Finance Committee - Agenda - 11/15/2017 - P355

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
355
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

L. Cables shall be labeled using color labels on both ends with identifiers in
accordance with EIA TIA/EIA-606-A.

6.02 TERMINATIONS
A. Data Riser: Terminate fiber strands using the appropriate ST/SC connectors.

B. Ground patch panels via a bond connection to the appropriate communications
grounding busbar.

6.03 LABELING REQUIREMENTS

C. Number both ends of each cable with labels of waterproof materials and indelible
ink text information, using either mechanical or waterproof adhesive attachment.

6.04 GROUNDING REQUIREMENTS

A. Wherever necessary extend service equipment ground using min. #6 AWG
copper. In exposed locations, install ground wire in EMT. Bond all
communications raceway to form a continuous path to ground.

B. Ground patch panels, equipment racks and other communications’ equipment via
a min. #6 AWG bond connection to the appropriate grounding busbar.

C. Provide appropriate grounding for the protection of personnel, materials and
equipment conforming to all applicable regulations, codes and standards.

6.05 TESTING

A. Perform final verification tests after the complete cabling and connectors are
installed.

B. All cabling and outlets shall be tested for certification with an approved industry
scanner.

C. Verify that all test equipment is within the required calibration intervals. Owner

and Engineer shall be informed prior to all tests delineated in this procedure and
witnessing tests as they see fit.

D. All defects found during inspections shall be recorded. If cable systems do not
meet the requirements, it shall be removed and replaced with new cable.

E. All testing shall be documented, indicating cable designations and test results, all
cables performing inadequately shall be replaced. All test reports shall be
submitted to the Owner and Engineer.

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-8

Page Image
Finance Committee - Agenda - 11/15/2017 - P355

Finance Committee - Agenda - 11/15/2017 - P356

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
356
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

6.06 FIELD QUALITY CONTROL

A. Provide in accordance with Division 01 General Requirements.
6.07 STARTUP & COMMISSIONING

A. Provide in accordance with Division 01 General Requirements.
6.08 CLOSEOUT ACTIVITIES

A. Provide in accordance with Division 01 General Requirements.

END OF SECTION

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-9

Page Image
Finance Committee - Agenda - 11/15/2017 - P356

Finance Committee - Agenda - 11/15/2017 - P357

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
357
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

COMMUNICATIONS
WOODARD & CURRAN 27 00 00-10

Page Image
Finance Committee - Agenda - 11/15/2017 - P357

Finance Committee - Agenda - 4/6/2022 - P230

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
230
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

C. Payment Becomes Due

1. Not more than 30 days after presentation of the application for payment to OWNER with ENGINEER’s
recommendation, the amount recommended will become due, and when due will be paid by OWNER to
CONTRACTOR.

D. Reduction in Payment.
1. OWNER may refuse to make payment of the full amount recommended by ENGINEER because:

a. Claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the
Work;

b. Liens have been filed in connection with the Work, except where CONTRACTOR has delivered a specific
Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens;

c. There are other items entitling OWNER to a set-off against the amount recommended; or

d. OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14.02.B.5.a
through 14.02.B.5.c or paragraph 15.02.A.

2. If OWNER refuses to make payment of the full amount recommended by ENGINEER, OWNER must give
CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and
promptly pay CONTRACTOR any amount remaining after deduction of the amount so withheld. OWNER shall
promptly pay CONTRACTOR the amount so withheld, or any adjustment thereto agreed to by OWNER and
CONTRACTOR, when CONTRACTOR corrects to OWNER's satisfaction the reasons for such action.

3. If it is subsequently determined that OWNER's refusal of payment was not justified, the amount wrongfully
withheld shall be treated as an amount due as determined by paragraph 14.02.C.1.

14.03 CONTRACTOR’S Warranty of Title

A. CONTRACTOR warrants and guarantees that title to all Work, materials, and equipment covered by any Application
for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free
and clear of all Liens.

14.04 Substantial Completion

A. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and
ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR
as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Promptly thereafter, OWNER,
CONTRACTOR, and ENGINEER shall make an inspection of the Work to determine the status of completion. _ If
ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the
reasons therefore. If ENGINEER considers the Work substantially complete, ENGINEER will prepare and deliver to
OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall
be attached to the certificate a tentative list of items to be completed or corrected before final payment. OWNER shall
have seven days after receipt of the tentative certificate during which to make written objection to ENGINEER as to any
provisions of the certificate or attached list. If, after considering such objections, ENGINEER concludes that the Work is
not substantially complete, ENGINEER will within 14 days after submission of the tentative certificate to OWNER notify
CONTRACTOR in writing, stating the reasons therefore. If after consideration of OWNER's objections, ENGINEER
considers the Work substantially complete, ENGINEER will within said 14 days execute and deliver to OWNER and
CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed

GC - 49 of 55

Page Image
Finance Committee - Agenda - 4/6/2022 - P230

Finance Committee - Agenda - 11/15/2017 - P358

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
358
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 40 61 01
INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
PART 1 —- GENERAL
1.01 SUMMARY
A. Section Includes

1. Provide equipment, instruments, services, appurtenances, and labor as
specified and in the following associated Specifications and as shown on
the Drawings in accordance with this Section.

2. Work by Engineer

a. PLC Programming

b. OIT Programming

C. HMI Programming

d. Integration of new SCADA system
B. Related Requirements

1. Specification 40 63 43 — Programmable Logic Controllers
2. Specification 40 67 00 — Control System Equipment Panels and Racks
1.02 PRICE AND PAYMENT PROCEDURES
A. Measurement and payment requirements: per Division 01 General Requirements.
1.03 ADMINISTRATIVE REQUIREMENTS

A. Coordination, Sequencing, and Scheduling: per Division 01 General Requirements.

1.04 SUBMITTALS
A. Submit in accordance with Division 01 General Requirements.

B. Prior to submittal to the Engineer, Shop Drawings and submittal information will
be thoroughly checked by the Contractor to ensure compliance with Contract
Documents. The Contractor is responsible for verifying that equipment,
instruments, and materials submitted fit within available space and maintain
specified physical clearances, and that equipment is compatible with the operation
of the overall system. Submittal to the Engineer of Shop Drawings and submittal
information certifies that the Contractor has reviewed the information and
requirements have been satisfied.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-1

Page Image
Finance Committee - Agenda - 11/15/2017 - P358

Finance Committee - Agenda - 11/15/2017 - P359

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
359
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

C. Shop Drawings

1. Use Transmittal included in Section 01 11 05. The submittal information
for each section shall be contained in a single submission. Incomplete or
partial submissions are not accepted.

2. Index, including equipment, instruments or materials being submitted,
utilizing identification consistent with Contract Documents (equipment
designation, instrument tag number, control panel name, etc.), as well as
proposed, manufacturer, style, model, and part number.

3. For Programmable Logic Controllers (PLC) and Operator Interface
Terminals (OIT) submittals, refer to Section 40 63 43, Programmable Logic
Controllers, for specific requirements.

4. For SCADA control panel Shop Drawing submittals, refer to Section
40 6700, Control System Equipment Panels and Racks, for specific
requirements.
D. Closeout and Maintenance Material Submittals: per Division 01 General
Requirements.
1. Operations and Maintenance (O&M) Materials
a. Include descriptions of equipment, the nature and intended modes

of operation, testing procedures of units in the system, and safety
measures to be taken in operation. Necessary procedures and
methods for effective operation of the system shall be included.

b. Include Record Drawings and instructions necessary for the planned
maintenance of equipment in the system. The O&M Manuals will
incorporate maintenance procedures and schedules, and they will
coordinate and be cross-referenced to detailed operation procedures
provided by the manufacturers.

C. Organize in three-ring binders, provided with labeled dividers,
including a table of contents clearly describing the information
included and order.

d. Include a list of local service departments of authorized distributors
for equipment, instruments, services, and appurtenances. These
service departments should stock the manufacturer’s standard parts
and equipment; provide local service options, etc.

e. For Programmable Logic Controllers (PLC) and Operator Interface
Terminals (OIT) O&Ms, refer to Section 40 63 43, Programmable
Logic Controllers, for specific requirements.

f. For SCADA control panel O& Ms, refer to Section 40 67 00, Process
Control Panels and Hardware, for specific requirements.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-2

Page Image
Finance Committee - Agenda - 11/15/2017 - P359

Finance Committee - Agenda - 11/15/2017 - P360

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
360
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.05 QUALITY ASSURANCE

A. Provide in accordance with Division 01 General Requirements.
B. Qualifications: per Division 01 General Requirements and as follows:
1. The Contractor must have completed Work of similar or greater complexity

on at least 3 previous projects within the last 5 years. Successful completion
is defined as a finished Project completed on time, without any outstanding
claims or litigation involving the Contractor. Provide, for a period of not
less than 12 months from Final Acceptance of the Project, all labor, tools,
materials, and equipment necessary to address issues or defects in any
system that result from faulty workmanship, installation, equipment,
instruments or materials, and any resulting damage from said defects or
faults, at the convenience of the Owner.

2. The Contractor shall furnish SCADA control panels fabricated per the
Drawings (as shown on the I sheets), by an Underwriters Laboratories (UL)
508A approved panel shop regularly engaged in furnishing, installing and
wiring similar equipment for use in water and wastewater treatment
facilities, and that has been in satisfactory operation for at least 5 years.

C. Instruments, SCADA control panels, and materials provided shall comply with the
Specifications, be supplied from manufacturers regularly engaged in the production
of such products, be standard products wherever possible, and be the
manufacturer’s latest design.

D. Instruments, SCADA control panels, and materials supplied are subject to approval
by the Engineer and demonstrate equal appearance, quality, and performance to
that specified. The Contractor is responsible for verifying the availability of
equipment, instruments and materials proposed for use prior to submission to
Engineer for approval. If production of equipment, instrument, or material is
discontinued, the Contractor will submit an alternate of comparable quality to the
Engineer for approval prior to execution of Work, and at no additional cost to
Owner.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-3

Page Image
Finance Committee - Agenda - 11/15/2017 - P360

Finance Committee - Agenda - 11/15/2017 - P361

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
361
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1.06 DELIVERY, STORAGE, AND HANDLING

A.

B.

Provide in accordance with Division 01 General Requirements.

Coordinate equipment, instrument, and material delivery to coincide with the
Project schedule. If the delivery schedule of any equipment, instrument, or material
affects the overall Project schedule, notify the Engineer in writing immediately.
Include in the written notification, documentation from the equipment Supplier
indicating the revised delivery schedule and reason for the change.

When applicable, coordinate delivery of equipment, instruments, or materials to be
delivered directly to another trade or vendor for installation in a system or control
panel provided under another Specification section.

Exercise care while loading, unloading and transporting equipment, instruments
and materials to avoid damage. Check all equipment, instruments, and materials for
damage or defects within 7 days of delivery to the Project Site.

Equipment, instruments, and materials required to be stored on Site prior to
installation will be stored in such a manner to avoid damage or exposure to water,
dust, or construction debris.

Repair or replace, at no additional cost to the Owner, equipment, instruments and
materials that are defective or damaged during installation, to the satisfaction of the
Engineer.

1.07. SITE CONDITIONS

A.

Existing Conditions: per Division 01 General Requirements.

PART 2— PRODUCTS (NOT USED)

PART 3 — EXECUTION

3.01 GENERAL

A.

Instruments, SCADA control panels, equipment, and other materials provided, that
come with a manufacturer’s warranty, will have the warranty transferred to the
Owner upon final acceptance.

After installation, provided instruments and SCADA control panels will be
powered up, tested, and witnessed by the Engineer for proper termination and
operation.

After installation, the Contractor shall provide a manufacturer’s representative to
calibrate instruments that require calibration, confirm proper installation, and assist
in startup.

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS

WOODARD & CURRAN 40 61 01-4

Page Image
Finance Committee - Agenda - 11/15/2017 - P361

Finance Committee - Agenda - 11/15/2017 - P362

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
362
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

3.02 FIELD QUALITY CONTROL

A. Provide in accordance with Division 01 General Requirements.
3.03 STARTUP & COMMISSIONING

A. Provide in accordance with Division 01 General Requirements.
3.04 CLOSEOUT ACTIVITIES

A. Provide in accordance with Division 01 General Requirements.

END OF SECTION

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-5

Page Image
Finance Committee - Agenda - 11/15/2017 - P362

Finance Committee - Agenda - 11/15/2017 - P363

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
363
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

This page intentionally left blank

INSTRUMENTATION AND CONTROLS GENERAL REQUIREMENTS
WOODARD & CURRAN 40 61 01-6

Page Image
Finance Committee - Agenda - 11/15/2017 - P363

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1065
  • Page 1066
  • Page 1067
  • Page 1068
  • Current page 1069
  • Page 1070
  • Page 1071
  • Page 1072
  • Page 1073
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact