Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 37771 - 37780 of 38765

Finance Committee - Agenda - 5/5/2021 - P42

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

603.249.9300

Nashua Police Station HVAC Upgrade
Nashua , NH
February 25, 2021

Part C: Detailed Cost Proposal

-Demolition

-Masonry

-Misc. Labor / Patching / Temporary Condition
-Misc. Material / Patching Material
-Roofing

-Acoustical Ceilings

-Fire Protection

-Range Ventilation Equipment
-HVAC

-Electrical

-General Conditions

Total

$20,000
$2,400
$66,528
$11,158
$55,130
$102,000
$9,500
$229,185
$2,403,543
$234,000
$480,843

$3,614,287

Page Image
Finance Committee - Agenda - 5/5/2021 - P42

Finance Committee - Agenda - 5/5/2021 - P43

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

turnstone

° corporatio

Acknowledgement is made of receipt of the following bid documents: Invitation for bid, Appendix A (Scope of
Work), Appendix B (Bid Form, Contract Terms, Appendix C (Bid Express Guides)

Turnstone Corporation
“=? (Name oF Yi Lad . /
Pyeann «>
Lhd Header
Sigpigtare)
(/ x

Immigration Reform and Control Act of 1986: The undersigned certifies that it does not and will not during the
performance of this Contract violate the provisions of the Federal Immigration Reform and Control Act of 1986,
which prohibits employment of illegal aliens.

Disqualification of Bidders: By signing this bid or proposal, the undersigned certifies that this
person/firm/corporation is not currently barred from bidding on contracts by any Federal Agency or Agency of the
State of New Hampshire, nor is this person/firm/corporation a part of any firm/corporation that is currently
barred from bidding on contracts by any Federal Agency or Agency of the State of New Hampshire. We have
attached an explanation of any previous debarment(s) and copies of notice(s) of reinstatement(s).

| certify that the firm name given below is the true and complete name of the bidder and that the bidder is legally
qualified and licensed by the State of New Hampshire to perform all work included in the scope of the Contract.

Bidder Turnstone ee Z

Tas ‘of Firm) ‘
tb, 17 L Cz (ALE Lay
Hasan Z
Stacy J. Clatk

(Printed/Typed Name)
February 25,2021
(Date)

47923 NASHUA STREET MILFORD, NH O3055 (603) 249-9300 ~ FAX (G03) 673-6138

WWW. TURNSTONECORP.COM

Page Image
Finance Committee - Agenda - 5/5/2021 - P43

Finance Committee - Agenda - 5/5/2021 - P44

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

SCOPE OF WORK:

Executive Summary
Yeaton Associates, Inc. was engaged by the City of Nashua to develop construction documents
for the proposed HVAC renovation/upgrade at the Police Station including the pistol range. The
goal is to install a cost-effective HVAC system while meeting or exceeding the code and the
Owner's operational requirements of the project.
All new construction elements and systems will conform to the following:

e The New Hampshire State Building Code

e IBC 2015 (International Building Code)

e ECC 2015 (International Energy Conservation Code)

e |MC 2015 (International Mechanical Code)

e IPC 2015 (International Plumbing Code)

e NEC 2017 (National Electrical Code)

e ASHRAE Standards

e Local Authorities Having Jurisdiction (AHJ)

e All Other Applicable Codes, Standards and State Amendments

Mechanical Systems

The existing range air handler shall be removed from the mechanical room and replaced with a
roof top type gas fired variable air volume (VAV) unit with packaged DX cooling on the roof of the
range with side discharge ductwork. The ductwork shall be routed to the end of the building and
brought in either thru the sidewall or down through the last plank of the roof depending on the
structural requirements. The interior ductwork shall be modified as required to convert the
pistol range to a properly operating tactical range.

Any return and supply ductwork to be reused shall be thoroughly cleaned to remove dirt and
debris before restart of the system. Any new ductwork shall be made of galvanized steel and
constructed in accordance with the recommendations of the ASHRAE Guide and SMACNA Guide
(Current Edition). Any flexible ductwork shall be in lengths no greater than 5’-0” and shall not
pass through any fire rated assemblies. Flexible ductwork shall only be allowed in concealed
locations.

The existing R-22 water source heat pumps located in the 1977 portion of the building shall be
removed and replaced with new Variable Refrigerant Flow (VRF) fan coils served by an exterior
air source heat pump with heat recovery (Similar to the Trane Aurora). The new units shall match
the existing unit’s capacity and the existing ductwork shall be modified as required to install the
new heat pump.

The existing dedicated outdoor air handler located in the 1977 mechanical room shall be
removed and replaced with a new outdoor air handler heat pump with gas fired preheat. The
unit shall include an energy recovery ventilator, and variable frequency drives. The unit shall be

0292-021121 HVAC Upgrade
229 Main Street, Nashua, New Hampshire 03061 — Phone (603) 589-3330 — Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/5/2021 - P44

Finance Committee - Agenda - 5/5/2021 - P45

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
45
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

installed onto the roof and shall be re-ducted to the existing outdoor air ductwork and the
existing exhaust ductwork shall be rerouted from the existing exhaust fan to the ERV. The VRF
fan coils shall provide final tempering of the ventilation air and handle the latent loads.

The existing closed-circuit evaporative cooling tower (50-ton) located on the roof of the shooting
range/garage shall be removed including all associated pumps, piping, and valves. The water
source loop shall be removed with only the space heating distribution lines feeding fin tube and
hot water coils to remain.

The existing boiler plant in the 2000 addition shall remain and the circulation pumps shall be
replaced with self-sensing variable frequency drive (VFD) pumps. They shall be set to operate
based on delta-P to reduce building energy usage. The existing boiler plant in the 1977 portion
of the building shall be removed and the boiler returned to the owner for reutilization.

The VAV air handling units serving the 2000 addition shall be removed including their associated
condensing units located on the roof. A new rooftop Dedicated Outdoor Air System (DOAS) shall
be installed on the roof in a location to be determined. The DOAS shall be provided with an
Energy Wheel and an air source heat pump with gas fired preheat. The existing ductwork and
reheat coils shall be removed or reworked as possible to be fed from the new ducted VRF fan
coils. New distribution ductwork shall be provided to serve ventilation air to the return side of
the fan coils for final tempering and dehumidification. The building pressure sensor shall control
the exhaust air damper on the RTU to maintain a building pressure of +0.01” WC to minimize
infiltration of untreated exterior air.

The existing ventilation fan for the garage shall be replaced with new and provided with a control
via CO/NOx control panel and sensors. The exhaust fan shall run at 0.05 CFM/SF during occupied
periods. Upon activation of the CO/NOx sensors, the fans shall ramp up to 0.75 CFM/SF until the
CO/NOx levels are reduced to normal levels. The garage shall be provided with ductless VRF wall
mounted fan coils to provide cooling during the summer and the heat pump shall be located on
the roof of the garage. The existing hydronic unit heaters shall remain, and new thermostats
and control valves shall be provided. The new makeup air unit shall be provided with a face and
bypass damper and served off the existing hydronic hot water system.

Existing hydronic fin tube radiation shall remain for reuse and all thermostats and automatic
control valves shall be replaced. Any existing cabinet unit heaters and unit heaters shall remain,
and any existing control valves and thermostats removed and replaced.

A new DDC BMS shall be provided similar to a Niagara Version 4 system. The new system shall be
provided with a network gateway, remote monitoring, and trending capabilities. The system shall
be open source and allow for modification and extension by third parties. The system shall
control the occupancy schedule and all zone set points. Limited zone control of +/-2°F shall be
provided in the space with a 3-hour reset to default. The new DDC BMS shall integrate the
proposed VRF system controls.

0292-021121 HVAC Upgrade
229 Main Street, Nashua, New Hampshire 03061 — Phone (603) 589-3330 — Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/5/2021 - P45

Finance Committee - Agenda - 5/5/2021 - P46

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
46
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

Electrical Systems

The existing electrical service is 2000 ampere, 277/480V, three phase, four wire main service
that terminates in an (3) section Main Switchboard located in the basement. The switchboard is
a GE Spectra Series and appears to have available physical space for additional of any required
circuit breakers as part of the HVAC upgrade.

The service is fed from a utility pad mounted transformer located at the rear of the building.
Adjacent to the pad mounted transformer is exterior mounted electrical gear and a 250KW
diesel generator. The generator is rated at 376Amps @ 480V, 3P.

The data provide by Eversource notes the existing demand on the facility is approximately
242KW and an equivalent to 291Amps @ 480V, 3P.

Panelboards are installed throughout the facility in various mechanical and utility rooms with
step down transformers. These panelboards may be utilized for the HVAC renovation project
with further review if future space is available. The panels appear to be in good shape and
labeled with directory cards.

The existing addressable fire alarm system is manufactured by FCI (S3 Series). Additional
required equipment and/or Modifications may be supported by the existing Fire Alarm System if
deemed expandable by a licensed fire alarm installer.

Project Timeline:

Anticipated Bid Award Late February 2021
Shop Drawings and Phasing Meetings Until Mid-April 2021
Construction to start Mid-April 2021
Estimated Project Completion Time 12-14 months

0292-021121 HVAC Upgrade
229 Main Street, Nashua, New Hampshire 03061 — Phone (603) 589-3330 — Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/5/2021 - P46

Finance Committee - Agenda - 5/5/2021 - P47

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
47
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (603) 594-3233

April 29, 2021
Memo #21-113

TO: Mayor Donchess
Finance Committee

SUBJECT: Renovation Change Order #1 for the Public Health Building in the amount not to exceed
$150,000 funded from accounts 81200 Buildings & Improvements

Please see attached communications from Tim Cummings, Director of Economic Development, dated April
29, 2021 for project specific details related to this purchase. Below please find a summary of the purchase

approval request:

Item:
Value:

Vendor:

Department:
Source Fund:

Ordinance:

Change Order #1 for the Public Health Building Renovation

$150,000
Original contract approved 12/4/19 under Finance Memo 20-062
Change Value Project Total
Original Contract Value $2,825,625
Change Order #1 $150,000 $2,975,625

Martini & Northern

183 Economic Development

81200 Buildings & Improvements/ Community Health Building Improvement Bond
Fund

Pursuant to NRO § 5-84 Special purchase procedures (A)/10 Commodity items
which are generally available for a publicly advertised price in national or online
sources, and are not customized by the vendor for individual purchasers.

The Economic Development Division, and the Purchasing Department respectfully request your approval

of this contract.

Regards,

Kelly Parkinson

Purchasing Manager

Ce: T Cummings
J Graziano

Page Image
Finance Committee - Agenda - 5/5/2021 - P47

Finance Committee - Agenda - 5/5/2021 - P48

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Fri, 04/30/2021 - 10:18
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/05/2021 - 00:00
Page Number
48
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050520…

B\ THE CITY OF NASHUA “the Cate City"

Office of Economie Development

TO: Jim Donchess, Mayor

FROM: Tim Cummings, Economic Development Director

Date: April 29, 2021

RE: Amendment to Public Health Building Construction Contract of $150,000 for

unanticipated expenses.

In the summer of 2020 the Finance committee approved a contract with Martini Northern in the amount
of $2,825,625 for the renovation of Public Health Building.

I am seeking approval for an additional $150,000 for various cost(s) associated with the project that were
not anticipated, but are necessary to close out the project. This money is available and was part of the
overall project budget through the owner’s contingency, but not included in the original construction
contract figure. The overall project and the bond authorization always conceived of a $3.6M project and
this project should come in under budget and on time.

Itemized Justification

Fires Escape Repair/Recertification $55,000.00
Building Exterior Lights $15,000.00
Landscaping $25,000.00
Pressure Wash the Exterior $ 6,000.00
Security Cameras $ 6,000.00
Signage $ 5,000.00
Sprinkler head/Accent Wall $ 3,000.00
Front Railing/Roof Access $4,000.00
Relocation of Utility Closet $4,000.00
Filter Grills $2,000.00
Fire Escape Site Work $5,000.00
Water Closet Relocation $6,000.00
TOTAL $136,000
Misc. Expenses/Contingency $ 14,000
$150,000

The new project total is $2,975,625. The source of funds will come from $3.6M bond authorization

THANK YOU.

229 Main Street, Suite 234 * Nashua, New Hampshire 03060 « Phone (603) 589-3106

Page Image
Finance Committee - Agenda - 5/5/2021 - P48

Finance Committee - Minutes - 4/21/2021 - P1

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Wed, 04/21/2021 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 04/21/2021 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__042120…

REPORT OF THE FINANCE COMMITTEE

APRIL 21, 2021
A meeting of the Finance Committee was held on Wednesday, April 21, 2021, at 7:00 p.m. via teleconference.

Mayor Jim Donchess, Chairman, presided.

Mayor Donchess

As Chairman of the Finance Committee, | find that due to the State of Emergency declared by the
Governor as a result of the COVID-19 pandemic and in accordance with the Governors Emergency Order
#12 pursuant to Executive Order 2020-04 and subsequent extensions, this public body is authorized to meet
electronically.

Please note that there is no physical location to observe and listen contemporaneously to this meeting, which
was authorized pursuant to the Governor's Emergency Order. However, in accordance with the Emergency
Order, | am confirming that we are:

Providing public access to the meeting by telephone, with additional access possibilities by video or other
electronic means:

To access Zoom, please refer to the agenda or the City’s website for the meeting link.

To join by phone dial: 1-929-205-6099
Meeting ID: 839 4983 7668 Passcode: 999999

The public may also view the meeting via Channel 16.

We previously gave notice to the public of the necessary information for accessing the meeting, through public
postings. Instructions have also been provided on the City of Nashua’s website at www.nashuanh.gov and
publicly noticed at City Hall and Nashua Public Library.

If anyone has a problem accessing the meeting via phone or Channel 16, please call 603-821-2049 and they will
help you connect.

In the event the public is unable to access the meeting via the methods mentioned above, the meeting will be
adjourned and rescheduled. Please note that all votes that are taken during this meeting shall be done by roll
call vote.

Let’s start the meeting by taking a roll call attendance. When each member states their presence, please also
state whether there is anyone in the room with you during this meeting, which is required under the Right-To-
Know Law.

The roll call was taken with 6 members of the Finance Committee present: Alderman Patricia Klee,
Alderwoman Elizabeth Lu, Alderman Linda Harriott-Gathright, Alderman-at-Large Brandon Michael Laws,
Alderman-at-Large Michael B. O’Brien, Sr., and Mayor Jim Donchess

Members not in Attendance: Alderwoman-at-Large Shoshanna Kelly, was recorded absent.

Page Image
Finance Committee - Minutes - 4/21/2021 - P1

Finance Committee - Minutes - 4/21/2021 - P2

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Wed, 04/21/2021 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 04/21/2021 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__042120…

Finance Committee - 04/21/2021

Also in Attendance:

Page 2

John Griffin, CFO/Comptroller

David Fredette, Treasurer/Tax Collector

Kim Kleiner, Administrative Services Director

Kelly Parkinson, Purchasing Manager

Julie Chizmas, Transportation and Long Range Planner
David Boucher, Superintendent Wastewater

Jill Stansfield, Parking Manager

Tim Cummings, Economic Development Director

ROLL CALL

Alderman Klee

| am here, | can hear the proceedings and | am alone in this room at the moment.

Alderwoman Lu

I’m here with my husband and | can hear you fine.

Alderman Harriott-Gathright

And the Clerk is present and | am alone tonight. Alderwoman-at-Large Shoshanna Kelly is out.

Mayor Donchess

She could not make it tonight.

Alderman Harriott-Gathright

Right. Alderman-at-Large Brandon Michael Laws.

Alderman Laws

| am here, | can hear you and! am alone.

Alderman O’Brien

| am present and | can hear the proceedings and | am home alone.

Mayor Donchess

| am present and | am alone in the room.

Alderman Harriott-Gathright

We have six in attendance and a quorum.

PUBLIC COMMENT — None

Page Image
Finance Committee - Minutes - 4/21/2021 - P2

Finance Committee - Minutes - 4/21/2021 - P3

By dnadmin on Mon, 11/07/2022 - 13:43
Document Date
Wed, 04/21/2021 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 04/21/2021 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__042120…

Finance Committee - 04/21/2021 Page 3

COMMUNICATIONS

From: Kelly Parkinson, Purchasing Manager
Re: Millyard Dog Park Feasibility Study in the amount of $49,683 funded from accounts 53142 Consulting Services

MOTION BY ALDERMAN HARRIOTT-GATHRIGHT TO ACCEPT, PLACE ON FILE, AND AWARD THE
CONTRACT FOR THE MILLYARD DOG PARK FEASIBILITY STUDY TO IRONWOOD-HOYLE, TANNER &
ASSOCIATES IN THE AMOUNT OF $49,683 WHICH INCLUDES THE COST OF A PRIVATE UTILITY

LOCATOR. FUNDING WILL BE THROUGH DEPARTMENT: 181 COMMUNITY DEVELOPMENT; FUND:
53142 CONSULTING SERVICES/FY21 ESCROW FUNDS, BY ROLL CALL.

ON THE QUESTION

Mayor Donchess

Now is it Julie or Tim who is here on this?

Julie Chizmas

| am here Mayor.

Mayor Donchess

OK Julie Chizmas, please go ahead.
Ms. Chizmas

Hi, thank you so much for having us on your agenda tonight. | am here to discuss the contract of the Mill Yard
Dog Park feasibility study. | siton the Animal & Dog Park Advisory Committee, Alderwoman Klee also sits on
that Committee, who is here with us this evening. This study is a result of the efforts of that Committee to find
a location to construct and operate a downtown dog park. We have identified a lot, Lot 77-5 and just want to

know if this is feasible from an environmental point of view, an operations point of view, funding point of view.
So that’s why we are here this evening.

Mayor Donchess

Alderwoman Klee?
Alderman Klee

Thank you Mr. Mayor. | do want to add to this, it says it includes the cost of the private utility locator and Ms.
Chizmas if | am wrong on this, please feel free to correct me. But the reason for that was because there is a
large, | don’t want to call it a utility pole, but it is for one of the radio stations. And underneath the ground is a
gridwork of wiring. What this will do is it will tell us exactly where their wiring is so that if we do put up a fence,
we miss all of that. We don’t disconnect them, we don’t put anybody into harm’s way. It will also tell us how
far down that is so that if a dog were to dig, because this grid does go quite a distance out. So all Ms. Chizmas
has done all of her homework incredibly so, as usual, and it is amazing to find out all the different things. But
this is also very — a flood plain area — | think is what it is called. So we are going to check the feasibility as to
whether or not this would be able to be used all year round. Are there going to be certain limitations to it. And
we don’t want to hurt the environment because it does go along the Nashua River there and so on. So that’s
what this feasibility study will do, not just can we put it there and will everybody be happy, but whether or not
the ground can take it, what we would have to do in order to make it feasible or to be able to work and so on.
Do | have that correct, Ms. Chizmas?

Page Image
Finance Committee - Minutes - 4/21/2021 - P3

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3774
  • Page 3775
  • Page 3776
  • Page 3777
  • Current page 3778
  • Page 3779
  • Page 3780
  • Page 3781
  • Page 3782
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact