Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 16831 - 16840 of 38765

Finance Committee - Agenda - 6/7/2017 - P354

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
354
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 2 of 3

G LConditi

Payment & Performance Bonding

Daily offloading, clean up & dumpsters for daily debris
Equipment, tooling, dust barriers & misc.

Project Management & Daily Supervision

Submittals

Project close out documentation

truction
Remove existing suspended metal panel ceilings, suspension system and lighting in
designated areas & dispose of
Furnish & install new 2’ x 2’ suspended acoustical ceiling system per plans &
specs
Cut & patch roof as needed
Furnish & install support frame for CMUA-1 (Make Up Air Unit)

Roofing

Cut new opening in roof deck

e Patch deck as needed

e Roof protection

e Furmish & install wood nailers

e Flash curb and pocket into existing rubber roof
Electrical

Demo & new power wiring, conduit and lighting per plans and specs

HVAC

Demo existing duct, air handler units & associated appurtenances
Furnish & install new equipment, temperature controls / conduit & wiring,
test & balance and hoisting / rigging

QUALIFICATIONS:

All work to be scheduled and completed with RTU #1 & #2

All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday

All areas (including roof) to be inspected prior to work commencing to verify
existing conditions, damage, etc.

Page Image
Finance Committee - Agenda - 6/7/2017 - P354

Finance Committee - Agenda - 6/7/2017 - P355

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
355
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 3 of 3

EXCLUSIONS:
e Site work, underground utilities & concrete pad for CMUA-1

Jobsite office trailer & fiumishings
Jobsite storage trailer
Temporary utilities
Temporary HVAC / controls
Temp / portable toilet
Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above
Environmental issues / removal
e Premium time and/or overtime

Any / all items not specifically stated above to be included

ITEM A: ($51,998.00)
e Complete all work associated with Control Building Boiler Room Make Up
Air Unit

ITEM C: ($ 74,390.00)
e Complete all work associated with the Control Building Offices Ductless Split
Systems

ITEM D: (3 29,408.00)
e Complete all work associated with the Replacement of Ceilings & Lighting in
the Control Building Lobby Area, Kitchenette/Lunch Room and Hallway

TOTAL LUMP SUM PROPOSAL AMOUNT $ 155,796.00
(One Hundred Fifty Five Thousand Seven Hundred Ninety Six Dollars)

THIS PROPOSAL IS SUBJECT TO VERBAL QUALIFICATION FOR
SCOPE OF WORK CLARIFICATION PURPOSES

Respectfully Submitted,

Dan Callahan
Dan Callahan — Vice President
Monadnock Commercial Building Co.

Page Image
Finance Committee - Agenda - 6/7/2017 - P355

Finance Committee - Agenda - 4/6/2022 - P355

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
355
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

Activity 3 ArcGIS Hub Site Configuration Support

Esri will provide up to 60 hours of consulting and coordination services to assist Nashua in
designing and configuring an external ArcGIS Hub landing page, two initiative pages, and an
open data site. This Hub site will serve as a central place for the public to locate GIS maps
and other spatial information. It is anticipated that consulting services will include the
following topics:
¢ Landing page requirements review and validation.
¢ Assist with configuration of ArcGIS Online users and groups, to support ArcGIS
Hub landing page content.
¢ Work with Nashua to configure an ArcGIS Hub landing page using existing
content available at https://www.nashuanh.gov/698/Maps.
¢ Work with Nashua to configure an ArcGIS Hub initiative page focused around the
Revaluation content created in Activity 1.
* Assist Nashua with the initial configuration of an Open Data site and provide
knowledge transfer on how to upload 2-3 representative datasets from existing
Nashua content. Nashua will upload remaining data on their own.
* Discuss best practices related to ArcGIS Hub configuration.
* Assist with configuration of commercial off-the-shelf (COTS) ArcGIS maps and
apps to support Hub Site, as time allows.

Nashua Responsibilities

e Procure necessary Esri software licenses, not included in the Pricing below. Portions
of the Equitable Property Value Solution require Hub Premium, including the
Residential Comp Finder and the Property Tax Assessment Appeal.

e Communicate consulting needs and priorities to the Esri consultant(s)
e Provide appropriate Nashua staff to participate

e Provide the Esri consultant(s) with access to Nashua’s current and historical data (i.e.
2011 — present) and system environment, as necessary.

Assumptions

e Pricing assumes all consulting services will be provided remotely from Esri’s offices
during Esri’s normal business hours and no travel will be required of the Esri
consultant(s).

e Consulting support is limited to Esri commercial-off-the-shelf (COTS) software, and
will not include any non-Esri-based systems.

e Nashua’s ArcGIS Organization is already set up and available to use for the Scope of
Services above.

e sri will not be responsible for data clean-up, if needed.

Page Image
Finance Committee - Agenda - 4/6/2022 - P355

Finance Committee - Agenda - 6/7/2017 - P356

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
356
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B. CONTRACT

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P356

Finance Committee - Agenda - 6/7/2017 - P357

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
357
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B-1.1
NOTICE OF AWARD

Dated , 20
TO:
(BIDDER)
OWNER’S PROJECT NO. IFB0292-041017
PROJECT: HVAC Upgrades
OWNER’S CONTRACT IFB0292-041017
CONTRACT FOR: HVAC Upgrades
OWNER’S PROJECT NO. IFB0292-041017
You are notified that your Bid dated for the above Contract has been

considered. You are the apparent successful bidder and have been awarded a contract for:

(Indicate total Work, alternates or sections of Work awarded)

The Contract Price of your contract is

Dollars ($ ).

1 copy of the proposed Contract Document (except Drawings) accompany ’s this Notice of Award

You must comply with the following conditions precedent within ten days of receiving this Notice
of Award.

1. You must deliver an executed Agreement, the Contract Security (Bonds), and the Certificate of
Liability Insurance as specified in the Information for Bidders and General Conditions.

3. (List other conditions precedent).

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P357

Finance Committee - Agenda - 6/7/2017 - P358

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
358
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Failure to comply with these conditions within the time specified will entitle OWNER to consider
your bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.

Within ten days after receipt of acceptable performance BOND, payment BOND and agreement
signed by the party to whom the Agreement was awarded, the OWNER will return to you one fully
signed counterpart of the Agreement with the Contract Documents attached.

City of Nashua NH

(OWNER)

(AUTHORIZED SIGNATURE)

(ITTLE)

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P358

Finance Committee - Agenda - 6/7/2017 - P359

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
359
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B2.1

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the day of in the year 2017 by and between the City of
Nashua, New Hampshire (hereinafter called OWNER) and Monadnock Building Compnay, of Jaffrey, NH and its
successors, transferees and assignees together hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally
described as follows:

The replacement or installation of several HVAC units at the Nashua Wastewater Treatment Facility (NWTF).
located at 2 Sawmill Road, Nashua, NH 03060. In addition to replacing or installing the HVAC units, all associated
ductwork, fans, controls, valves, traps. piping. lighting, electrical conduit and wire as well ceilings will need

to be replaced or installed in the affected areas.
ARTICLE 3 - ENGINEER
3.01 The Project has been designed by: Wright-Pierce
230 Commerce Way
Suite 302
Portsmouth, NH 03801
who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and
responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection
with completion of the Work in accordance with the Contract Documents.
ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final
payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Contract Duaration; Substanial Completion

A. The Work will begin once a written “ Notice to Proceed” is issued. Substantial Completion shall be
within 270 calendar days and Final Completion shall be within 300 calendar days.

AG -1 of 7

Page Image
Finance Committee - Agenda - 6/7/2017 - P359

Finance Committee - Agenda - 6/7/2017 - P360

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
360
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B2.1

B. Substantial Completion occurs when all work is complete except punch list items. The Contract
Times commence on the day indicated in the “Notice to Proceed”. Final Completion occurs when all work is
completed and ready for final payment, in accordance with paragraph 14.07 of the General Conditions.

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that
OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus
any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the
delays, expense and
difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is
not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as
liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER ONE THOUSAND dollars
($1,000) for each calendar day that expires after the time specified in paragraph 4.02 for Substantial Completion until
the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to
complete the remaining Work within the time specified in paragraph 4.02 for completion and readiness for final
payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER ONE THOUSAND
dollars ($1,000) for calendar cach day that expires after the time specified in paragraph 4.02 for completion and
readiness for final payment until the Work is completed and ready for final payment.

B. In the event that the CONTRACTOR fails to pay OWNER the specified liquidated damages amount
within thirty (30) days of CONTRACTOR's being notified of said damages, OWNER may deduct the amount of the
assessed liquidated damages from the final payment or retention withheld pursuant to Article 14 of the General
Conditions.

ARTICLE 5 - CONTRACT PRICE

5.01 Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR, in accordance
with the Contract Documents, the Contract Sum of:

EIGHT HUNDRED NINETY-SIX THOUSAND NINE HUNDRED FIFTY-SIX DOLLARS
($ 896,956.00 )

The Contract Sum shall include all items and services necessary for the proper execution and completion of the Work
determined below:

A. for all Unit Price Work, an amount equal to the sum of the established Unit Price for each separately
identified item of Unit Price Work times the estimated quantity of that
1tem, as indicated in the attached Bid Schedule;

B. as provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and
determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.08 of
the General Conditions. Unit prices have been computed as provided in paragraph 11.03 of the General Conditions.
ARTICLE 6 - PAYMENT PROCEDURES

6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

AG -2o0f7

Page Image
Finance Committee - Agenda - 6/7/2017 - P360

Finance Committee - Agenda - 6/7/2017 - P361

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
361
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B2.1

B. CONTRACTOR shall submit Applications for Payment under this agreement directly to:

City of Nashua

Attn: Accounts Payable
PO Box 2019

Nashua, NH 03061-2019
Atten: William Keating

To facilitate the proper and timely payment of applications, the City of Nashua requires that all invoices contain
a valid PURCHASE ORDER NUMBER.

6.02 Progress Payments; Retainage

A. Progress Payments. The OWNER will once each month make a progress payment to the
CONTRACTOR on the basis of an estimate of the total amount of work done to the time of the estimate and its value as
prepared by the CONTRACTOR and approved by the ENGINEER. All such payments will be measured by the
schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as provided in the General
Requirements.

B. Retainage. The OWNER will retain a portion of the progress payment, each month, in accordance
with the following procedures:

1. The OWNER will establish an escrow account in the bank of the OWNER’S choosing.
The account will be established such that interest on the principal will be paid to the
CONTRACTOR. The principal will be the accumulated retainage paid into the account by
the OWNER. The principal will be held by the bank, available only to the OWNER, until
termination of the contract.

2. Until the work is 50% complete, as determined by the ENGINEER, retainage shall be 10% of
the monthly payments claimed. The computed amount of retainage will be deposited in the
escrow account established above.

3. After the work is 50% complete, and provided the CONTRACTOR has satisfied the
ENGINEER in quality and timeliness of the work, and provided further that there is no
specific cause for withholding additional retainage no further amount will be withheld. The
escrow account will remain at the same balance throughout the remainder of the project.

6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General
Conditions, OWNER shall hold 2% retainage during the 1 (one) year warranty period and release it only after the
project has been accepted.

ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS
7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data
identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local,
and Site conditions that may affect cost, progress, and performance of the Work.

AG -3of7

Page Image
Finance Committee - Agenda - 6/7/2017 - P361

Finance Committee - Agenda - 6/7/2017 - P362

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
362
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

B2.1

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations
that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has carefully studied all Gf any): (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the
Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of
Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions.

CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as provided in paragraph 4.2 of the
General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and
may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER
do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Contract Documents with respect to Underground Facilities at or contiguous to the site.

E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of
construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety
precautions and programs incident thereto.

F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests,
studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in
accordance with the other terms and conditions of the Contract Documents.

G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the
Site that relates to the Work as indicated in the Contract Documents.

H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the Site, reports and drawings identified in the Contract Documents and all
additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by
ENGINEER is acceptable to CONTRACTOR.

J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.

ARTICLE 8 - CONTRACT DOCUMENTS
8.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement;
2. General Conditions:

3. Special Conditions;

AG -4o0f7

Page Image
Finance Committee - Agenda - 6/7/2017 - P362

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1680
  • Page 1681
  • Page 1682
  • Page 1683
  • Current page 1684
  • Page 1685
  • Page 1686
  • Page 1687
  • Page 1688
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact