Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 19771 - 19780 of 38765

Finance Committee - Agenda - 8/14/2019 - P108

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
108
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

fs NORMANDEAU City of Nashua

BAFE ASSOCIATES Hane 18, 2019

ENVIRONMENTAL CONSULTANTS

© Collect an adequate number of appropriately sized juvenile herring from a location within the
Merrimack River watershed — we have assumed this can be completed in a period of four
evenings.

o PIT-tag a total of 200 juvenile herring and release directly into the power canal at Mine Falls to
evaluate downstream passage.

o Assumes installation and maintenance of a single PIT receiver during the period September-
November.

e Approach 3 - Defer

© Rely on results from the Desktop Impingement/Entrainment Survivability Assessment to

provide insight into the potential for poor turbine passage survival at the Project.

Schedule and Estimated Cost: The juvenile herring passage evaluation should occur during the fall period
(i.e., September-November) when the Project is operating under normal conditions (i.e., no unit outages, etc.).
We propose this study be conducted during the fall of 2020. Three study approaches were described above
which vary based on the monitoring approach utilized. These three approaches vary in responsiveness to the
study objectives provided by the resource agencies. The estimated costs for each level of effort as described
here is $64,571.50 (telemetry study as requested by NHFGD), $30,359.00 (reduced), and SO (propose to not
adopt field study approach until after review of desktop assessment).

Study: Adult Alosine Downstream Passage Assessment and Protection Evaluation
Requestor: NHFGD
Requestor Goal & Objectives:
e Assess the risk of adult herring and shad becoming injured, impinged or entrained in powerhouse
units.
e Estimate turbine survival.
e Estimate effectiveness of downstream fish passage.
e Assess risk of injury or mortality at the spillway and downstream bypass.
e Evaluate potential passage and protection measures.

Agency Recommended Approach:
e Evaluate turbine passage mortality for adult herring and shad using the turbines, downstream bypass
and spillway with the HI-Z balloon tag methodology.
e Conduct a downstream passage alternatives analysis of operational or structural modifications to
potentially minimize injuries/mortality relative to existing conditions.

Suggested Approach:
e Push back on conducting a HI-Z balloon tag study. Downstream passage survival for adult alosines will
be considered as part of the Desktop Impingement/Entrainment Survivability Assessment.
e Push back on conducting a downstream alternatives analysis pending review of proposed adult herring
telemetry study above.

Study: Three Dimensional CFD Modeling in Vicinity of Fishway Entrance
Requestor: NHFGD
Requestor Goal & Objectives:

Page Image
Finance Committee - Agenda - 8/14/2019 - P108

Finance Committee - Agenda - 8/14/2019 - P109

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

af» NORMANDEAU City of Nashua
AFA ASSOCIATES June 18, 2019
ENVIRONMENTAL CONSULTANTS Page 8

e Determine the flow field conditions which exist in and around the fishway entrances and create a
series of color contour maps of velocity magnitude at a range of discharges for comparison with known

fish swim capabilities.

Agency Recommended Approach:
e Collect necessary data (bed topography, water velocities, water depth) under a range of discharges

and assemble a 3-D computational fluid dynamics model.

Suggested Approach:
© Push back on conducting 3D CFD modeling of the Project fisnways unless one of the proposed passage

studies indicate a lack of safe, timely and effective passage.

Study: Downstream American Eel Passage Assessment
Requestor: NHFGD
Requestor Goal & Objectives:
¢ Quantify the movement rate and relative proportion of eels passing via the various routes at the

project.
e Evaluate instantaneous and latent mortality and injury of eels passed via each potential route.

Agency Recommended Approach:
e Evaluate the timing and route of downstream passage for adult eels at Mine Falls using radio-

telemetry.
e Evaluate turbine passage mortality for adult eels using the turbines, downstream bypass and spillway
with the HI-Z balloon tag methodology.

Suggested Approach:
® Push back on conducting a HI-Z balloon tag study. Downstream passage survival for adult eels will be

considered as part of the Desktop Impingement/Entrainment Survivability Assessment.

e Push back on additional telemetry evaluation of eels at Mine Falls until results from the Alden-DOE
bypass effectiveness study results are available. It is my understanding that eels used in that
experiment will be radio-tagged and should provide some insight into egress from the power canal.

Study: Desktop Impingement/Entrainment Survivability Assessment
Requestor: City of Nashua
Requestor Goal & Objectives:
e Provide a description of physical characteristics of the Mine Falls Project (including forebay

characteristics, intake location and dimensions, approach velocities, and rack spacing).
e Analyze target species for factors that may influence vulnerability to entrainment and mortality.
e Assess the potential for impingement and entrainment for target species.
e Estimate turbine passage survival rates.
e Estimate total project survival considering all passage routes for target species at the Project.

Suggested Approach:

Page Image
Finance Committee - Agenda - 8/14/2019 - P109

Finance Committee - Agenda - 8/3/2022 - P89

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Thu, 07/28/2022 - 10:40
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2022 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

Summary of Comparison Costs should be:

Single Agreement Separate Agreements
City Pennichuck
Base EA $64,872 $55,000 $27,500
Add-Ons $17,000 $11,000 $6,000
Total $81,872 $66,000 $33,500
Dawn, Jay,

The costs for the additional licensing you requested are as follows:
* Cost per Additional Utility Network User = $100/license (cost is 50% discount due to EA)
e Cost per Additional Creator User = $250/license (cost is 50% discount due to EA)

Please let me know if you need any additional information or if there is anything else | can do to support your decision
process.

-Car|

Carl Nylen | cnylen@esri.com

Esri | 35 Village Rd, STE 501 | Middleton, MA 01949 | USA
O 978 777 4543 x8449 | M978 764 2034

www.esri.com | Boston Office Hub

THE SCIENCE OF WHERE™
ESRI USER CONFERENCE \ffy-<.-

July 11-15, 2022 | San Diego, California

From: Carl Nylen <cnylen@esri.com>

Date: Thursday, May 12, 2022 at 6:03 PM

To: "VeinoD @nashuanh.gov" <VeinoD@nashuanh.gov>, "Kleiner, Kimberly" <kleinerk@nashuanh.gov>,
"Andruskevich, Pamela" <PamelaA@nashuanh.gov>, "Miseirvitch, Nick" <MiseirvitchN@nashuanh.gov>,
"iay.guarneri@pennichuck.com" <jay.guarneri@pennichuck.com>, "dawn.lavacchia@pennichuck.com"
<dawn.lavacchia@pennichuck.com>

Subject: Re: Esri Enterprise Agreement Renewal

Kim, Nick, Pam, Jay and Dawn,

Thank you again for the time yesterday. Attached are the slides | showed with details on the Enterprise Agreement.
| should have the information on the cost of continuing a single agreement (City + Pennichuck) shortly.

-Carl

Carl Nylen | cnylen@esri.com | esri.com
O 978 777 4543 x8449 | M978 764 2034

Page Image
Finance Committee - Agenda - 8/3/2022 - P89

Finance Committee - Agenda - 8/14/2019 - P110

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
110
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

’—» NORMANDEAU City of Nashua
FAFE ASSOCIATES June 18, 2019

a ——————— oes 9
ENVIRFONMENTAL CONSULTANTS Page 9

e The assessment of impingement, entrainment, and survival of diadromous species will be conducted
as a desktop analysis.

e The potential for impingement or entrainment will be characterized based on the relationship of site-
specific intake characteristics along with swim speed and life history characteristics of target fish
species.

e Site-specific factors likely to influence the potential for entrainment include intake location relative to
shore and littoral habitat; depth of Project intakes; degree of water level fluctuations; hydraulic
Capacity; water quality; and intake velocities.

e Entrainment survival of juvenile and adult alosines will be estimated using data from survival studies
conducted at other hydroelectric facilities with similar characteristics [e.g., (EPRI, 1997); (Winchell,
2000)], and the Franke blade strike probability equation (Franke, 1997).

e Survival of adult eels will be estimated using the multiple linear regression models (Alden, Assessment
of Fish Entrainment, Impingement, and Turbine Survival at Holyoke Nos. 1, 2, and 3, 2017).

e Total project downstream passage survival will be characterized for adult and juvenile American shad
and alewife, and adult American eels considering the turbine passage survival estimated in this study
and any available proportional route selection data collected in the studies mentioned above.

Schedule and Estimated Cost: The desktop impingement/entrainment assessment should be conducted soon
after resource agency review of the PSP and issuance of the RSP. The estimated cost for the effort as described
here is $16,184.00.

3) Study Reports and Draft Application: Each aquatic resource study eventually agreed upon by the City
and the natural resource agencies will be conducted following the methodology summarized in the
RSP. At the completion of each study, Normandeau will prepare a summary report which provides an
overview of the goals and objectives, methodology and key results for each study. These draft reports
will be distributed to the natural resource agencies for review and Normandeau will coordinate a one-
day stakeholder meeting to review each study and address agency questions. Following review and
consideration of comments received on the draft reports, Normandeau will incorporate pertinent
comments and responses and provide a finalized set of study reports.

With regards to preparation of the Draft License Application (DLA), we have assumed that the City will
take an active role in that effort as participation will help to reduce the overall cost of the relicensing
effort. In particular, the City will take the lead on preparation of Exhibits B, C, D, G and H since staff
there have access to the detailed information required in those Exhibits. We will review and advise
the City on the content of those Exhibits to ensure that they are complete and will meet FERC
requirements and expectations. As part of the DLA effort, the Normandeau team will prepare the
Initial Statement, and Exhibits A, E, and F in accordance with FERC regulations and as stipulated in
FERC’s guidance document, Managing Hydropower Project Exhibits (FERC 2014).

A preliminary schedule of the timing of proposed studies and activities associated with the Mine Falls
relicensing process is included below in Figure 1 and was established based on an assumed contract issuance

Page Image
Finance Committee - Agenda - 8/14/2019 - P110

Finance Committee - Agenda - 8/14/2019 - P111

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
111
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

ff’ NORMANDEAU City of Nashua

FES ASSOCIATES se onee 10

ENVIRONMENTAL CONSULTANTS

date of August 1, 2019 and a set date for filing the Final License Application with FERC no later than two years
before the existing license expires (i.e., August 4, 2021).

Table 2 provides a summary of the total cost for the work scope as defined herein. Where multiple cost
options have been prepared for a particular field study, a line for each study option has been included in the
summary table. The tasks presented in Table 2 represent our best total cost estimate following consideration
of the existing resource agency study requests. If the scope or suite of resource studies is modified during the
course of study plan development then additional sampling not considered here will be billed on a time and
materials basis following the rates presented below in Tables 3 (Normandeau) and 4 (H.L. Turner).

It is assumed that reasonable terms and conditions can be agreed upon. For ease in expediting the award, we
have attached our standard terms and conditions for your consideration.

If you have any questions or would like to discuss the content of this letter proposal, please do not hesitate to
call Drew Trested directly at (603) 973-3179 or via an email dtrested@normandeau.com.

Sincerely,

3. .
pf Sree,

fan i
Drew Trested Richard Simmons
Fisheries Biologist Vice President

Normandeau Associates, Inc. Normandeau Associates, Inc.

Page Image
Finance Committee - Agenda - 8/14/2019 - P111

Finance Committee - Agenda - 8/14/2019 - P112

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
112
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

gf» NORMANDEAU
BRA ASSOCIATES

Table 2. Estimated process cost by task for the Mine Falls relicensing.

Task

Estimated
Hours

Estimated Cost

Proposed and Revised Study Plan

1. Kickoff Meeting 32 | §$ 4,776.00
2. Develop Preliminary Study Plan 170 | $ 26,006.00
3. Preliminary Study Plan Meeting 32 | $ 4,776.00
4. Prepare Revised Study Plan 12 | $ 1,894.00
Implementation of Study Plan’
1. Instream Habitat 308 | $ 35,647.00
2. RTE Mussel Survey 200 | $ 27,108.75
3. Water Quality Study 234] $ 35,271.40
4, Telemetry Study Upstream/Downstream
Migrating Shad and Herring
Full Study 330 | $ 79,056.50
Reduced Study 314] $ 64,665.00
Minimum Study 282 | $ 44,632.00
5. Juvenile Alosine Telemetry
Radio Telemetry Study 414 | $ 64,571.50
PIT Tag Study 316 | $ 30,359.00
Defer 0| $ -
6. Desktop Entrainment Assessment 168 | $ 16,184.00
Draft Application
1. Prepare DLA * 242 | $ 55,118.00
2. Process Management 70 | $ 10,820.00
* Price includes Subcontractor costs
Total Estimated Cost
Minimum | $ 262,233.15
Maximum | $ 361,229.15

City of Nashua
June 18, 2019
Page 11

Page Image
Finance Committee - Agenda - 8/14/2019 - P112

Finance Committee - Agenda - 8/14/2019 - P113

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
113
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

’™» NORMANDEAU City of Nashua
BAARF ASSOCIATES June 18, 2019
Se age

ENVIRONMENTAL CONSULTANTS

Table 3. 2019-2021 Normandeau rate table for the City of Nashua Mine Falls Relicensing.

LABOR CATEGORY HOURLY RATE
Senior Associate Il 326.00
Senior Associate | 214.00
Senior Principal Scientist 173.00
Principal Scientist 143.00
Senior Scientist 112.00
Scientist IV 87.00
Scientist II] 73.00
Scientist Il 59.00
Scientist | 48.00
Scientist Aide 36.00
Technology Specialist 143.00
GIS Specialist 102.00
Data Specialist 92.00
Senior Technician II 145.00
Senior Technician 107.00
Technician V 94.00
Technician IV 82.00
Technician III 64.00
Technician Il 51.00
Technician | 38.00
Administrative V 92.00
Administrative IV 80.00
Administrative Ill 66.00
Administrative II 56.00

Page Image
Finance Committee - Agenda - 8/14/2019 - P113

Finance Committee - Agenda - 8/14/2019 - P114

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
114
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

Lo. NORMANDEAU City of Nashua

BRA x ASSOCIATES June eee

ENVIRONMENTAL CONSULTANTS

Table 4. 2019-2021 H.L. Turner Group rate table for the City of Nashua Mine Falls Relicensing.

TURNER
ct |

STANDARD FEE SCHEDULE AND PAYMENT TERMS

FEE SCHEDULE
Hourly Bidling Rate”

Persore| Catepary 3 per Hour
Pri MCI Ba soe etter nes 13%
Associate .. bet eccnvaveg ewes cecsnnne vee LED
Seniar Project Manager lit isesintoa de rien nuisvdn con anacgausyeer sraaupttse LAUD
SQniar Preject PIaN@ge4r Meee een eee co tan ect tetcrote teaser bel
SOMiOr PROIECE PAAM REE bo ect rae eevee teccenassesaeenessseenccesouats cuscgasersvoestesenuseseseenesneseetegaee: 100
Praject Manager... co gna enes caueeveneg gpa iqumetacusvtesyaeepotapeamenaesquuepetewen cone scureoee

Associate Project Manager. i bese ciuee ents sions
Senior Project Enpineer/Sechikeck ! L 7

Senior Project Engineer/Architect 4...
Senior Project om LL.
Project Engineer {Architect
EngineessArchitect .., jens neuen eens cons
Associate Engineer/Architect ... a
Senior Preqect Desigermer Woe. eee cece racine nea tame
Senior Project Designer # ..
senior Project Designer cu
F Project Designer... cecteareys
Associate ‘Designer piverevarTarReTe
Technical Word Processing lil, vogeeteee
Technical Ward Processing Ii
Technical Wore Processing |.
Technical Aide occ se

These rates are firm through December 3%, 2019. Expert Testimony Rates are 1.5 » Hourly Billing Rates.
REIMBURSABLE EXPENSES AND OUTSIDE SERVICES
Transportation and Subsistence - Traraportation and subsistence @xperses will be belive at cost plus a 15% service charge

Outside Services ~ Outside sewices wil be billed at cass plus a 28% service charge. Examples of outside services osdinarily
charged to projects are subcontractors; laboratory charges; outside printing und cepradection: shinping charges; rental
wehicies, fares of peblic carriers: spacial fees for insurance certificates, perraits, licenses, etc: and state sales and use taxes.
Field and speclaity equigment il! be bliied at a dally, weekly or monthly rate, as needed for the project.

Other Expenses Examples of other expenses are telecornmunications charges, blucprints/plots, in houce copying aril
printing, software lcensing fees, and date network fees.

Page Image
Finance Committee - Agenda - 8/14/2019 - P114

Finance Committee - Agenda - 8/14/2019 - P115

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
115
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

NORMANDEAU

OCIATES

and Revised
. Kickoff Meeti
. Develop Preliminary S Plan
. Prelim S Plan Meeti
re Revised S Plan

of Plan’
1. Instream Habitat
2. RTE Mussel
3. Water S
4. Telemetry Study Upstream/Downstream Migrating Shad
and Herri
Full
Reduced S
Minimum
5. Juvenile Alosine T
Radio T
PIT Tag S

Defer
6. Entrainment Assessment
7. Submit S

Draft
re DLA

2. to file DLA
3. Receive comments to DLA
4. nt to File FLA
* Based upon an assumed contract date of August 1, 2019

Figure 1. Proposed schedule for completion of the Mine Falls traditional relicensing process.

2019
A|S|O|N/D

J

F

MIA|M

J

2020

J

A;|S|O;}N]D

J

F

2021

M{|A|M

J

J

A

Corporate Office: Normandeau Associates, Inc. *25 Nashua Road * Bedford, NH 03110 ° (603) 472-5194
www.normandeau.com

Page Image
Finance Committee - Agenda - 8/14/2019 - P115

Finance Committee - Agenda - 8/14/2019 - P116

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
116
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

CONTRACT FOR PROFESSIONAL SERVICES

CONSULTING SERVICES FOR MINE FALLS HYDROELECTRIC FACILITY LICENSING
AND COMPLIANCE SERVICES

A CONTRACT BETWEEN

THE CITY OF NASHUA, 229 MAIN STREET, NASHUA, NH 03061-2019
AND

NORMANDEAU ASSOCIATES, INC. 25 NASHUA ROAD, BEDFORD, NH 03110

and its successors, transferees and assignees (together “Consultant”)

WHEREAS, the City of Nashua, a political subdivision of the State of New Hampshire, from time to
time requires the services of independent Consultants; and

WHEREAS, it is deemed that the services of a Consultant herein specified are both necessary and
desirable and in the best interests of the City of Nashua; and

WHEREAS, Consultant represents they are duly qualified, equipped, staffed, ready, willing and able
to perform and render the services hereinafter described;

Now, THEREFORE, in consideration of the agreements herein made, the parties mutually agree as
follows:

1. DOCUMENTS INCORPORATED. The following exhibits are by this reference incorporated herein and are
made part of this contract:

Exhibit A--General Conditions for Contracts
Exhibit B--Scope of Services, Contract Time, Fee Schedule

The Contract represents the entire and integrated agreement between the parties and supersedes prior
negotiations, proposals, representations or agreements, either written or oral. Any other documents which
are not listed in this Article are not part of the Contract.

In the event of a conflict between the terms of the Proposal and the terms of this Agreement, a written
change order and/or fully executed City of Nashua Purchase Order, the terms of this Agreement, the
written change order or the fully executed City of Nashua Purchase Order shall control over the terms of
the Proposal.

2. WORK TO BE PERFORMED Except as otherwise provided in this contract, Consultant shall furnish all
services, equipment, and materials and shall perform all operations necessary and required to carry out and
perform in accordance with the terms and conditions of the contract the work described in Exhibit B.

AG 1 of 3

Page Image
Finance Committee - Agenda - 8/14/2019 - P116

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1974
  • Page 1975
  • Page 1976
  • Page 1977
  • Current page 1978
  • Page 1979
  • Page 1980
  • Page 1981
  • Page 1982
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact