Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10691 - 10700 of 38765

Finance Committee - Agenda - 11/15/2017 - P364

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
364
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 62 70
SCADA COMPUTERS AND SOFTWARE

PART 1-— GENERAL
1.01 SUMMARY
A. Section Includes

1. Provide labor, materials, equipment and incidentals, as shown, specified
and required to furnish, install, and test the new computer system, including
human machine interface (HMI), computers, supervisory control and data
acquisition (SCADA) software and remote access hardware, in accordance
with this Section.

1.02 PRICE AND PAYMENT PROCEDURES

A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.
1.04 SUBMITTALS

A. Submit in accordance with Division 01 General Requirements.

B. Shop Drawings

1. Manufacturer’s literature, illustrations, Specifications, Drawings, data, and
descriptive literature on all pieces of equipment

2. Deviations from Drawings and Specifications
3. Engineering data including dimensions, materials, size, and weight
4. Fabrication, assembly, installation and wiring diagrams

C. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.

1.05 QUALITY ASSURANCE

A. Provide in accordance with Division 01 General Requirements.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P364

Finance Committee - Agenda - 11/15/2017 - P365

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
365
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.06 DELIVERY, STORAGE, AND HANDLING

A.

B.

C.

D.

Provide in accordance with Division 01 General Requirements.
Deliver equipment as directed to ensure uninterrupted progress of the Work.

Handle computer equipment very carefully. Damaged computer equipment will be
rejected.

Store equipment to permit easy access for inspection and identification.

1.07. SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

1.08 WARRANTY

A.

Computer 3-year basic limited warranty and 3-year next business day (NBD) on
Site service.

Software: Provide 1 year extended warranty, with software version upgrades,
telephone technical support and online web based download area and Knowledge
Base. Include customer support through a factory trained Engineer or technician
available 24 hours, 7 days a week.

PART 2-— PRODUCTS

2.01 RACK MOUNTED COMPUTER

A.

Furnish 1 Dell R730 rackmount computer with the following features.

1. PowerEdge R730 Server (210-ACXU)

2. PowerEdge R730/R730xd Motherboard (591-BBCH)

3. Dell Hardware Limited Warranty Plus On Site Service (976-8706)

4. MISSION CRITICAL PACKAGE: Enhanced Services, 3 Year (976-8709)
Mission Critical Package: 4-Hour 7x24 On-Site Service with Emergency
Dispatch, 3 Year (976-8710)

5. ProSupport: 7x24 HW / SW Tech Support and Assistance, 3 Year (976-
8711)

6. On-Site Installation Declined (900-9997) US Order (332-1286) PowerEdge
R730 Shipping (340-AKKB) R730/xd PCle Riser 2, Center (330-BBCO)

7. R730 PCle Riser 3, Left (330-BBCQ)

SCADA COMPUTERS AND SOFTWARE

WOODARD & CURRAN 40 62 70-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P365

Finance Committee - Agenda - 11/15/2017 - P366

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
366
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

8. R730/xd PCle Riser 1, Right (330-BBCR)

9. Intel Ethernet X540 DP 10Gb BT + I350 1Gb BT DP Network Daughter
Card (540-BBCC) Intel Ethernet I350 QP 1Gb Network Interface Card (xx)
VFlash, 8GB SD Card for iDRAC Enterprise (385-BBCB)

10. iDRAC8 Enterprise, integrated Dell Remote Access Controller, Enterprise
(385-BBHO) Chassis with up to 16, 2.5" Hard Drives (350-BBEP) Bezel
(350-BBEJ) Performance BIOS Settings (384-BBBL) No RAID for
H330/H730/H730P (1-16 HDDs or SSDs) (780-BBJS) PERC H730
Integrated RAID Controller, 1GB Cache (405-AAEG) Intel Xeon E5-2630
v3 2.4GHz,20M Cache,8.00GT/s QPL, Turbo,HT,8C/16T (85W) Max Mem
1866MHz (338-BFFU)

11. Upgrade to Two Intel Xeon E5-2630 v3 2.4GHz,20M Cache,8.00GT/s
QPILTurbo,HT,8C/16T (85W) (374-BBHD) 16GB RDIMM, 2133 MT/s,
Dual Rank, x4 Data Width (370-ABUG) 16 2133MT/s RDIMMs (370-
ABUF) Performance Optimized (370-AAIP) 300GB 10K RPM SAS 6Gbps
2.5in Hot-plug Hard Drive,13G (400-AEEC) x 6 Electronic System
Documentation and OpenManage DVD Kit, PowerEdge R730/xd (631-
AAJG).

12. DVD+/-RW, SATA, Internal (429-A APS)

13. ReadyRails Sliding Rails With Cable Management Arm (770-BBBR) Dual,
Hot-plug, Redundant Power Supply (1+1), 750W (450-ADWS) NEMA 5-
15P to C13 Wall Plug, 125 Volt, 15 AMP, 10 Feet (3m), Power Cord, North
America (450-AALV) 2 Internal Dual SD Module (330-BBCL) Redundant
SD Cards Enabled (385-BBCF) 8GB SD Card For IDSDM (385-BBIF)
8GB SD Card For IDSDM (385-BBIF) No Operating System (619-ABVR)
No Media Required (421-5736) DIMM Blanks for System with 2
Processors (370-ABWE) Standard Heatsink for PowerEdge R730/R730xd
(374-BBHM) Standard Heatsink for PowerEdge R730/R730xd (374-
BBHM)

14. Contact Bob Born of Axis Business Solutions (Phone: 603-294-4669) for
quotation and reference quote number AXSQ80744.

15. Provide additional network interface card.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-3

Page Image
Finance Committee - Agenda - 11/15/2017 - P366

Finance Committee - Agenda - 11/15/2017 - P367

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
367
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2.02 DESKTOP COMPUTERS AND ACCESSORIES

A. Furnish (5) Dell® Optiplex 7050 Desktop computers as indicated on drawings with
features as follows.

1. Processor: Intel® Core 13-7100 Processor 3.9 GHz, 4M, L2
2. Chassis configuration: Micro Form Factor

3. Memory: 32GB DDR4 Non-ECC SDRAM, 2400 MHz.

4. Keyboard: USB keyboard, no hotkeys.

5. Monitor: 24 inch widescreen flat panel LCD.

6. Mouse: USB optical mouse with scroll.

7. Hard drive: 128GB SATA solid state drive

8. Video: 256MB NVDIA® video card.

9. Audio: Integrated audio.
10. — Ports (minimum)

a. USB: 6

b. HDMI: 1

C. Serial: 1

11. Operating system: Microsoft Windows 10 Professional, 64 Bit ®
12. | Network Adapter

B. Provide 4 computer stands Dell 482-BBBP or equivalent. Stand shall be mounted
to back of control panel door to hold computer in place.

C. Provide 4 Industrial Monitors: Automation Direct ATM1900 or equivalent

D. Provide 4 DVI for HDMI video adapters for above monitors

E. Provide 1 desktop monitor 24 inch LED type, Dell or equivalent

F. Provide two 1000VA, 120VAC, UPS units: APC SMT1000 or equivalent

G. Provide 4 shelves for keyboard and mouse sets. Fasten to control panel door

exterior below monitor.

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-4

Page Image
Finance Committee - Agenda - 11/15/2017 - P367

Finance Committee - Agenda - 4/6/2022 - P231

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
231
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

or corrected) reflecting such changes from the tentative certificate as ENGINEER believes justified after consideration
of any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion
ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation to division of responsibilities pending
final payment between OWNER and CONTRACTOR with respect to security, operation, safety, and protection of the
Work, maintenance, heat, utilities, insurance, and warranties and guarantees. Unless OWNER and CONTRACTOR agree
otherwise in writing and so inform ENGINEER in writing prior to ENGINEER's issuing the definitive certificate of
Substantial Completion, ENGINEER's aforesaid recommendation will be binding on OWNER and CONTRACTOR until
final payment.

B. OWNER shall have the right to exclude CONTRACTOR from the Site after the date of Substantial Completion, but
OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list.

14.05 Partial Utilization

A. Use by OWNER at OWNER's option of any substantially completed part of the Work which has specifically been
identified in the Contract Documents, or which OWNER, ENGINEER and CONTRACTOR agree constitutes a separately
functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant
interference with CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to
Substantial Completion of all the Work subject to the following conditions.

1. OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work
which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that
such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part
of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for
that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR, and ENGINEER
shall make an inspection of that part of the Work to determine its status of completion. If ENGINEER does not
consider that part of the Work to be substantially complete, the provisions of paragraph 14.04 will apply with
respect to certification of Substantial Completion of that part of the Work and the division of responsibility in
respect thereof and access thereto.

2. No occupancy or separate operation of part of the Work may occur prior to compliance with the requirements
of paragraph 5.10 regarding property insurance.

14.06 Final Inspection

A. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER
will promptly make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all
particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately
take such measures as are necessary to complete such Work or remedy such deficiencies.

14.07 Final Payment
A. Application for Payment

1. After CONTRACTOR has, in the opinion of ENGINEER, satisfactorily completed all corrections identified during
the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating
instructions, schedules, guarantees, Bonds, certificates or other evidence of insurance certificates of inspection,
marked-up record documents (as provided in paragraph 6.12), and other documents, CONTRACTOR may make
application for final payment following the procedure for progress payments.

2. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all
documentation called for in the Contract Documents, including but not limited to the evidence of insurance

GC -500f55

Page Image
Finance Committee - Agenda - 4/6/2022 - P231

Finance Committee - Agenda - 11/15/2017 - P368

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
368
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

H. Locations for the five desktop computers shall be in two new panels (Gallery
Computer panel, Pump Building panel), two existing panels (Wet Weather CP-21,
Sedimentation CP-31) and on desk in main office. For panels, install computers and

industrial monitors similar to detail as shown on Gallery Computer Panel drawing
(1-2800).

2.03 SOFTWARE UPGRADES AND REGISTRATION

A. Provide upgrade of all software packages as listed in Table 40 62 70-1 to current
editions. Coordinate upgrade of software packages using serial numbers from
Owner as listed. Provide desired “Designated for (After Upgrade)” use as tabulated.
Some items require a trade-in for other items. Bidder shall work with local
Rockwell Software vendor (Horizon Solutions) to determine costing of upgrades
and include with bid. Contact Owner or Engineer for additional clarifications if
necessary.

B. Register all software licenses to Owner
2.04 SOURCE QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.

PART 3— EXECUTION (NOT USED)

END OF SECTION

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-5

Page Image
Finance Committee - Agenda - 11/15/2017 - P368

Finance Committee - Agenda - 11/15/2017 - P369

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
369
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-6

Page Image
Finance Committee - Agenda - 11/15/2017 - P369

Finance Committee - Agenda - 11/15/2017 - P370

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
370
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

SUIYIe|| JBAIAS - TVAVOS 39 UOHRIPA PABPURIS OOOS OIPNIS | T WINAOOECTY-7CE6 ff PESeyrind II4
dojde] Apuey qual|D UOHRIPA PABPURIS OOOS OIPNIS | T WNAO0ECTH-7ZE6| dojdeq Apuey
aulyse|| JOAIaS -TVGVIS) |PWON| = Mys 917 Aeldsiq JUN 4S JaAsas MalA 14 /T ANAVOOOSSMA-TOZ6| VOGOTO9SSZ
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON asldsajuq MalA 14 404 OIPNIS 14 /T ANALSMA-TOZ6| 6V8TO006CSZ
GALINIINA OLNIAGVYL- cvdvos) = JEWJON Ae|dsiq OOT JaAsas 4S MAIA 14|T ANAVOOTSSMA-TOZ6| 99TTOOLCSZ
GALINIINA OLNIAGVYL- cvdvos) = JEWJON Ae|dsiq OOT JaAsas 4S MAIA 14|T ANAVOOTSSMA-TOZ6| S9TTOOLCSZ
doyyjseq Wooy Aydos{) = |eWJON WUal|D AS MAIA L4AIT ANAVMISMA-TO0Z6| POZS90VCSZC
Z doyysaq Jayjyeay eM] = |EWJON WUal|D AS MAIA L4AIT ANAVMOSMA-TOL6| ZSv6007cS7
T doyysaq Jayjeay eM] = JEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZL6| 8T C8007CS7
UaasJosyono] Suajemaq| |eWJON WUal|D AS MAIA L4AIT ANAVMOISMA-TOZL6| CVT8007CS7
dojzyJseq Suuajzemaq) |eWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZ6| PO8EDOVCSZ
doyjsaq sulpjing dung) = JEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOZ6| ECO8EOOVCSZ
doyjsad Z suolesadg Did} = |EWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| PESEDOVCSZ
dosed T suoiesadg Did} = |PEWJON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| CE9EDOVCSC
doyjseq VAVIS a|9ON| = |PWON WUal|D AS MAIA L4AIT ANAVMISMA-TOL6| CESEOOVCSZ
| doyde] Apuey| = |eWJoNn Alossazay MalA|aued |T EQN-TTLZC| TSOOEOTOEC
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON UOHIPZ BUIYe|] 404 OIPNIS MA!IA L4A|T ANANLSMA-TOZ6 | 9ET6VOLIST
| doyde] Apuey| = |eWJoNn UOHIPZ BUIYe|] 404 OIPNIS MA!IA L4A|T ANANLSMA-TOZ6| ZSS7O0r9ST
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON JAAIAS IISSe[D UEMO3SIH 4/21 AsO} |T OOTZSLSH-8S€6| ZS8TOOZEST
| doyde] Apuey| = |eWJoNn NJ aemyos psepuels OOS XIS07Sy|T ANAOOEOTY-7ZE6 | 8CTLSTCTOT
SUIYDe|| JBAIBS - TVGVOS| = =JEWJON NJ aemyos psepuels OOS XIS07Sy|T ANAOOEOTY-72E6 | TVZCLOCTOT
(apessdy¢ say) 404 pajeuzisag snjeqs uo!dii9saq | sjjeysuy Jaquinn sojezeD ON [elas

SWEISO1d BIEMIJOS BulysIxq JO 3s!]

T-OZ 29 OF FIGEL

Page Image
Finance Committee - Agenda - 11/15/2017 - P370

Finance Committee - Agenda - 11/15/2017 - P371

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
371
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

This page intentionally left blank

Page Image
Finance Committee - Agenda - 11/15/2017 - P371

Finance Committee - Agenda - 11/15/2017 - P372

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
372
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 63 43
PROGRAMMABLE LOGIC CONTROLLERS
PART 1 —- GENERAL
1.01 SUMMARY
A. Section Includes
1. Provide labor, materials, equipment, and appurtenances to furnish and

install the programmable logic controllers and operator interface terminals
as specified and on the Drawings in accordance with this Section.

2. Definitions
a. PLC: Programmable Logic Controller
b. RIO: Remote Input/Output Rack

OIT: Operator Interface Terminal
HMI: Human Machine Interface
€. RTU: Remote Terminal Unit

a 0

f. 1/O: Input Output
g. SCADA: Supervisory Control and Data Acquisition

3. Work not included

a. PLC programming, HMI/OIT screen development, and integration
of new SCADA system will be provided by Engineer.

1.02 PRICE AND PAYMENT PROCEDURES

A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.

1.04 SUBMITTALS

A. Submit in accordance with Division 01 General Requirements.

B. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.

C. Provide manufacturer’s descriptive literature (product data in the form of catalog

cut sheets) for each piece of equipment.

PROGRAMMABLE LOGIC CONTROLLERS
WOODARD & CURRAN 40 63 43-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P372

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1066
  • Page 1067
  • Page 1068
  • Page 1069
  • Current page 1070
  • Page 1071
  • Page 1072
  • Page 1073
  • Page 1074
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact