Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 16621 - 16630 of 38765

Finance Committee - Agenda - 4/5/2017 - P36

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
36
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

To:

From:

Re:

D. Motion:

Attachment:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: March 23, 2017

Stephen Dookran, P.E., City Engineer
Engineering Department

FY17 Paving Program — Construction

To approve the award of the construction contract for the FY17 Paving Program to
E.J. Paving Company, Inc. of Methuen, MA in the amount of $1,729,148.30.
Funding will be through: Department: 161 Street; Fund: General; Activity: Paving;
Department: 161 Street; Fund: Trust; Account Category: 54 Property Services;
Department: 169 Wastewater; Fund: Wastewater; Activities: Sewer Structures and
Sewer Rehab.

FY17 Annual Paving Program Street Paving List

The FY17 Paving Contract is expected to pave approximately 5.6 miles of City streets
including 2,500 feet of Main Street and 3,100 feet of West Hollis Street. The contract
uses repair methods such as shim, overlay, milling and reclamation. It also includes
replacing obsolete and broken drainage and sewer castings.

The contract was advertised on February 3, 2017. Six contractors attended the
mandatory prebid and three contractors submitted bids on March 2, 2017. Bids are as

follows:

E.J. Paving Company Inc. of Methuen, MA $1,729,148.30
Brox Industries, Inc. of Dracut, MA $1,796,727.80
Newport Construction Corporation of Nashua, NH $1,900,519.10

E.J. Paving Company, Inc. of Methuen, MA at a bid price of $1,729,148.30 is the
qualified low bidder.

Page Image
Finance Committee - Agenda - 4/5/2017 - P36

Finance Committee - Agenda - 4/5/2017 - P37

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
37
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

2017 Annual Paving Program

Street Paving List

: Street ae : Aue “from 2 : Te
Blacksmith Way Kingston Drive Cul-De-Sac
Blue Jay Hill Monadnock Street End
Brigham Street Hutchinson Street End
Charlotte Street Amherst Street Charlotte Avenue
Donald Way McKenna Drive Hyacinth Drive
Fairway Street S Main Street Taylor Street
Gorman Avenue Temple Street Hoyts Lane
Gosselin Road Westgate Crossing Teak Drive
Governors Lane Ridge Road Cul-De-Sac
Howard Street Hoyts Lane Worcester Street
Hoyts Lane Scripture Street Shedds Avenue
Hughey Street Hutchinson Street Warsaw Avenue
Hutchinson Street Hughey Street End
Hyacinth Drive McKenna Drive Cul-De-Sac
Kern Drive Kingston Drive Cul-De-Sac
Kingston Drive Lund Road Lake Street
Macdonald Drive McKenna Drive McKenna Drive
Main Street Allds Street Orchard Avenue
McKenna Drive Conant Road Conant Road
Monadnock Street Reservoir Street _ Manchester Street
Scotia Way Macdonald Drive Cul-De-Sac
Scripture Street Temple Street Worcester Street
Shedds Avenue Worcester Street Hoyts Lane
Stable Road Governors Lane Cul-De-Sac
Swan Street Lund Road Kingston Drive
Teak Drive Gosselin Road Jolori Lane
Tolles Street Whitney Street Canal Street
Vieckis Drive East Dunstable Road Monica Drive
Warsaw Avenue Fairmount Street Hughey Street
West Hollis Street 967 West Hollis Street 1096 West Hollis Street
Worcester Street Scripture Street Shedds Avenue

Page Image
Finance Committee - Agenda - 4/5/2017 - P37

Finance Committee - Agenda - 4/5/2017 - P38

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
38
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

CITY OF NASHUA, NEW HAMPSHIRE

DRAWING INDEX

2017 PAVING PROGRAM
FEBRUARY 2017

MAYOR
HONORABLE JAMES DONCHESS

BOARD OF PUBLIC WORKS

JAMES DONCHESS - CHAIR
JOEL ACKERMAN - VICE CHAIR
PAUL G. BERGERON
KEVIN S. MORIARTY
TRACY PAPPAS

DIRECTOR OF PUBLIC WORKS
LISA FAUTEUX

CITY ENGINEER
STEPHEN DOOKRAN, P.E.

1 LOCUS MAP 1

2 LOCUS MAP 2

3 LOCUS MAP 3

4 NOTES

5 DIMESIONS

6 QUANTITIES 1

7 QUANTITIES 2

8 QUANTITIES 3

9 BLACKSMITH WAY

10 CHARLOTTE ST

11 FAIRWAY ST

12 GOSSELIN RD

13. GOVERNORS LN & STABLE RD

14 HOWARD ST

15 HUGHEY ST

16 HUTCHINSON ST & BRIGHAM ST

17 HYACINTH DR & DONALD WAY 1

18 HYACINTH DR & DONALD WAY 2

19 KERN DR

20 KINGSTON DR 1

21 KINGSTON DR 2

22 KINGSTON DR 3

23 MACDONALD DR 1

24 MACDONALD DR 2

25 MAINST 1

26 MAINST 2

2/ MCKENNA DR 1

28 MCKENNA DR 2

29 MONADNOCK ST & BLUE JAY HILL

30 SCOTIA WAY

31 SEWER STREET CLUSTER

32, SWAN ST

33. TEAKDR 1

34 TEAK DR2

35 TOLLES ST

36 VIECKIS AVE 1

3/ WVIECKIS AVE 2

38 WARSAW AVE

39 WEST HOLLIS 1

40 WEST HOLLIS 2

41 DETAILS 1

42 DETAILS 2

43 DETAILS 3

44 DETAILS 4
.. J
4 >

NO. REVISION DESCRIPTION DATE

PREPARED BY:

CITY OF NASHUA NEW HAMPSHIRE

CITY ENGINEER'S OFFICE
} 9 RIVERSIDE STREET
#” NASHUA, NEW HAMPSHIRE 03062

Page Image
Finance Committee - Agenda - 4/5/2017 - P38

Finance Committee - Agenda - 4/5/2017 - P39

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
39
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

@ _— OS ‘i SS
“<s

ae . —
\ 3

2a

\Y Y

Vf
Oo
e€ \ e242 $
d 2,
SS p-
g<

cami

MASEFIELD

ih

V/

=
go, &
Ge
RD
~ aa
i, qj ont
UW a
5 ¢ \
2 : \
S F ‘
& ne
Rd:
>
%
£ pe DR \
1
6 Ss Oo oO
9 A st
CG s
ss st y
6° iG
mee BCENWOOY \
9 me
. ot
FONE
5 » of
IN B\C
Y
LA
VIILLLLLAG
s ’
, . OR.
Oo ° a OR. B
¢
%
TION. RI R.
6 aaa
4,
%)
a
}

\_
& ‘sh

DUNS TABLE TYNGSBOROUGH .
MASS. MASS.
J
NV VO VO NASHUA, NEW HAMPSHIRE )
(PFE, CITY OF NASHUA NEW HAMPSHIRE TN a
ea CITY ENGINEER'S OFFICE YY N alae ean ecediatal
USEF 9 RIVERSIDE STREET NREL | | | FEBRUARY eee 4
NASHUA, NEW HAMPSHIRE 03062 Jno. REVISION DESCRIPTION DATE JU MAME NH-RIVT m WELCH = WELCH — T MENDOLA JL JL 2017 J OF 44 J

Page Image
Finance Committee - Agenda - 4/5/2017 - P39

Finance Committee - Agenda - 4/5/2017 - P40

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

Yj

+0

|[eer |. |

oak a Ve
eee
oN LT TVA
W) ae x \

o g
be ‘ iS / O é i)
ee af) YER x
pons ry ° Lb y x 2
2 IIE
4 g LATON
* 4 tj
4 Li HOST soe

;

a ‘ \al
, Fe. 180
3 x * mo ]

HOLLIS

(PFE, CITY OF NASHUA NEW HAMPSHIRE
fees) CITY ENGINEER'S OFFICE
QeeZe 9 RIVERSIDE STREET

NASHUA, NEW HAMPSHIRE 03062

DRAWN BY: DESIGNED BY:

REVIEWED BY:

REVISION DESCRIPTION DATE 4 ‘ T. WELCH T. WELCH

J. MENDOLA

DATE
FEBRUARY
2017

\.

d

NASHUA, NEW HAMPSHIRE
PLAN OF

2017 PAVING PROGRAM
LOCUS MAP 2

SHEET

Page Image
Finance Committee - Agenda - 4/5/2017 - P40

Finance Committee - Agenda - 4/5/2017 - P41

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
41
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

Pe RI
LL ih i, SS
py WR

\\
XQ
\\

WO

jl & WG ) l/
OY.

0

é
Vs
4 ‘a

¢” Y y " :
S LL SS Ki ‘ v Wy aoe
i. ele pis Hy — 2 Y =. WL Mtr ° \
Mj Ph AC \ lem we 7 —_ \ \
in YYW Uf te a . Y/ 9s | | — | \
| Z J eX j S| a ; ‘A , )
y ° lf “ eS ; y SE L | i : \ :
e Ey a FLL AVE. 7), Z9 SE % :

& AQ
N

SUMMER

\ %, ==
. . } “f * S
LAN _COvE <2
> Ar : 4 e
5 6 vy Fi i
QOD 7 eo ON 1 xse—
Q LL 4 is eS
UME K \
4 :
Y) Os LLL £7 “Ts x ‘ ‘ Y gr = ©) E os
rr x yy E Me
LX t, 55 {> Bs >, > ® 4 i y D (4
A Dy Qt § 2
j LL Bg VAN
LB 7? “ . oO f a
Cy, . GC 4 A
LOT Leg F x SA
RA ES
5 :
KL EMS po Sra TELA BLE ZN “ ZS
Vf,

X\ OA es

ma

NASHUA, NEW HAMPSHIRE
PLAN OF

Aries 2017 PAVING PROGRAM
Oy LOCUS MAP 3 SHEET

YS =
igSsate DRAWN BY: DESIGNED BY: REVIEWED BY: FEBRUARY 3

2017
JUno. REVISION DESCRIPTION DATE J MEET | WELCH T. WELCH J. MENDOLA JU JL J oF 44 J

-
t

E

=
(PFE, CITY OF NASHUA NEW HAMPSHIRE
(i225) CITY ENGINEER'S OFFICE
Suey” 9 RIVERSIDE STREET

Se" NASHUA, NEW HAMPSHIRE 03062

Page Image
Finance Committee - Agenda - 4/5/2017 - P41

Finance Committee - Agenda - 4/5/2017 - P42

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

c
GENERAL NOTES:

1. CONTRACTOR SHALL NOT PROCEED ON STREET SEGMENTS WITH CO-ORDINATION
ISSUES UNTIL DIRECTED BY THE ENGINEER.

CONSTRUCTION NOTES:

1. CONSTRUCT THIS PROJECT INACCORDANCE WITH THE MORE STRINGENT OF THE
NHDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (LATEST
APPROVED EDITION), OR CITY OF NASHUA, DIVISION OF PUBLIC WORKS STANDARD
PLANS, SUPPLEMENTAL SPECIFICATIONS AND SPECIAL PROVISIONS.

2. OVERHEAD AND UNDERGROUND ELECTRICAL AND COMMUNICATION LINES ARE
LOCATED THROUGHOUT THE PROJECT WITH CROSSINGS AT VARIOUS LOCATIONS.
EXTREME CAUTION IS REQUIRED IN THE OPERATION OF CONSTRUCTION EQUIPMENT.

3. EXACT LIMITS OF PAVE AND LOCATIONS/DEPTHS OF GRINDING WORK ARE PER THE
ENGINEER.

4. UNLESS OTHERWISE DIRECTED, USE THE MIXES WITH STONE SIZES AS SHOWN ON THE
TABLE OF THE DIMENSIONS SHEET.

5. REPLACE EXISTING STRIPING AS SOON AS PRACTIBLE FOLLOWING REMOVAL OR
ABANDONMENT OF THE EXISTING.

6. THE WORD "CASTING" IMPLIES BOTH FRAME AND GRATE FOR CATCH BASINS AND
FRAME AND COVER FOR MAN HOLES.

7. ADJUST ELEVATION OF EXISTING CASTINGS (TYP.) REPLACE TRIANGULAR CASTINGS
(TYP.) REPLACE ROUND CASTINGS AND CATCH BASIN CASTINGS AS DIRECTED BY THE
ENGINEER.

8. ALL FILLETS SHALL BE TEMPORARY, REMOVED AT TIME OF PAVE AND INCIDENTAL TO
GRINDING ITEM. ALL FILLETS SHALL SPAN THE FULL WIDTH OF ROAD OR DRIVEWAY.

9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SHOULDER GRAVEL, OR LOAM AND
SEED IN PLACE AS SOON A PRACTICABLE AFTER OVERLAY.

10. CONTRACT WORK SHALL INCLUDE THE TREATMENT OF SIDE STREET APRONS TO THE
EXTENT DIRECTED BY THE ENGINEER.

11. INSTALL WARNING SIGNS FOR APPROACHING TRAFFIC: "BUMP", "GROOVED PAVEMENT".
MARK JOINTS AND RAISED STRUCTURES WITH REFLECTIVE PAINT TO BE MAINTAINED
UNTIL FINAL OVERLAY IS COMPLETED.

12. ROAD AND LANE CLOSURES SHALL BE IMPLEMENTED ACCORDING TO MUTCD AND
NHDOT STANDARD SPECIFICATIONS, AND RECEIVE REQUIRED CITY OF NASHUA
PERMITS.

13. CONTRACTOR SHALL RE-ESTABLISH ALL EXISTING DRIVEWAY BERMS AND WHERE
PRACTICALBE MAKE THEM INTEGRAL WITH THE OVERLAY TREATMENT.

14. CONTRACTOR SHALL CONTACT DIG SAFE AND FOLLOW ALL PROCEDURES.

15. ANY PIPE WORK WITHIN THE CITY'S R.O.W SHALL BE PERFORMEND BY A CITY OF
NASHUA LICENSED DRAIN LAYER.

f YE | NASHUA, NEW HAMPSHIRE )
CITY OF NASHUA NEW HAMPSHIRE PLAN OF
CITY ENGINEER'S OFFICE 2017 PAVING PROGRAM __
9 RIVERSIDE STREET SEBRUARY NOTES 4
NASHUA, NEW HAMPSHIRE 03062 DRAWN BY: DESIGNED BY: REVIEWED BY: 5017
JUNO. REVISION DESCRIPTION DATE 4 T. WELCH T. WELCH J. MENDOLA q 2 OF 44 J

Page Image
Finance Committee - Agenda - 4/5/2017 - P42

Finance Committee - Agenda - 9/7/2022 - P29

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Thu, 09/01/2022 - 11:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/07/2022 - 00:00
Page Number
29
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__090720…

ENGINEERING REPORT PHASE CONTRACT Page 2 of 7
For Professional Services for Treatment Works
I. Services to be Performed by the ENGINEER

A. Upon execution of this AGREEMENT, the ENGINEER shall proceed with the general administration of construction
and fulltime inspection by qualified personnel of the contractor's work to assure compliance with the contract
documents and any coincident or subsequent changes or change orders for the construction of the treatment
works for the (Fewnr/City) of Nashua, New Hampshire, Sewer Siphon Rehabilitation. Said services shall include,
but shall not necessarily be limited to:

1. General Construction Administration
a. Updating and modifications of contract documents to meet changed site and project conditions or
variations in State or Federal requirements.

Completion of formal contract documents for the award of contracts.

Checking detail construction, shop and erection drawings submitted by the contractor.

Reviewing laboratory, shop, and mill test reports of materials and equipment.

Preparation of drawings and technical material as required to supplement and/or clarify the contract

documents.

g. Review, verification, and approval of estimates for periodic and final payments to the contractors for
submittal to the OWNER and the DIVISION.

h. Periodic inspection of work and final inspection.

i. Observing and reporting performance and qualifying tests required by specifications.

j. Keeping daily records of construction progress and compiling same into progress reports for submission
to the OWNER and DIVISION.

k. Verifying and keeping records of construction items of work accomplished for use as a basis of checking
contractors’ monthly estimates.

|. Consultation and advise during construction.

m. Determination of need for and preparation of change orders for approval by the OWNER and DIVISION
based on conditions found during construction and/or additions or modifications to the work requested
by the OWNER and approved by the ENGINEER and the DIVISION and implemented at a price
recommended by the ENGINEER as equitable. For change order items exceeding $10,000, the ENGINEER
shall prepare an independent cost estimate.

n. Determination of “equality” for substitution of materials and equipment specified and securing DIVISION
approval thereof.

o. Provide and maintain construction control lines and grades. For sewers offset lines and grade elevations,

with cut depths at manholes; at treatment plant and pumping station sites base lines for layout and

>~>oan

q. Preparation of certificate of substantial completion and contract completion.
r. Assist the OWNER in obtaining the required project related approvals of State and Federal agencies.

Rev. 2020-11

Page Image
Finance Committee - Agenda - 9/7/2022 - P29

Finance Committee - Agenda - 4/5/2017 - P43

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

2017 Streets

Gorman Ave
Hoyts Ln
Scripture St
Shedds Ave Governors Ln Hutchinson St Hyacinth Dr
Blacksmith Way Charlotte St Fairway St Worcester St Gosselin Rd Stable Rd Howard St Hughey St Brigham St Donald Way Kern Dr Kingston Dr
Treatment 1 Shim/Overlay Reclaim Reclaim Overlay Shim/Overlay Shim/Overlay Overlay Shim/Overlay Shim/Overlay Shim/Overlay Shim/Overlay Mill/Shim/Overlay
Shim Thickness (IN) 4" _ _ _ 4" 4" _ 4" 4" 4" 4" _
Base Course Thickness (IN) _ 2.25" 9.25" -- -- -- -- -- -- -- -- 2.25"
Wearning Course Thinckness (IN) 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25"
Shim Max Aggregate Size (IN) 3/8" 3/8" 3/8" -- 3/8" 3/8" -- 3/8" 3/8" 3/8" 3/8" --
Base Course Max Aggregate Size (IN) _ 0.75" 0.75" _- -- _- -- -- -- -- -- 0.75"
Wearing Course Max Aggregate Size (IN) 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8"
Approximate Segment Lengths (FT) 250 841 636 1665 870 1034 474 474 1009 1063 691 1910
Approximate Segment Area (SY) 1292 2286 2395 3835 3121 4363 1131 3272 3554 6160 2773 6966
Treatment 2 -- -- -- -- -- -- 7 7 7 7 7 7
Shim Thickness (IN) __ _ _ __ __ __ _- _- _- _- -- --
Base Course Thickness (IN) __ __ _ _ __ __ __ _- _- _- -- --
Wearning Course Thinckness (IN) _ __ __ _ _ __ __ _- _- _- _- --
Shim Max Aggregate Size (IN) _ __ _ __ _ _ __ __ _. _- _- _-
Base Course Max Aggregate Size (IN) _ _ _ __ __ _ _ __ __ _- _- _-
Wearing Course Max Aggregate Size (IN) _ __ _ __ _ __ __ _. _- _- _- _-
Approximate Segment Lengths (FT) _ __ _ _ __ __ __ _- _- _- _- _-
Approximate Segment Area (SY) _ __ _ _ __ __ __ _- _- _- _- _-
2017 Streets
Monadnock St
Main St McDonald Dr Mckenna Dr Blue Jay Hill Scotia Way Swan St Teak Dr Tolles St Vieckis Dr Warsaw Ave West Hollis St
Treatment 1 Mill/Shim/Overlay Shim/Overlay Mill/Shim/Overlay Shim/Overlay Shim/Overlay Shim/Overlay Shim/Overlay Overlay Shim/Overlay Shim/Overlay Mill/Shim/Overlay
Shim Thickness (IN) 1" 1" __ 1" 1" 1" 1" __ 1" 1" 1"
Base Course Thickness (IN) _ __ 2.95" __ _ _ __ __ _. _- _-
Wearning Course Thinckness (IN) 1.5" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.25" 1.5"
Shim Max Aggregate Size (IN) 3/8" 3/8" _ 3/8" 3/8" 3/8" 3/8" _ 3/8" 3/8" 3/8"
Base Course Max Aggregate Size (IN) __ _ 0.75" _ __ __ _. _- _- _- --
Wearing Course Max Aggregate Size (IN) 0.5" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 3/8" 0.5"
Approximate Segment Lengths (FT) 2504 2172 3332 903 360 792 2327 488 1581 357 3093
Approximate Segment Area (SY) 13061 7024 11872 2326 1772 2742 8438 1205 6196 1038 12756
Treatment 2 - - -- - -- 7 7 7 Reclaim ~ _
Shim Thickness (IN) _ __ __ _ _ __ __ __ _- _- _-
Base Course Thickness (IN) __ _ _ __ __ __ _- _- 2.25 _- _-
Wearning Course Thinckness (IN) __ _ _ __ __ __ _- _- 1.25 _- _-
Shim Max Aggregate Size (IN) _ _ _ __ __ _ _ _ __ __ _-
Base Course Max Aggregate Size (IN) __ _ __ _ __ __ _. _- 0.75" _- --
Wearing Course Max Aggregate Size (IN)
Approximate Segment Lengths (FT) __ _ _ __ __ __ _- _- 700 _- _-
Approximate Segment Area (SY) _ _ __ _ __ __ _. _- 2461 _- --
VO ( » ) NASHUA, NEW HAMPSHIRE
CITY OF NASHUA NEW HAMPSHIRE PLAN OF
CITY ENGINEER'S OFFICE 2017 PAVING PROGRAM
DATE SHEET
9 RIVERSIDE STREET FEBRUARY 5
NASHUA, NEW HAMPSHIRE 03062 ASAT | DRAWN BY: DESIGNED BY: REVIEWED BY: 5017
L NO. REVISION DESCRIPTION DATE JL T. WELCH T. WELCH J. MENDOLA y JU J OF 44 J

Page Image
Finance Committee - Agenda - 4/5/2017 - P43

Finance Committee - Agenda - 4/5/2017 - P44

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 04/05/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/05/2017 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040520…

Gorman Ave
Hoyts Ln
Scripture St
Estimated Shedds Ave Governors Ln
Item Description Unit Contract Quantity Blacksmith Way Charlotte St Fairway St Worcester St Gosselin Rd Stable Rd Howard St
203.112 Road Excavation and Regrade SY 2062 0 0 0 0 0 0 0
203.113 Driveway Excavtion and Regrade SY 324 15 15 15 0 15 15 0
304.112 Reclaimed Stabilized Base Processed in Place 12" Deep (F) SY 26850 0 2300 2400 0 0 0 0
304.33 Crushed Aggregate for Shoulders TON 46 2 2 2 2 2 2 2
403.6 Pavement Joint Adhesive LF 11220 0 0 0 0 0 0 0
403.11 Hot Bituminous Pavement, Machine Method (Shim/Base) TON 8264 73 305 321 0 177 247 0
403.11 Hot Bituminous Pavement, Machine Method (Top) TON 8619 93 163 171 274 223 311 81
403.12 Hot Bituminous Pavement, Hand Method TON 152 4.5 5.0 5.0 11.0 5.0 5.5 3.0
417 Cold Planing of Bituminous Surfaces SY 44800 0 0 0 0 0 0 0
417.20 Cold Planing Transitions SY 3240 100 30 30 200 260 100 90
604.4 Repair of Existing Structures VF 193 1 3 4 10 5 8 5
604.45 Adjusting to Grade Existing Castings EA 205 1 5 4 20 7 5 5
604.46 Replace Casting EA 189 1 1 3 0 2 10 4
605.47 Drop and Plate Casting For Reclaim EA 4 0 1 3 0 0 0 0
609.5 Reset Granite Curbing LF 270 0 50 0 0 10 20 0
609.811 Bituminouos Curbing LF 35 0 25 0 0 0 0 0
616.7 Local Traffic Loops 6'X50° (2-4-2 TURN) EA 9 0 0 0 0 0 0 0
618.6 Uniformed Officers ALLOWANCE 19008 - $ - $ - - $ - > - $ -
618.7 Flaggers ALLOWANCE 49270 678.00 $ 1,404.00 $ 1,549.00 1,356.00 $ 1,259.00 $ 1,259.00 $ 630.00
619.1 Maintenance of Traffic U
632.0104 Retroreflective Paint Pavement Markings, 4" Line LF 38739 0 1344 1336 0 0 0 0
632.3112 Retroreflective Thermoplastic Pavement Markings, 12" Line LF 928 0 23 150 0 0 0 0
632.32 Retrereflective Thermoplastic Symbol SF 187 0 0 0 0 0 0 0
632.80 Temporary Pavement Markers EA 1014 0 68 134 0 0 0 0
641 Loam and Seed TON 284 0 15 23 0 0 0 0
900 Liquid Asphalt Adjustment ALLOWANCE 33643 336.74 $ 934.18 $ 981.58 562.88 $ 799.88 $ 1,112.91 $ 165.90
-- Asphalt Testing Core (Subsidiary to 403.11) EA 25
-- Asphalt Testing Loose Sample (Subsidiary to 403.11) EA 25
-- Asphalt Precore (Subsidiary to 417) EA 12 0 0 0 0 0 0 0
a Silt Sacks (Subsidiary to 304.112) EA 14 0 5 5 0 0 0 0
-- Silt Sacks (Subsidiary to 417) EA 89 0 0 0 0 0 0 0
J
VO ) NASHUA, NEW HAMPSHIRE )
CITY OF NASHUA NEW HAMPSHIRE PLAN OF
CITY ENGINEER'S OFFICE a Noe Oo _
9 RIVERSIDE STREET FEBRUARY ° G
NASHUA, NEW HAMPSHIRE 03062 DRAWN BY: DESIGNED BY: REVIEWED BY: 2017
JUNO. REVISION DESCRIPTION DATE J T. WELCH T. WELCH J. MENDOLA JU 2 OF 44 J

Page Image
Finance Committee - Agenda - 4/5/2017 - P44

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1659
  • Page 1660
  • Page 1661
  • Page 1662
  • Current page 1663
  • Page 1664
  • Page 1665
  • Page 1666
  • Page 1667
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact