Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10671 - 10680 of 38765

Finance Committee - Agenda - 11/15/2017 - P346

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
346
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

B. Device Plates

1. Device plates and receptacle cover plates for receptacles and light switches
shall be suitably labeled, identifying the circuit number and the panel
name; for example: RP1-12.

2. Device plates shall be identified on the inside of the plate by circuit
number and panelboard.
C. Control Stations
1. Mount equipment so that sufficient access and working space is provided

for ready and safe operation and maintenance.

2. Securely fasten equipment to walls or other surfaces on which they are
mounted. Provide independent galvanized steel supports where no wall or
other surface exists.

3. Install in conformance with National Electrical Code.

END OF SECTION

WIRING DEVICES
WOODARD & CURRAN 26 27 26-7

Page Image
Finance Committee - Agenda - 11/15/2017 - P346

Finance Committee - Agenda - 11/15/2017 - P347

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
347
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

WIRING DEVICES
WOODARD & CURRAN 26 27 26-8

Page Image
Finance Committee - Agenda - 11/15/2017 - P347

Finance Committee - Agenda - 4/6/2022 - P229

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
229
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

4. By recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i)
inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive,
extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the
responsibilities specifically assigned to ENGINEER in the Contract Documents; or (ii) that there may not be other
matters or issues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle
OWNER to withhold payment to CONTRACTOR.

5. Neither ENGINEER's review of CONTRACTOR's Work for the purposes of recommending payments nor
ENGINEER's recommendation of any payment, including final payment, will impose responsibility on ENGINEER to
supervise, direct, or control the Work or for the means, methods, techniques, sequences, or procedures of
construction, or the safety precautions and programs incident thereto, or for CONTRACTOR's failure to comply
with Laws and Regulations applicable to CONTRACTOR's performance of the Work. Additionally, said review or
recommendation will not impose responsibility on ENGINEER to make any examination to ascertain how or for
what purposes CONTRACTOR has used the moneys paid on account of the Contract Price, or to determine that title
to any of the Work, materials, or equipment has passed to OWNER free and clear of any Liens.

6. ENGINEER may refuse to recommend the whole or any part of any payment if, in ENGINEER's opinion, it would
be incorrect to make the representations to OWNER referred to in paragraph 14.02.B.2. ENGINEER may also
refuse to recommend any such payment or, because of subsequently discovered evidence or the results of
subsequent inspections or tests, revise or revoke any such payment recommendation previously made, to such
extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because:

a. The Work is defective, or completed Work has been damaged, requiring correction or replacement;
b. The Contract Price has been reduced by Written Amendment or Change Orders;

c. OWNER has been required to correct defective Work or complete Work in accordance with paragraph
13.09; or

d. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraph 15.02.A.
B. Applications for Payments.

1. CONTRACTOR shall submit to OWNER the ENGINEER recommended Application for Payment filled out and
signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by
such supporting documentation as is required by the Contract Documents. If payment is requested on the
basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or
at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of
sale, invoice, or other documentation warranting that OWNER has received the materials and equipment free
and clear of all Liens and evidence that the materials and equipment are covered by appropriate property
insurance or other arrangements to protect OWNER's interest therein, all of which must be satisfactory to
OWNER. Any request for partial or final payment shall specifically list the work completed. Requests for
payment for services performed under this agreement shall be submitted as stipulated in Article 6 - Payment
and Procedures in the Agreement.

2. Beginning with the second Application for Payment, each Application shall include an affidavit of CONTRACTOR
stating that all previous progress payments received on account of the Work have been applied on account to

discharge CONTRACTOR's legitimate obligations associated with prior Applications for Payment.

3. The amount of retainage with respect to progress payments will be stipulated in the Agreement.

GC - 48 of 55

Page Image
Finance Committee - Agenda - 4/6/2022 - P229

Finance Committee - Agenda - 11/15/2017 - P348

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
348
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 27 00 00

COMMUNICATIONS
PART 1 - GENERAL
1.01 SUMMARY
A. Furnish, install, test and make ready for operation; complete data communications

system as specified herein and as shown on the Drawings. The data system shall
include but are not limited to the following:

1. Data Devices
2. Racks & Patch Panels
3. Wire and Cable
4. Cable Terminations
1.01 PRICE AND PAYMENT PROCEDURES
A. Measurement and payment requirements: per Division 01 General Requirements.
1.02 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 specification sections, apply to this
section.

B. Related Sections

1. Division 26: Section 26 05 00 COMMON WORK RESULTS FOR
ELECTRICAL

2. Division 26: Section 26 05 33 RACEWAYS, BOXES, & SUPPORTING
DEVICES

3, Division 26: Section 26 27 26 WIRING DEVICES
1.02 REFERENCES
A. Reference Standards.

1. All work shall be performed in accordance with ANSI/TIA/EIA 568B
cabling standards.

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P348

Finance Committee - Agenda - 11/15/2017 - P349

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
349
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General
Requirements.

1.04 SUBMITTALS

A. Submit in accordance with the Division 01 General Requirements.
A. Provide manufacturer's product data, test reports, and materials certifications.
B. Submit a complete master wiring diagram engineering drawing of the system with

specification sheets covering all components of the system and block diagrams
indicating all components and inter-wiring (quantity and size). The system and
equipment shown in the engineering drawings and specifications shall meet all
requirements of this specification.

1.05 QUALITY ASSURANCE
A. Provide in accordance with Division 01 General Requirements.
B. Reference Standards.

1. All work shall be performed in accordance with ANSI/TIA/EIA 568B
cabling standards.

1.06 RECORD DOCUMENTATION

A. Provide drawings in accordance with EIA TIA/EIA-606-A. Accurately record
actual locations and mounting heights of outlets if not as shown on Drawings,
plus pull and junction box locations.

B. Accurately record actual routing of conduits and cables. Indicated dimensions
from nearest column lines on the As-Built Drawings.

1.07 SITE CONDITIONS
A. Existing Conditions: per Division 01 General Requirements.

B. The Contractor shall provide the labor, tools, equipment, and materials necessary
to provide a complete data communications system in accordance with the plans
and as specified herein. This includes the furnishing and installing of complete
systems of interior raceways and junction boxes, wiring and jacks, cover plates, C
& D type clamps and hangers, including final connections and terminations at the
origination and outlet end of all cables.

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P349

Finance Committee - Agenda - 11/15/2017 - P350

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
350
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

C.

E.

The contractor shall be responsible for running all wiring/cable for the data
communications system unless specifically indicated otherwise. Cables shall run
for each outlet/device location to the equipment rack mounted patch panel and
associated rack mounted Ethernet switches located in the Electrical Room. All
cables shall be terminated and tested at the equipment rack and at the
outlet/device location. Unless indicated otherwise within this specification or on
the Contract Drawings, all rack mounted equipment, switches, patch panels,
UPS’s, etc. shall be furnished, installed, wired and tested by the contractor.

Wire and cable routing is generally not shown on the Drawings. Route wire and
cable as required to meet project conditions. In no case shall cable lengths exceed
328 feet.

Determine exact routing, number of conductors and lengths required.

1.08 COORDINATION

A.

B.

Determine required separation between cables and other work.

Determine cable routing to avoid interference with other work.

PART 2 - PRODUCTS

2.01 COMPONENTS

2.02 WIRE AND CABLE

A.

Cabling shall be UL listed for the application and shall comply with EIA
TIA/EIA-568-B and NFPA 70. Provide a labeling system for cabling as required
by EIA TIA/EIA-606-A and UL 969.

When running cables in ceiling return air plenums, use Teflon Air Plenum cable,
unless used inside conduit or tubing sleeve.

Provide conduit or tubing sleeves when passing through walls and floors.
Provide bushings at each end of conduit runs.

Cables shall be derated appropriately in accordance with NEC when combined in
a common conduit run.

Areas used as air plenums: run fire-resistant teflon cable approved for use in air
plenums.

SCADA Category 6 Cables

COMMUNICATIONS

WOODARD & CURRAN 27 00 00-3

Page Image
Finance Committee - Agenda - 11/15/2017 - P350

Finance Committee - Agenda - 11/15/2017 - P351

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
351
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1. Furnish and install CAT6 four pair, 24 AWG annealed copper, UTP cables
with PVC jackets at all locations indicated on the Drawings.

2. All cables shall be "YELLOW?” in color.

3. All cables shall be terminated and tested at the equipment rack, and at the
opposite termination point.

H. SCADA Fiber Optic Cable

1. Conductors shall be multimode, graded index, solid glass waveguides with
a nominal core diameter of 62.5 microns. The fiber shall have
transmission windows centered at 850 and 1300 nanometer wavelengths.
The numerical aperture for each fiber shall be a minimum of 0.275. The
attenuation at 850 nanometers shall be 3.5 dB/Km or less. The attenuation
at 1300 nanometers shall be 1.5 dB/Km or less. The minimum bandwidth
shall be 160 MHz-Km at 850 nanometers and 500 MHz-Km at 1300
nanometers. FO cable shall be certified to meet EIA ANSI/EIA/TIA-455-
30B and EIA ANSI/EIA/TIA-455-58B.

2. Fiber Cable installed below grade shall be installed within “inner duct”
inside of all raceways.

2.03 EQUIPMENT
A. Wall Mounted Equipment Rack

1. Rack shall be of flush design for installation against a wall. Unit shall be
pre-drilled with 10-32 holes to accommodate 19” equipment. Unit shall be
made of 12 gauge steel with a bottom hinged panel to provide access to
rack mounted equipment. Hinged panel shall pivot 90 degrees with
positive stop, providing a stable platform for punch-down interconnects.

2. Unit shall be capable of housing up to 12 rack units.

3. Unit shall be equal to Hoffman Model EWMWG242418, or approved
equal.

B. Rack Mounted Patch Panels
1. CAT6 Patch Panels

a. Provide one (1) 48 port CAT6 patch panel designed to bolt in the
equipment rack assembly. Units shall be provided with full
complement (48 modules) of CAT6 cable termination modules.
Provide ports as required for installed cables, plus 10% spare.

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-4

Page Image
Finance Committee - Agenda - 11/15/2017 - P351

Finance Committee - Agenda - 11/15/2017 - P352

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
352
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
b. Modules shall be labeled in front with room location number.
C. Modules shall be color coded “YELLOW” to match SCADA
cables.

C. Rack Mounted Ethernet Switch

1. Provide one (1) 24 port Managed Industrial CAT6 Ethernet Switches
designed to install in equipment rack assembly. Switch shall be provided
with full complement (24 modules) of CAT6 cable termination modules.
Provide ports as required for installed cables, plus 10% spare. Switch shall
be utilized for the facilities SCADA system.

2. Units shall have connectivity for up to 24 Gigabit ports with integral
fiberoptic termination modules. Units shall be provided in a rugged 19”
rackmount enclosure.

3. Switches shall be suitable for -40C to 85C operating temperature, and also
have dual power inputs options for 18-49VDC or 90-264VAC.

4. Units shall be equal to N-Tron Model #NT24K-AC1, Cisco, Linksys or
approved equal.

5. Modules shall be labeled in front with room location number.
6. Modules shall be color coded “YELLOW” to match SCADA cables.

D. Rack Mounted VPN/Firewall Appliances

1. Provide one (1) VPN/Firewall Appliance to be located in the equipment
rack assembly.
2. Unit shall feature the following:
a. Wide area network (WAN) port and four additional Ethernet-ports.
b. Highly secure real-time control communication
C. Secure routing and firewall capabilities
d. Virtual Private Network (VPN)
e. Intrusion Protection capabilities
f. Network Address Translation (NAT)
g. NBAR protocol filtering
h. Access Control Lists (ACL)

_.

Quality of Services (QOS) for prioritization

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-5

Page Image
Finance Committee - Agenda - 11/15/2017 - P352

Finance Committee - Agenda - 11/15/2017 - P353

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
353
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

E.

3. Unit shall be Cisco model ASA5506-K9 or approved equal.
4. Provide Cisco model ASA5506-RACK-MNT rack mounting unit

5. Provide Tofino Xenon Xe-02-00-T1-T1-T-DD-Z9-000V for use in main
panel.

6. Provide initial year of all security services, subscriptions and
documentation for transfer of registration if necessary.

Rack Mounted Uninterruptable Power Supply (UPS)
1. Provide one (1) UPS designed to bolt to the equipment rack assembly.

2. Unit shall have a nominal input voltage of 120VAC with an output power
capacity of 1900 Watts/1650 VA.

3. Unit shall have maintenance-free sealed lead-acid battery with suspended
electrolyte. Total recharge time shall be 3hrs.

4. Unit shall be equal to APC Model #SUA2000RM2U, Dell or approved
equal.

2.04 SOURCE QUALITY CONTROL

A.

Provide in accordance with Division 01 General Requirements.

PART 3 - EXECUTION

6.01 INSTALLATION

A.

Install cabling and pathway systems, including cable, pathway systems, Data
outlet/connector assemblies, and associated hardware in accordance with all
applicable standards and codes. Provide in accordance with Network Architecture
drawings.

Install minimum one (1) 1" conduit, or as otherwise noted or detailed on the
Contract Drawings, from accessible ceiling space to each outlet indicated.

Provide and install required conduit wire, pullboxes, and accessory items to
accomplish the work involved in providing the new network service as shown on
the Drawings. All boxes, raceways, equipment, etc. shall be bonded in accordance
with NEC.

Coordinate service work with the Owner.

COMMUNICATIONS

WOODARD & CURRAN 27 00 00-6

Page Image
Finance Committee - Agenda - 11/15/2017 - P353

Finance Committee - Agenda - 11/15/2017 - P354

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
354
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

E.

Terminate all cables at the origination and outlet end of all cables. Tag all cables
at the terminal block end to designate the locations of the outlets. All cables shall
be bundled neatly, tie-wrapped and dressed appropriately.

Obtain all permits, pay all fees and provide all materials and labor necessary for
interfacing with utility equipment to install data or internet service.

Furnish and install all conduit, boxes, outlets and low voltage wire and accessory
items necessary to accomplish the work detailed herein or in the Drawings.

Concealed wiring in dry locations above ceilings, except as specifically noted may
be run without conduit. Wiring in all other locations shall be installed in approved
raceways.

1. In ceiling return air plenums, use Teflon air Plenum type cable, unless
used inside conduit or tubing sleeve.

2. Provide bushing at each end of conduit run.

3. Cable shall be installed as tight to roof deck as possible, parallel and
perpendicular to beams, joists, etc.; if run perpendicular beams, joists, etc.,
provide necessary hardware for proper support.

4. Cables shall be properly secured in place. Support cables above accessible
ceiling, using spring metal clips or approved cable ties to support cables
from structure.

5. Do not support from ceiling suspension system. Do not rest cables on
ceiling panels. Do not drape over ductwork or between bar joists.

6. Wiring shall not be run diagonally wherever possible and shall be cabled
neatly.

In areas above suspended ceilings where cables are run without conduit, supports
shall be provided at intervals not to exceed 5 feet and shall be independently
attached to building structure.

Maintain clearances between cables and all other systems as recommended by the
cable manufacturer and system certifying entity. All cables shall be installed so as
to not violate the manufacturer’s recommended bending radius and maximum
pulling tension.

No cables shall be spliced, except those specifically indicated at the backboard.

Provide labeling in accordance with EJA TIA/EIA-606-A. Handwritten labeling
is unacceptable.

COMMUNICATIONS

WOODARD & CURRAN 27 00 00-7

Page Image
Finance Committee - Agenda - 11/15/2017 - P354

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1064
  • Page 1065
  • Page 1066
  • Page 1067
  • Current page 1068
  • Page 1069
  • Page 1070
  • Page 1071
  • Page 1072
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact