Finance Committee - Agenda - 11/6/2019 - P125
MAIN OFFICE BRANCH OFFICE
397 Whittier Highway $308 American Legion Hwy
Electrical Moultonboro, NH 03254 Westport, MA 02790
7 . 603-253-4525 508-636-8600
Installations, Ine. FAX 603-253-6284 FAX 508-636-8650
Engineering - Construction Control Systems
ziltateabors, NH ed VT License EM-2667 ME License 7905 NHLicense46C MALicense 221MR
Change Order Request
18101 — Nashua, NH - WWTF Primary Subject: RFP-002 Credit Request for Reducing Plant Water
Tank Upgrade (DB Rates) Pump Panel Feeder (200 Amp to 100 Amp Reduction)
To Anthony Crespo Number: 18101-CO-001
Methuen Construction Revision Number: 0
Date: 8/29/2019
Price / Do Not
Proceed
RFI Reference No: 002
Days Valid: 5
Return To Chuck Fritz Work Type:
Electrical Installations, Inc.
245 Charlotte Street
Manchester, NH 03103
603-520-0513
935-7862 (FAX)
chuck. fritz@eii-hq.com
Details
4—Submittals/O&M's . 1.00
001 /Clerical/Office Clerical Labor $55.00 Hrs 1.00 $55.00
Electrical Field 0.00
002 «| P~Electrical Field | etectrician Labor $95.00 0.00] $0.00
Labor Onsite Hrs
2—Instrumentation | Engineer 0.00
Li 110.0 0.0 0.
003 Field Labor Onsite | Programmer abor 5110.00 Hrs ° 90.00
0.00
004 5—Panel Shop Panel Shop Labor $65.00 brs 0.00 $0.00
ecpe Coes ___ |2" PVC Ridged 98.00
005 EP*-Entire Project conduit credit Material ($2.10) FOOT ($205.80)
. . . . : 300.00
006 *EP*-Entire Project |4/0 Wire Credit Material ($3.10) FOOT -| ($930.00)
wens Cees . Conduit Fitting . 1.00
007 EP*-Entire Project Credit Material ($65.00) LUMP SUM ($65.00)