greeter than two (2) months,
temporary vegetation, mulching or other protective measures shall be provided as specified.

The Contractor shall take account of the conditions of the soil where temporary cover crop
will be used to insure that materials used for temporary vegetation are adaptive to the sediment
control. Materidsto be used for temporary vegetation shall be aoproved by the Engineer.

Location of Storage Areas

A.

The location of the Contractor's storage areas for equipment and/or materia’s shall be upon
cleered portions of the job siteor areas to be cleared as apart of this project, and shall require
written aoprova of the Engineer. Plans showing storage facilities for equipment and
meaterias shal be submitted for aooroval of the Engineer.

No excavated mderids or mderia’s used in ill Operations shall be deposited within a
minimum distance of one hundred (100) feet of any watercourse or any drainage facility.
Adequate measures for erosion and sediment control such as the placenent of baled straw
around the downstream perimeter of stockpiles shal be employed to protect any downstream
areas from siltation.

Theresnal beno storage of equipment or maeridsin areas designated as wetlands,

The Engineer may designate a particular area or areas where the Contractor may store materids
used in his operations.

Storage areas in cross-country locations shall be restored to pre-construction conditions with the
planting of native soecies of trees and shrubs.

Protection of Landscape

01570-3

Page Image
Finance Committee - Agenda - 5/17/2017 - P287

Finance Committee - Agenda - 5/17/2017 - P288

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
288
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

The Contractor shall not deface injure or destroy trees or sorubs nor remove or cut then without
written authority from the Owner. No ropes, cables, or guys shdl be fastened to or attached to any
existing nearby trees for anchorages unless specifically authorized by the Engineer. Excavating
machinery and cranes sndl be of suitable type and be operated with care to prevent injury to
trees which ave not to be removed, paticulaly ovethenging branches ard limbs. The
Contractor shall, in any event, beregoonsiblefor any damage resulting from such use.

Branches, limbs, and roots shal not be cut exceot by permission of the Engineer. All cutting
shal be smoothly and neatly done without splitting or crushing. When there is unavoidable injury
to branches, limbs and trunks of trees, the injured portions shall be neatly trimmed and covered
with &1 application of grafting wax or treehealing paint as directed

Where in the opinion of the Engineer, trees may possibly be defaned, bruised, injured, or otherwise
damaged by the Contractor's equipment or by his blasting or other operations, the Engineer may
direct the Contractor to adequately protect such trees by placing boerds, planks poles or
fencing around them. Any trees or landscape feature scarred or damaged by the Contractor's
equipment or operations shall be restored as nearly as possible to its original condition a the
expense of the Contractor. The Engineer will decide what method of restoration shall be used,
and whether danaged trees shall be treated and healed or removed and disposed.

Cultivated hedges, shrubs, and plants which could be injured by the Contractor's operations
snall be protected by suitable means or shall be dug up, baled and temporarily
reolanted and mantaned. After construction operations have been substantially completed,
they shal be replanted in their origina positions and cared for until growth is re-established. If
cultivated hedges sorubs and plats ee injured to such a degree as to affect thar growth or
diminish their beauty or usefulness, they shall be replaced by items of akind and quality at least
equa to that existing a the sat of thewak.

10. Cleeringand Gubbing

A. TheContractor shall deer and grub only on the Owner's land or the Owner's essaments, and only the

B.

C.

arearequired for construction operations, as aoproved by the Engineer.

Removal of mature trees (4 inches or greater DBH) will not be alowed on temporary
easements.

The Contractor shall not remove trees in the Owner's temporary easements without
permission of the Engineer.

11. Dischargeof Dewatering Operaiions

A.

Any water that is pumped and discharged from the trench and/or excavation as pat of the
Contractor's water handling shall be filtered by an aoproved method prior to its discharge
into arecaving water or drainage system.

Under no circumstances shall the Contractor discharge water to the areas designated as
wetlands. When constructing in a wetlands area the Contractor shal discharge water from
dewatering operations directly to the neerest drainage system, stream, or waterway after filtering
by an approved method.

01570-4

Page Image
Finance Committee - Agenda - 5/17/2017 - P288

Finance Committee - Agenda - 5/17/2017 - P289

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
289
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

C.

The pumped water shall be filtered through bded straw, a vegelative filte drip or a
vegetated channd to trao sediment occurring as a result of the construction operations. The
vegetated channel shal be constructed such that the discharge flow rate shall not exceed a
velocity of more than 1 foot per second. Accumulated sediment shall be cleered from the
channel periodically.

12. Dust Control

A.

During the progress of the work, the Contractor shal conduct his operations and
maintain the avea of his activities, including sweeoing and sprinkling of streets as
necessary, to minimize creation and dispersion of dust. If the Engineer decides it is
necessary to use cdcium chloride for more effective dust control, the Contractor shall furnish
and spread the materia, as directed. Cacium chloride sndl be as specified under Section 01562,
DUST CONTROL.

Calcium Chloride shall not be used for dust control within a drainage basin or in the vicinity
of any source of potablewater.

13. Separation and Replacement of Topsoil

Topsoil shal be carefully renoved from cross-country areas where excavations are to be made
and separa stored to be used again as directed. The topsoil snd be stored in an area anceptable to
the Engineer and adequate measures shall be enployed to prevent erosion of sad materia.

14. Baed Strav

To trap sediment and to prevent sediment from clogging dranage sysiens, baled straw shall be used
where shown on the drawings. Care shall be taken to keep the bales from breeking apart. The
bales should be securely staked to prevent overturning, flotation, or digolacement. All deposited
sediment shal be renoved periodically. Straw bales shall not be placed within a waterway during
construction of the pipeline crossing.

15. Silt Fence

A.

Where indicated on the drawings or where directed by the Engineer, the Contractor shall erect
and maintain a tenporary silt fence. In areas designated as wetlands, the Contractor
shal line the limits of the construction easement with asilt fence. The silt fence shall be used
specificaly to contain sediment from runoff water and to minimize environmenta danage
Caused by construction.

B. Thesilt fence shal consist of a3-foot wide continuous length sediment control fabric, stitched

to a 22-foot wide, continuous length support netting, and stapled to preweethered oak
posts instaled as shown on the drawings. The oak posts shal be 1 %inches by 1 ’4inches
(Minimum Dimension) by 48 inches and shal be tapered. The support netting shall be
industria strength polypropylene. The bottom edge of the sediment control fabric shal be
buried as shown on the drawings. The sediment control faoric shal conform to the following
properties:

Property Value Test Method
1. Grab Strength (Ibs) 124 ASTM D-4632

01570-5

Page Image
Finance Committee - Agenda - 5/17/2017 - P289

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2434
  • Page 2435
  • Page 2436
  • Page 2437
  • Current page 2438
  • Page 2439
  • Page 2440
  • Page 2441
  • Page 2442
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact