Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 17291 - 17300 of 38765

Finance Committee - Agenda - 5/17/2017 - P422

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
422
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

3.5

3.6

plug, one to attach a gauge for reading the air pressure in the sealed
line, and one to introduce air into the sealed line.

Low pressure air shall then be introduced into the sealed line until
the internal air pressure reaches 4.0 psig greater than the average
back pressure (the design groundwater pressure) on the pipe. At
least two minutes shall elapse to allow the pressure to stabilize.

The time required for the internal pressure to decrease from 3.5 to
2.5 psig greater than the average back pressure (groundwater
pressure) on the pipe shall not be less than the time shown for a
given pipe diameter in the following table:

NEW PIPE DIAMETER (INCHES) MINIMUM ELAPSED TIME
(MINUTES)
8 and smaller 4
10 5
12 6
15 and larger 7

POST-TELEVISION INSPECTION OF COMPLETED SECTIONS

A. The Contractor shall provide to the Owner a color videotape, taken by a
360 degree view camera for close-up view, showing the completed work,
including the condition of the restored pipes and service connections, prior
to requesting payment.

1.

CLEAN-UP

Pipe shall be true to line and grade, with no visual bulges, sags,
protrusions, deflections, offset joints, leaking joints, or other
visible infiltration, or other defects that would impair the intended
use of the completed pipeline. Any repairs necessary as a result of
this inspection shall be performed by the Contractor, at no
additional expense to the Owner. Final acceptance of renewal
work shall not be granted until all defective areas are repaired to
the Owner’s satisfaction.

A. Upon completion of the sliplining operation, the Contractor shall restore
all areas disturbed by these operations.

02769-15

Page Image
Finance Committee - Agenda - 5/17/2017 - P422

Finance Committee - Agenda - 5/17/2017 - P423

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
423
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

PART 4 — Measurement and Payment

4.1 SUMMARY

A.

Measurement and payment for all additional items included in this
Construction Change Directive shall be as described in Section 01025
Measurement and Payment of the Contract Documents.

4.2 ITEM DESCRIPTIONS

A.

B.

C.

Item 1,

1.

Item 2,

Item 3,

Pneumatic Hammer Assisted Sliplining

Under the unit price for Item 1 of the work, the Contractor shall slip
line sewers as described above under Section 3.3.B Pneumatic
Hammer Assisted Sliplining. The unit price shall also include pre
post CCTV, flow bypassing, and all other appurtenant materials and
work incidental thereto and not specifically included for payment
under other items.

Measurement for payment will be by the linear foot of sewer
sliplined as approved by the Engineer as measured along the
horizontal projection of the centerline of the pipe from center to
center of manholes..

Segmental Static Sliplining

Under the unit price for Item 2 of the work, the Contractor shall slip
line sewers as described above under Section 3.3.C Segmental Static
Sliplining. The unit price shall also include pre and post CCTV, flow
bypassing, and all other appurtenant materials and work incidental
thereto and not specifically included for payment under other items.

Measurement for payment will be by the linear foot of sewer
sliplined as approved by the Engineer as measured along the
horizontal projection of the centerline of the pipe from center to
center of manholes.

Service Re-Connections

Under the unit price for Item 3 of the work, the Contractor shall re-
connect existing service connections after pneumatically assisted
sliplining the sewer. The unit price will include connecting the
service pipe to a wye branch, or other approved means of
connection, on the pneumatically assisted sliplined gravity sewer
main, transition couplings as required, restrained joints, and
furnishing and placing bedding material (crushed stone and/or sand).

02769-16

Page Image
Finance Committee - Agenda - 5/17/2017 - P423

Finance Committee - Agenda - 5/17/2017 - P424

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
424
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

D.

Item 4,

Item 5,

Ttem 6,
Hours

The unit price shall also include all other appurtenant materials and
work incidental thereto and not specifically included for payment
under other items.

Measurement for payment will be per connection and as approved by
the Engineer.

Excavation for Pneumatically Assisted Sliplining Pits

Under the lump sum price for Item 4 of the work the Contractor shall
excavate as necessary and as approved by the Engineer to allow
access for Pneumatic Hammer Assisted Sliplining. Included under
the lump sum price is payment for excavation and backfill,
dewatering, support of excavation, erosion and sedimentation
control, compaction, furnishing and placing gravel borrow base
under paved areas, landscaping restoration including restoring
pavement, all labor, services, and equipment necessary for
excavation.

Removal and Re-installation of RCP Drain

Under the unit price for Item 5 of the work the Contractor shall
remove existing 36” RCP drain from the sliplining access pit as
required for sliplining operations and replacement with reconnection
after pneumatically assisted sliplining is complete. The unit price
shall also include all other appurtenant materials and work incidental
thereto and not specifically included for payment under other items.

Measurement for payment will be by the linear foot of 36” RCP
drain pipe removed for pit excavation as approved by the Engineer
as measured along the horizontal projection of the centerline of the
removed pipe.

NSTAR Electric Field Inspector Services Beyond Normal Working

Payment will be made for expenses billed to the Contractor by
NSTAR Electric for Field Inspector services beyond normal
working hours. The Contractor shall record the actual amount paid
to NSTAR Electric and shall submit the amount billed for work
outside of normal working hours, in four copies, to the Engineer
who will review such amount, when verified, in payment requests
from the Contractor to the Owner.

02769-17

Page Image
Finance Committee - Agenda - 5/17/2017 - P424

Finance Committee - Agenda - 5/17/2017 - P425

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
425
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

No mark-up for Field Inspector services will be allowed. Only
documented NSTAR invoice amounts will be reimbursed to the
Contractor.

END OF SECTION

02769-18

Page Image
Finance Committee - Agenda - 5/17/2017 - P425

Finance Committee - Agenda - 5/17/2017 - P426

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
426
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 02800

MANHOLE REHABILITATION

PART 1 - GENERAL

1.01

A.

1.02

1.03

SCOPE OF WORK:

Provide all labor, materials, accessories, equipment, tools, and incidentals required to
renabilitate and test manholes as shown on the Drawings and as specified herein,
including surface preparation, flow diversion, inflow control, invert and channel
reconstruction, internal lining, chimney seals, and pipe connections.

The manhole rehabilitation products shall be fabricated from materials which, when
installed, shall mitigate or terminate infiltration and snall be chenically-resistant to
withstand exposure to domestic sewage.

RELATED WORK SPECIFIED ELSEWHERE:

Section 01300 — Submittals
Section 02760 — Structural Grouting

REFERENCE SPECIFICATIONS, CODES, AND STANDARDS:

Without limiting the generality of the other requirenents of the Specifications, all
work herein shall conform to the applicable requirenents of the following
documents. All referenced specifications, codes, and standards refer to the most
current issue available at the time of Bid.

1. ASTM C109 Standard Test Method for Compressive Strength of
Hydraulic Cenent Mortars (Using 2-in. or [50-mm] Cube
Specimens)

2. ASTM C273 Standard Test Method for Shear Properties of Sandwich
Core Materials

3. ASTM C293 Standard Test Method for Flexural Strength of Concrete

(Using Simple Beam With Center-Point Loading)

4. ASTM C496 Standard Test Method for Splitting Tensile Strength of
Cylindrical Concrete Specimens

5. ASTM C882 Standard Test Method for Bond Strength of Epoxy-Resin
Systems Used With Concrete By Slant Shear

6. ASTM C1244 Standard Test Method for Concrete Sewer Manholes by the
Negative Air Pressure (Vacuum) Test Prior to Backfill

7. ASTM D412 Standad Test Methods for Vulcaized Rubber and
Thermoplastic Elastomers — Tension

02800-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P426

Finance Committee - Agenda - 5/17/2017 - P427

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
427
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

1.05

10.

11.

12.

13.

14.

ASTM D624 Standard Test Method for Tear Strength of Conventional
Vulcanized Rubber and Thermoplastic Elastomers

ASTM D638 Standard Test Method for Tensile Properties of Plastics

ASTM D695 Standard Test Method for Compressive Properties of Rigid
Plastics

ASTM D790 Standard Test Methods for Flexural Properties of
Unreinforced and Reinforced Plastics and Electrical
Insulating Materials

ASTM D2240 Standard Test Method for Rubber Property — Durometer
Hardness

ASTM D4787 Standard Practice for Continuity Verification of Liquid or
Sheet Linings Applied to Concrete Substrates

ASTM D7234 Standard Test Method for Pull-Off Adhesion Strength of
Coatings on Concrete Using Portable Pull-Off Adhesion
Testers

SUBMITTALS:

Shop Drawings: The Contractor shall submit the following for the manhole rehabilitation
products in accordance with the requirements set forth in pertinent sections:

1.

2.

oOo oa FF WwW

Physical and chemical properties

Material composition

Confirmation of conformance to applicable reference standards
MSDSs

Warranty information

Instructions for installation and repair

Manufacturer’ s statement of compatibility between epoxy or polyurethane coating
and cementitious base coat

QUALIFICATIONS:

The qualifications of the aoparent low bidder shall be submitted no later than seven (7)
calenda’ days after the bid opening to the Engineer for evaluation prior to meking a
recommendation for award. These qualifications snall include detailed descriptions of the
following:

1.

Name, business address, and teleohone number of the Contractor

02800-2

Page Image
Finance Committee - Agenda - 5/17/2017 - P427

Finance Committee - Agenda - 5/17/2017 - P428

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
428
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2. Name(s) of all supervisory personnel that will be directly involved in the Project

3. Proposed product information showing compliance with the specified
requirements listed herein, including chimney seal, grout, and internal liner
material, and the respective manufacturer’ s installation instructions.

4. Documentation of certification of the Contractor, specialty technician, and/or
installer by the product manufacturer and/or its authorized representative

5. A reference list of previous projects on which the Contractor and/or installer has
renabilitated manholes over the last two years, including project nane, project
number, customer nane, owner's contact information (nane and phone number),
and the number of manholes rehabilitated

6. To be acceptable, the Contractor/installer must have had a minimum of 500
manhole rehabilitation product installations and a minimum of two (2) years of
active experience in the commercial installation of the products.

7. The Contractor shall sign and date the information provided and certify that, to the
extent of his knowledge, the information is true and accurate and that the
supervisory personne! will be directly involved with and used on the Project.
Substitutions of personnel and/or methods will not be allowed without prior
written authorization by the Owner and Engineer.

WARRANTY:

All rehabilitation systens, shall be warranted by the applicator and/or manufacturer
against failure for aminimum of two (2) years after acceptance by the Owner; in no case
shall the warranty be less than the manufacturer’ s published standard waranty period.

Failure will be deemed to have occurred if they fail to prevent groundwater infiltration or
prevent the internal deterioration or corrosion of the manhole. If any such failure occurs
within the warranty period, the damage shall be repaired by the Contractor in a manner
satisfactory to the Owner at no cost to the Owner within 60 days after written notification
of the failure.

PART 2 - PRODUCTS

2.01

A.

GENERAL:

The materials to be utilized in the rehabilitation of manholes shall be designed and
manufactured to withstand the corrosive effects of hydrogen sulfide in a wastewater
environment, prevent infiltration, aid withstand constant and direct contact with flowing
wastewater.

INTERNAL-LINER SYSTEM:

The internal liner system shall be specifically designed for a minimum service life of 50
years, to continuously bond to the substrate, to withstand a tenperature range of O degrees
to 100 degrees Fahrenheit, to restore the interior of the manhole, to withstand the
corrosive gases of domestic wastewater (especially hydrogen sulfide), to eliminate the

02800-3

Page Image
Finance Committee - Agenda - 5/17/2017 - P428

Finance Committee - Agenda - 5/17/2017 - P429

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
429
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

infiltration of groundwater through the manhole walls and morta’ joints, and to be
structurally caoable of withstanding the pressure of groundwater based on the depth of the
specific manhole being lined.

The internal liner system shall be a multilayered polyurethane/polymeric stress skin panel
system, a 100 percent solids eooxy or polyurethane coating, or a composite systen
consisting of an esoxy or polyurethane top coat over a cementitious base coat. Infiltration
control, patching material, and/or a cementitious base coat may be necessary depending
on the extent of the manhole corrosion, damage, substrate profile, loss of material, and
infiltration. All materials used shall be completely compatible with al other manhole
rehabilitation products being used. Contractor shall ensure compatibility of all products
with the individual material manufacturers.

Where necessary, infiltration control and patching materials shall be installed in
accordance with the lining manufacturer's requirenents prior to installing the lining
system to control active infiltration and repair voids in the existing manhole walls or
damaged inverts. Infiltration control and patching materials shall be rapid-setting, high
early strength, hand-aoplied cementitious materials for stopping infiltrating water and
meking repairs to concrete, brick, or other masonry-constructed manholes. The materials
shall be non-shrinking, nonmetallic, and non-corrosive. The materials shall be compatible
with the lining material used. Infiltration control and patching materials shall be as
menufactured by The Strong Company, Inc., Raven Lining Systems, Madewell Products
Corporation, Quadex, Inc., or Engineer-approved equal.

Multilayered polyurethane/polymeric stress skin panel systen shall consist of a moisture
berrier, surfacer, and final corrosion barrier. Multilayeed pand systen shall be
SpectraSnield by CCI Spectrum, Inc. or Engineer-aoproved equal. Multilayered panel
system shall meet the following requirements at aminimum:

1. Shore A Hardness: 95 (per ASTM D2240)

2. Elongation: 300 percent (pe ASTM D412)

3. Tensile Strength: 2,400 psi (per ASTM D412)

4. Teer Strength: 500 pounds/linear inch (per ASTM D624)

5. Sheer Strength: 225 psi (per ASTM C273)

6. Finished Dry Thickness: 500 mils

7. Adhesion to Concrete: Substrate failure (per ASTM D7234)

Epoxy or polyurethane coating shall be high-build, snall be 100 percent solids, and shall
contain no volatile organic compounds. Coating shall be suitable for use as a trowel-
applied or spray-applied monolithic surfacing at the minimum dry film thickness specified

herein. Epoxy or polyurethane coating shall be Raven 405 by Raven Lining Systens,
Mainstay DS-5 by Madewell Products Corporation, SprayWall by Sprayrog, S-301 Epoxy

02800-4

Page Image
Finance Committee - Agenda - 5/17/2017 - P429

Finance Committee - Agenda - 9/7/2022 - P14

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Thu, 09/01/2022 - 11:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/07/2022 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__090720…

u. ADDENDA

No. dated 20
No. dated 20
No. dated 20
No. dated 20

The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions
such amounts as required by the CONTRACT DOCUMENTS.
This agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,

successors and assigns.

IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials this

Agreement in copies, each of which shall be deemed an original on the date first above written.
OWNER:
By:
NAME:
(SEAL)
ATTEST:
NAME:
TITLE:
CONTRACTOR:
BY:
(SEAL)
NAME:
ADDRESS:
ATTEST:
NAME:
TITLE:

Page 4 of 15

Page Image
Finance Committee - Agenda - 9/7/2022 - P14

Finance Committee - Agenda - 5/17/2017 - P430

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
430
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

Spray System by Warren Environmental, Inc., or Engineer-aoproved equal. Epoxy or
polyurethane coating shall meet the following requirements at aminimum:

1. Shore D Hardness: 85 (per ASTM D2240)
2 Compressive Strength: 12,000 psi (per ASTM D695)

3. Tensile Strength: 6,800 psi (per ASTM D638)

4. Flexural Strength: 11,000 psi (per ASTM D790)

5 Finished Dry Thickness: 125 mils

6. Adhesion to Concrete: Substrate failure (per ASTM D7234)

Cementitious base coat shall be a pumpable, Portland-based microsilica cement or
calcium aluminate cement. If the eooxy or polyurethane coating manufacturer also
manufactures a cementitious base coat, the cementitious base coat product shall be by the
same manufacturer as the epoxy or polyurethane top coat product. If the epoxy or
polyurethane coating manufacturer does not manufacture a cementitious base coat, the
cementitious base coat product shall be compatible with the epoxy or polyurethane top
coat product. Contractor shall ensure compatibility between the top coat product and
cementitious base coat product. Cementitious base coat shall be Raven 705CA by Raven
Lining Systems, Mainstay ML-72 by Madewell Products Corporation, or Engineer-
approved equal. Cementitious base coat, when cured, shall meet the following
requirements at 28 days at aminimum:

1. Compressive Strength: 9,200 psi (per ASTM C109)

2 Tensile Strength: 685 psi (per ASTM C496)

3 Flexural Strength: 1,200 psi (per ASTM C293)

4. Finished Dry Thickness: See Article 3.04, Paragraoh H herein
5 Bond Strength: 2,000 psi (pe ASTM C882)

PART 3 - EXECUTION

3.01

A.

3.02

GENERAL:

Contractor shall accurately field-measure and size the rehabilitation products for each
individual manhole. Each existing sewer manhole to be rehabilitated may have a different
configuration and varying field dimensions. All field measurements shall conform to the
requirements of the manufacturers of the rehabilitation products.

CHIMNEY SEAL (WHERE APPLICABLE):

All loose and protruding mortar, bricks, roots, aid anything else that might prevent proper
application of the chimney seal shall be removed prior to application.

02800-5

Page Image
Finance Committee - Agenda - 5/17/2017 - P430

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1726
  • Page 1727
  • Page 1728
  • Page 1729
  • Current page 1730
  • Page 1731
  • Page 1732
  • Page 1733
  • Page 1734
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact