Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 34711 - 34720 of 38765

Finance Committee - Agenda - 9/16/2020 - P53

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

27 Tanglewood Dr.
Nashua, NH 03062
Office: 603-883-5880
Fax: 603-883-506

Infectious Disease Preparedness and Response Plan for
Jobsites

The following are guidelines for DL King employees in regard to COVID-19 virus protection.

D.L. King shall incorporate COVID-19 transmission and prevention into all job hazard analyses (JHAs) and
pre-task safety planning for all aspects of the work.

Employees shall take steps to protect themselves as per the recommendations in this document.
COVID-19 is spread through:

¢Close personal contact, such as touching or shaking hands, followed by touching the
mouth, nose or eyes

e Airborne respiratory droplets expelled during regular talking and breathing as well
as coughing and sneezing

*Touching a contaminated surface or object, then touching the mouth, nose or eyes

Because of these transmission methods, being in proximity (within but not limited to six feet) to an
infected person can result in transmission. Enclosed spaces (e.g. trailers), confined spaces and any space
with recycled air presents additional exposure risk and should be avoided as much as possible.

Avoid close contact with people who are sick. If you are sick or have close contact with someone who has
COVID-19, notify your supervisor, stay home and call your healthcare provider.

Symptoms of COVID-19 are like the seasonal flu and may include mild to moderate respiratory illness,
fever, cough and shortness of breath. Workers should stay home if they:

«Are experiencing symptoms of COVID-19
Have known exposure to a person with a confirmed case of COVID-19

¢Suspect they may be infected but don’t yet have symptoms (these workers should self-
quarantine and seek testing)

Workers should follow a two-week quarantine after the onset of COVID-19 symptoms to prevent
transmission of the virus to others. To limit the spread of the virus and its impact on daily operations,
D.L. King has made telework an available option for office staff.

Wash your hands frequently with soap and water for at least 20 seconds. Use hand sanitizer with at least
60 percent alcohol when soap and water aren’t available. Always follow good handwashing practices:

«Upon arriving at the jobsite and before going home at the end of the day
*Before and after eating

e After using the toilet

«After touching garbage or other waste materials

Cover your mouth and nose when you cough and sneeze into a tissue if possible or your upper sleeve or

Page Image
Finance Committee - Agenda - 9/16/2020 - P53

Finance Committee - Agenda - 9/16/2020 - P54

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

27 Tanglewood Dr.
Nashua, NH 03062
Office: 603-833-5880
Fax: 603-883-5061

& Associates, Ine.

elbow, not your hands, when tissues aren’t available. Dispose of tissues in the trash after use.
Avoid touching your eyes, nose or mouth as much as possible.

Practice social distancing by limiting person-to-person contact within six feet, especially in large groups or
in enclosed spaces.

Don’t shake hands when greeting others.
Work in occupied areas should be limited to only those tasks that are strictly necessary.
Limit meetings to less than 10 people.
Employees will perform self-wellness checks daily. A thermometer is available for temperature check.
PPE:
¢Consideration should be given to the use of gloves to prevent transfer of the virus.
Eye protection should be worn all times when there is risk of virus transmission into eyes.

¢ Utilize face masks in situations of close social interaction.

Disinfect frequently touched surfaces within the workplace.

Restrict the number of visitors to the job site, including the trailer or office. All visitors should be screened.
If the visitor can answer “yes” to any of the following questions (without identifying which question
applies), the visitor will not be permitted to access the facility.

* Have you been asked to self-quarantine since December 2019?

* Have you been in close contact with any person(s) who has been asked to self-quarantine
since December 2019?

* Have you experienced a recent onset of any illness-related symptoms, such as fever,
cough, or shortness of breath?

¢ Have you traveled outside of North America in the past 14 days?

¢ Have you been in close contact with any person(s) who have traveled outside of North
America in the last 14 days?

* Have you been in close contact with any person(s) who has been diagnosed with COVID-
19?

Any questions should be directed to your supervisor.

Rev. 2020-08-13 PRR

Page Image
Finance Committee - Agenda - 9/16/2020 - P54

Finance Committee - Agenda - 9/16/2020 - P55

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
55
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

Monday. Aust 17, 2529

Nashua City Hall Remodel

22495 Main St «=

Nashua =

NH =

City Hall, Nashua, N, H.

LOCUS MAP

| PROJECT SITE

DRAWING LIST BID SET2 8/17/20
ARCHITECTURAL
MECHANICAL ELECTRICAL
A0 Cover
COVER Mi DMV, TAX HVAC PLANS. tot ELECTRICAL NOTES AND LEGEND
AQOt GENERAL PROJECT NOTES M2 ASSESSING DUCT MODIFICATION E102 SPECIFICATIONS & SCHEDULES.
A002 GENERAL NOTES AND DETAILS | # CITY CLERK DUCT MODIFICATION E103 EQUIPMENT SCHEDULES & NOTES
Assessing Building Plans E201 ASSESSING LIGHTING PLAN
AI01A Assessing Floor Plan 202 MOTOR VEHICLE LIGHTING PLAN
A101B Assessing Demo, RCP and Detail Plan E203 CITY CLERK PLAN
A101C__ Assessing Schedules and details e901 ASSESSING POWER PLAN
Motor Vehicle - Tax Building Plans £302 ASSESSING MECHANICAL POWER PLAN
Al02A Motor Vehicle & Tax Office Plan £303 My. T R PLAN
A102B Motor Vehicle & Tax Office Demo & RCP P.. Eo FIN TAR MEG RAH RGAL: FoaiVER ELAM
i ; £305 CITY CLERK POWER PLAN
A102C__ Motor Vehicle & Tax Schedules and Details e206 CITY CLERK MECHANICAL POWER PLAN
ding Plans:
AI03A City Clerk Plan | e4ot DETAIL PLAN
A103B City Clerk Demo & RCP Plans E501 ONE-LINE POWER RISER DIAGRAM
MIOSE "City Clark Schedule ane Dataies FAIPIO) FIRE ALARM IMPAIRMENT PLAN
ROTUNDA OPENING FAIP102 FIRE ALARM IMPAIRMENT PLAN
Alo4 ROTUNDA DOORWAY FAIP103 FIRE ALARM [MPAIRMENT PLAN
FA201 FIRE ALARMASSESSING
FAZO1 FIRE ALARM WIVE, TAX
FA201 FIRE ALARM CITY CLERK
FA301 FIRE ALARM RISER DIAGRAM
ARCHITECT FIRE PROTECTION STRUCTURAL OWNER Nashue Clty Hal Remodel DENNIS MIRES P.A.

Dennis Mires, FLA, The Architects
6497 Union St Manchester, NH
Tel: (603)625-4545

Fax: (603)625-1067

e-mail upstairseTheArchitects Net

SFG Engineering
131 Rockingham Rd.
Unit 3 East
Windham, NH C3087
(603) 647-8700

City of Nashua

224 Main Street
Nashua, NH OS060
Tel, [603) 589-3000

229 Moin st
Nashua NH

proj na. 2020-044

PLUMBING

MECHANICAL

Design Day Mecharicais, inc.
PO Box 447

New Ipswich, NH 03071
(603) 801-6000

ELECTRICAL

Electrical systems Engineering
22 Manchester Road

Suite B-A

Derry, NH 02038

(603) 810-9004

THE

ARCHITECTS
697 Union Street, Manchester NH
603-625-4548 FAX 603-625-1067

Page Image
Finance Committee - Agenda - 9/16/2020 - P55

Finance Committee - Agenda - 9/16/2020 - P56

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

GENERAL NOTES:

1, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
LABOR, MATERIALS AND EQUIPMENT REQUIRED FOR AND
REASONABLY INCIDENTAL TO THE CONSTRUCTION OF THE
PROJECT.

2 THE CONTRACTOR SHALL REVIEW AND COORDINATE THE
SCHEOULING OF ALL CONSTRUCTION PHASING WITH THE
OWNER.

3. ALL WORK SHALL CONFORM TO ALL LOCAL BUILDING CODES
AND ORDINANCES, AND ALL OTHER AGENCIES HAVING
JURISDICTION. THE RULES AND REGULATIONS OF OSHA SHALL
BE ADHERED TO FOR THIS PROJECT.

4.THE CONTRACTOR SHALL OBTAIN AND PAY ALL FEES FOR
BUILDING DEPARTMENT APPROVALS AND PERMITS,
CONTROLLED INSPECTIONS, OTHER AGENCY APPROVALS AND
PERMITS WHERE REQUIRED, AND FINAL INSPECTION SIGN-OFFS.
FOR PROJECT COMPLETION. COPIES OF ALL INSPECTION
REPORTS TO BE FORWARDED TO THE OWNER AND ARCHITECT.

5. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK,
USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,
TECHNIQUES, SEQUENCES AND PROCEOURES, AND FOR THE
COORDINATION OF ALL PORTIONS OF WORK.

6. THE CONTRACTOR SHALL DO ALL CUTTING, FITTING AND
PATCHING THAT MAY BE REQUIRED TO MAKE THE VARIOUS
PARTS OF THE WORK READY TO RECEIVE OR BE RECEIVED BY
THE WORK OF OTHERS OR OUTSIDE VENDORS AS SHOWN UPON
REASONABLY IMPLIED BY THE DRAWINGS,

7. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS,
MAINTAIN AND PAY ALL COSTS FOR TEMPORARY WATER AND
PLUMBING, POWER AND LIGHTING AND HEATING OR
VENTILATION AS HE MAY REQUIRE TO PROPERLY CONDUCT THE
WORK OF THE CONTRACT. ALL HOISTING CHARGES, IF ANY,
SHALL BE INCLUDED IN HIS BID,

8, THE CONTRACTOR SHALL THOROUGHLY VERIFY ALL
DIMENSIONS PRIOR TO THE BID SUBMISSION. TO THE EXTENT
PRACTICABLE, HE SHALL ALSO VERIFY FIELD CONDITIONS AT
THE SITE. ANY AND ALL DISCREPANCIES SHALL BE REPORTED TO
THE OWNER PRIOR TO HIS BID SUBMISSION, OTHERWISE THE
CONTRACTOR SHALL BEAR ALL COSTS TO COMPLETE THE WORK
AS INTENDED ON THE CONTRACT DOCUMENTS,

9. NOT USED

10, THE CONTRACTOR SHALL PATCH TO MATCH OR AS
OTHERWISE DIRECTED, ALL AREAS WHICH ARE AFFECTED BY
THE DEMOLITION ANDIOR NEW CONSTRUCTION.

41, THE CONTRACTOR SHALL BE RESPONSIBLE, AT HIS OWN
COSTS, FOR WAREHOUSING OF ALL MATERIALS TO BE
INSTALLED UNDER THIS CONTRACT. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR RECEIVING, PROTECTING OWNER
FURNISHED ITEMS.

12. THE CONTRACTOR SHALL PROTECT THE BUILDING PREMISES
AND ALL OCCUPANTS ON THE PROJECT SITE, THE CONTRACTOR
SHALL PROVIDE AND MAINTAIN ALL NECESSARY COVERINGS,
BOARDS, TEMPORARY PARTITIONS AND DOORS AS REQUIRED TO
PROTECT THE EXISTING WORK AND FINISHES TO REMAIN AT THE
JOB SITE AND ALL AREAS OF THE BUILDING AFFECTED BY
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL DAMAGES CAUSED BY IMPROPER PROTECTION AND
SHALL MAKE ALL NECESSARY REPLACEMENTS OR REPAIRS
WITHOUT ANY ADDITIONAL CHARGE TO THE OWNER OR THE
PARTY AFFECTED. THE CONTRACTOR SHALL TAKE CARE TO NOT
OVERLOAD THE EXISTING FLOOR SLABS BEYOND THERE DESIGN
CAPACITY WITH MATERIALS.

13, THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK
WHICH HE EXPECTS ADDITIONAL COMPENSATION BEYOND THE
CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION FROM
THE OWNER AND/OR ARCHITECT. FAILURE TO OBTAIN SUCH
AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA
COMPENSATION.

14, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
APPLICABLE MANUFACTURER'S PRODUCTS GUARANTEES ANDI
OR WARRANTIES; AND SHALL SUBMIT COPIES OF EACH TO THE
ARCHITECT PRIOR TG PURCHASE OF MATERIALS AND
INSTALLATION.

15. THE CONTRACTOR SHALL MAINTAIN CONSTRUCTION
PREMISES IN A NEAT AND ORDERLY CONDITION AND SHALL
REMOVE TRASH AND DEBRIS AT THE END OF EACH WORKING
BAY.

46, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT, IN
WRITING, AND RECEIVE APPROVAL BEFORE ORDERING OR
INSTALLING ITEMS OR MATERIALS WHICH ARE PROPOSED
EQUALS. PROPOSED SUBSTITUTIONS SHALL BE SUBMITTED
WITH BID PROPOSAL WITH ADD OR DEDUCT PRICING FROM THE
ITEMS OR SYSTEM SPECIFIED IN THE CONTRACT DOCUMENTS.

17, JUST PRIOR TO THE OWNER'S OCCUPANCY, THE
CONTRACTOR SHALL CLEAN ALL SURFACES OF DUST, DEBRIS,
LOOSE CONSTRUCTION MATERIAL AND EQUIPMENT AND LEAVE
ALL FLOORS VACUUMED CLEAN, REMAINING CONSTRUCTION
MATERIAL AND EQUIPMENT, IF ANY, SHALL BE MOVED AND
TEMPORARILY SECURED IN AN AREA DIRECTED BY THE

18. WINDOWS AND PLUMBING FIXTURES SHALL BE WASHED
JUST PRIOR TO OWNER OCCUPANCY,

19. ALL NEW WORK AND CONSTRUCTION OPERATIONS SHALL
NOT UNDERMINE THE STRUCTURAL INTEGRITY OF THE
BUILDING.

20. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER
ANDIOR ARCHITECT FOR ITEMS FURNISHED AND/OR INSTALLED
BY OTHERS FOR EXACT LOCATIONS AND PROPER FITTING, AND
SCHEDULE THEM FOR WORK.

21. THE CONTRACTOR SHALL SECURE AND LOCK UP THE
OWNER'S PREMISES AT THE END OF EACH WORKING DAY AND
SHALL NOT PERMIT UNAUTHORIZED PERSONNEL TO
CIRCULATE IN THE OWNER'S SPACE.

22, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SAFE
AND UNINTERRUPTED CIRCULATION OF HVAC, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION SYSTEMS IN EXISTING
AREAS NOT AFFECTED BY CONSTRUCTION.

23, THE CONTRACTOR SHALL PATCH ALL HOLES AND CHASES:
BOTH ABOVE AND BELOW THE CEILING CREATED BY THE WORK
OF ALL TI ES, TO MAKE WATERTIGHT AND FIREPROOF,
INSTALLATION, ALTERATION OR REMOVAL OF DUCTS, PIPES,
CONDUITS, CEILINGS, ETC., TO MATCH EXISTING SURFACE.

24. THE CONTRACTOR SHALL PROVIDE APPROVED FIRE RATED
MINERAL WOOL OR APPROVED EQUAL PACKED SOLID AT SPACE
AROUND PIPES, DUCTS, AND CONDUITS PENETRATING FIRE
RATED WALLS OR PARTITIONS AND SHALL COMPLY WITH ALL
REGULATIONS AS SET BY APPLICABLE SECTIONS OF THE STATE
BUILDING CODE AND OTHER CODES HAVING JURISDICTION.

25, FIRESTOPPING SHALL BE AS REQUIRED BY APPLICABLE
SECTIONS OF THE STATE BUILDING CODE AND OTHER CODES
HAVING JURISDICTION.

28. ALL INTERIOR FINISHES AND BACKING SHALL COMPLY WITH
APPLICABLE SECTIONS OF THE STATE BUILDING CODE AND
‘OTHER CODES HAVING JURISDICTION,

27. THE CONTRACTOR SHALL PATCH ALL HOLES AND DEFECTS:
IN THE FLOOR AND PROVIDE FLASH PATCHING OF ALL
FLOORING, THE CONTRACTOR SHALL INSPECT THE FLOORS.
WITH THE FLOORING INSTALLER AND SHALL MAKE THE
NECESSARY REPAIRS PRIOR TO THE ACCEPTANCE OF THE
FLOOR SUBSTRATE BY THE FLOORING INSTALLER.

26. THE CONTRACTOR SHALL INSPECT AND MAKE THE
NECESSARY CORRECTIVE MEASURES TO INSURE THAT ALL
PARTITIONS SHALL ALIGN WITHOUT ANY BREAKS BETWEEN
APPROVED BREAK POINTS,

29, THE CONTRACTOR SHALL PROVIDE AND ESTABLISH AN
ELEVATION BENCHMARK AT 0-0" TO BE USED AS A WORK POINT
BY ALL TRADES FOR VERTICAL DIMENSIONS,

30. SUPERVISION BY THE CONTRACTOR:
DURING THE ENTIRE PERIOD OF THE PROGRESS OF THE
WORK, THE CONTRACTOR SHALL BE REPRESENTED AT THE
SITE OF THE WORK BY A QUALIFIED SUPERINTENDENT WHO
SHALL BE EMPOWERED TO ACT ON HIS BEHALF, AND WHO
SHALL BE RESPONSIBLE FOR:

1, ESTABLISHMENT AND MAINTENANCE OF PROPER AND SAFE
WORKING CONDITIONS WITHIN THE STATE OF THE WORK,

2. COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL

LAWS,

3, LAYOUT AND COMPLETE COORDINATION OF ALL ELEMENTS
OF THE WORK INCLUDING MECHANICAL AND ELECTRICAL
COORDINATION,

4, CHECKING OF ALL WORK IN PLACE FOR THE PURPOSE OF
ASCERTAINING ITS COMPLIANCE WITH THE CONTRACT
DOCUMENTS,

5, REMOVAL AND PROPER REPLACEMENT OF ALL INSTALLED
WORK WHICH IS NOT IN COMPLIANCE WITH CONTRACT
DOCUMENTS.

31. SUBMITTALS

A CONTRACTOR SHALL SUBMIT SAMPLES AND SHOP
DRAWINGS TQ THE ARCHITECT FOR REVIEW PRIOR TO
FABRICATION AND INFORM THE ARCHITECT IN WRITING AT THE
TIME OF SUBMISSION OF ANY PROPOSED DEVIATION IN
SUBMITTALS FROM THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS. BY REVIEWING, APPROVING, AND SUBMITTING
SHOP DRAWINGS AND SAMPLES PRIOR TO SUBMISSION TO THE
ARCHITECT, THE CONTRACTOR REPRESENTS THAT HE HAS
DETERMINED AND VERIFIED FIELD MEASUREMENTS, AND THAT
EACH SUBMITTAL HAS BEEN CHECKED AND COORDINATED
WITH THE REQUIREMENTS OF THE CONTRACT.

B. TIMING
1, PRIOR TO COMMENCING THE WORK THE CONTRACTOR:
SHALL PROVIDE THE ARCHITECT WITH A SUBMITTAL SCHEDULE
FOR ALL ITEMS REQUIRED BY THE CONTRACT DOCUMENTS
WHICH IS FULLY COORDINATED WITH THE CONSTRUCTION
SCHEDULE TO INSURE A TIMELY REVIEW PROCESS.

2. MAKE SUBMITTALS FAR ENOUGH IN ADVANCE OF
SCHEDULE DATES FOR INSTALLATION TO PROVIDE TIME
REQUIRED FOR REVIEWS, FOR SECURING NECESSARY
APPROVALS, FOR POSSIBLE REVISIONS AND RESUBMITTALS,
AND FOR PLACING ORDERS AND SECURING DELIVERY.

C, SAMPLES
1, REJECTED SAMPLES SHALL BE RESUBMITTED AS SOON
AS POSSIBLE AND SHALL BE IDENTIFIED AS “RESUBMITTED
SAMPLES",

32, REMOVALS, CLEAN-UP, AND PROTECTION

A. REMOVE ALL WASTES, REFUSE, AND DEBRIS
ACCUMULATING FROM CONSTRUCTION WORK AND LEGALLY
DISPOSE OF INDEPENDENTLY FROM OTHERS IN THE BUILDING.

B. GENERAL CONTRACTOR SHALL ENSURE THAT
CONSTRUCTION PREMISES ARE LEFT IN A GENERALLY CLEAN
CONDITION AT THE END OF EACH WORKING DAY. ONCE
HARDWOOD FLOORING HAS BEEN INSTALLED, ALL FLOORS
WILL BE VACUUMED AND TEMPORARILY PROTECTED AGAINST
DAMAGE DURING MOVE-IN. PROTECTION FOR WALLS,
CORNERS, AND DOOR FRAMES WILL ALSO BE PROVIDED AS
REQUIRED,

C. JUST PRIOR TO OWNER OCCUPANCY, CLEAN ALL
SURFACES, REMOVE TEMPORARY LABELS, STAINS, AND
FOREIGN SUBSTANCES, POLISH TRANSPARENT AND GLOSSY
SURFACES, CLEAN EQUIPMENT AND FIXTURES TO A SANITARY
CONDITION, REPLACE FILTERS OF MECHANICAL EQUIPMENT.
REMAINING CONSTRUCTION MATERIAL AND EQUIPMENT, IF ANY,
SHALL BE MOVEO AND TEMPORARY SECURED IN AN AREA
DIRECTED BY OWNER.

D, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AFTER-
HOURS WORK AS REQUIRED BY THE OWNER- (I.E. EXCESSIVE
NOISE, FUMES, ETC.)

£. CONTRACTOR IS RESPONSIBLE FOR COORDINATING
AVAILABILITY OF PARKING FOR WORKERS WITH THE OWNER.
F. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND
COORDINATING WORK OF SEPARATE CONTRACTS (IE.
ELECTRICAL, PLUMBING/HVAC CONTRACTORS., ETC).

GWB FINISH NOTE:

PROJECT NARRATIVE

Assessing, Motor Vehicle/Tax and City Clerk Divisions

This project reception to-heap up with ADA needs ond the Covid-I? reparation
as uly ane Fiche, how
ward: ks for operations. New mikvark wil be provided for al franraction counters and two new
Hicheneties wil be provided within brealrooms.
The mechanical ductwork will be modified le ecco! new wal locations. Mater Vehicle and lak wi ebareion the evsing ecm eal wep anc teptoce the ok
handles with a VRF system for 3.200s!, Remove the three exiting space oF ‘ond the asociated CCUs Thess will be wilh @ new VRE vnit and seven

Indoor fan nl The
tha steam heat

Ananods pace wil have toma ductwork maved lo. aocornmadate new wall bcotions. The City Clee. yell have a nev VAY box installed and tied to

Bulding elechicol systems upgroder include ements 1h ths ing ermal pave. cin inn poner ull sytem UD tahtng uncrerie: smamgenoy.Bghtng
fing the clerks for

ncn ion ond wearin he el has be pais oie Maal of the fsoring wil be salvaged, but the sou ter he Motor Uoeicle Deis vl be
arnerieed One ek cone a Boe)

HU la nl Sun aiken aud) Mam be piotiee_ AE soni: on tel coi alwonce of sey the mitigate any matarioks that may be found,
Additionally, Iwo new doorways will be Cut though exiting maiony walk Ackihonal strvctual engnesting will be provied a1 needed for these locations The
sequencing of work is very important. Motor Vehicle, Tax andl Awening work can ba slated immadiatel; upon ‘of the contract, whie tha City Clark Office wal be:
remodeled atier the November election reason hai been complaled. All moving Cons of furnilute val be provided by the Cy of Nashua

GENERAL DEMOLITION NOTES

A PROTECT ALL FINISHES ADJACENT TO AREAS OF DEMOLITION AND REPAIRS.

B EACH CONTRACTOR TO CAREFULLY EXAMINE EXISTING CONDITIONS AT THE TIME OF BID. ALL INCIDENTAL DEMOLITION If NOT SHOWN.
C REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR WORK IN THOSE TRADES. THE CONTRACTOR 6 TO
COORDINATE WITH DEMOLITION WORK OF THOSE TRADES.

D DEMOLITION OF WALLS INCLUDES ALL ITEMS ATTACHED TD THE WALL, UNLESS NOTED TO BE SALVAGED. SAW CUT NEW OPENINGS AND
REPAIR EXPOSED ENDS OF WALLS PER MASONRY RESTORATION,

E SALVAGE EXISTING SOLID CORE DOORS, FRAMES TO REMAIN, UNLESS NOTED OTHERWISE.

F PROTECT EXBTING DOORS SCHEDULED TO REMAIN

G REMOVE ALL HEATERS AND PIPING NOT TO BE USED IN NEW MECHANICAL SYSTEM. PREPARE WALLS FOR PATCHING AND PENETRATIONS 10:
BE FILLED.

H ABATE ALL ASBESTOS AND LEAD PAINT THROUGHOUT

| REMOVE ALL WINDOWS AND PREPARE OPENINGS FOR NEW WINDOWS

J SALWAGE ALL ELECTRICAL UNLESS NOTED OTHERWISE ON ELECTRICAL PLANS

K REMOVE ALL CEILINGS IN AREAS OF HEAWY CONSTRUCTION. REFRE TO SCHEDULE FOR OTHER LOCATIONS. SALVAGE 30 TILES FOR USE IN
OTHER LOCATIONS.

L REMOVE ALL FLOORING DOWN TO CONCRETE OR BARE FLOORING TO PREPARE FOR NEW FLOORING. REFRER TO SCHEDULE FOR ALL
LOCATIONS.

CONSTRUCTION NOTES

1, PARTITION LAYOUT TO BE APPROVED BY THE ARCHITECT PRIOR TO COMMENCING CONSTRUCTION,

2. THE CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS FOR APPROVAL BY THE ARCHITECT PRIOR TO THE COMMENCEMENT OF WORK.

3. ALL NEW PARTITIONS SHALL BE PARALLEL OR PERPENDICULAR TO CORE WALLS UNLESS NOTED OTHERWISE.

4, GENERAL CONTRACTOR SHALL PROVIDE ROUGH AND FINAL FLASH PATCH OF THE FLOOR SLAB, FOR A EVEN CARPET AND TILE INSULATION.
5. THE CONTRACTOR IS 19 PROTECT ALL FINISHES THAT ARE EXPOSED THROUGHOUT THE LIFE OF THE CONSTRUCTION,

4. THE G.C, |S TO PATCH PENETRATIONS THRU WALL, FLOOR & CEILING CONSTRUCTION TO MAINTAIN RATINGS AND OR CLASSIFICATIONS.

7. REFER TO PLAN DRAWINGS FOR WALL TYPE KEYS AND WALL TYPE DETAILS.

8, ALL FURNITURE SHOWN ON PLANS 5 CONCEPTUAL ONLY AND Is NOTIN THE CONTRACT FOR CONSTRUCTION, HOWEVER THE GC [5 TO
HANDLE ALL SCHEDULING TO AVIOD ANY DELAYS.

ROOMS SCHEDULED TO RECEIVE A PAINTED FINISH ARE TO BE PREPARED AS REQUIRED TO PROVIDE A LEVEL 4 DRYWALL FINISH. OTHER AREAS ARE TO RECEIVE A LEVEL 4 FINISH UNLESS STATED OTHERWISE

FLOOR PREPERATION NOTE:

GC TO ENSURE PROPER FLOOR PREPAS

FINISH NOTES.

ION IS INCLUDED IN CONTRACT PRICE TO PROVIDE A LEVEL SURFACE THROUGH AREAS RECEIVING NEW FLOOR FINBHES

1, THE CONTRACTOR SHALL INSPECT ALL SURFACES AND PROVIDE ALL PREPARATORY WORK

NECESSARY IN ORDER TO RECEIVE NEW FINISHES.

2. ALL AREAS ARE TO BE FINISHED AS PER FINISH PLANS. GENERAL CONTRACTOR TO REVIEW ANG
COORDINATE INTERIOR FINISHES WITH ARCHITECT PRIOR TO APPLYING NEW FINISHES.

o
OG
2
Es
oe
w 2H x
Sect
EES g
eezs
Offa Zz

ON
Se
2=
BB
Ox
Zz

2

N

°

a

Se

~m

a

o

“w

m7

w

=

ma

INTERIOR FINISH SCHEDULE

3. GYPSUM BOARD CEILINGS. BREAKS AND SOFFITS SHALL BE PAINTED AS SPECIFIED IN FINISH GENERAL NOTES:

LEGEND.

4. SAMPLES; CONTRACTOR SHALL SUBMIT {2) 6°X6" SAMPLES OF ALL PAINT COLORS IN THE SPECIFIED
FINISH TO THE ARCHITECT FOR APPROVAL PRIOR TO PROCEEDING WITH THE FINISH PAINT WORK.
5. ON WALL SURFACES SCHEDULED TO BE PREPARED FOR PAINT. ALL PAINT SHALL BE APPLIED IN
ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION FOR THOSE PARTICULAR SURFACES.
6. THE GENERAL CONTRACTOR IS TO FURNISH ALL FLOORING MATERIALS UNLESS NOTED OR

CONTRACTED OTHERWISE.

7.ALL FLOORING MATERIALS ARE TO BE INSTALLED AS PER MANUFACTURERS REQUIREMENTS.
DONE BY THE GENERAL CONTRACTOR [paint

8. ALL THE REQUIRED FLOOR PREPARATION IS TO BE
INCLUDING ROUGH AND ANISH PATCHING,

ALL BASE TRIM IS TO BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR UNLESS NOTED

OR CONTRACTED OTHERWISE.

10, WHERE CARPETING MEETS RESILIENT TE OR OTHER BASE BUILDING SURFACES (LE. CORRIDOR,
JANITORS CLOSETS, ETC.) THE CONTRACTOR [f 10 PROVIDE AND INSTALL CLEAR ANODIZED
FLOORING DIVIDER [SCHLUTER TRANSITION OR EQUAL) FLUSH WITH HARD SURFACE .
CARPETING OCCURS IN A DOORWAY LOCATE THE SEAM UNDER THE CENTER OF THE DOOR.
11, ALL MATERIALS AND INSTALLATION METHODS SHALL CONFORM TO THE MANUFACTURERS

WRITTEN INSTRUCTIONS,

12. AS APPLICABLE ALL CARPET SEAMS ARE NOT TO OCCUR WITHIN 12° OF CORNERS AND EDGES.
THE GENERAL CONTRACTOR SHALL WAX AND OR SEAL ALL NEW RESILIENT FLOORS UNLESS NOTED

OTHERWISE BY MANUF,

13. ALL CLOSETS ARE TO RECEIVE THE SAME FLOGR AND CEILINGS AS THE ROOMS THEY OPEN INTO.

UNLESS NOTED OTHERWISE WITH PT-1 WALL FINISH,

14, DESK NOTES: COUNTER TO BE 2° PLAM WITH EASED WOOD EDGING. LEGS TO BE SOUID PLAM
PANELS. CONCEALED RAKKS BRACKETS AS NEEDED. 4 DRAWERS: TOP DRAWERS TO BE 3° AND 3
LOWER DRAWERS TO BE OF EQ. HEIGHT. 2 GROMMETS FOR ELECTRICAL CORDS. WHERE INDICATED
ON PLAN: INSTALL SNEEZE GUARD ABOVE DESK (GUARD TO BE 3-6" TALL 9/14 TEMPERED GLASS),
WHERE REQUIRED: INSTALL PRIVACY LEG CLOSURE (TO BE PLAM PANEL), ARCHITECT TO REVIEW ALL

DESK SHOP DRAWINGS

“ALL MATERIALS SPECIFIED ARE "OR APPROVED EQUAL” UNLESS OTHERWISE NOTED.
-PROVIDE TRANSITION STRIPS.AS REQUIRED

LOVIEMITTING MATERIALS:

. SHALL BE LOV/ VOC & MEET MINIMUM REQUIREMENTS OUTLINED BY SCAQMD RULE #1165
“ALL PAINTS & COATINGS SHALL BE LOW VOC & MEET THE MINIMUM REQUIREMENTS OF GREEN SEAL STANOARD GS-11
“ALL WOOD FINISHES SHALL BE LOW VOC & MEET THE MINIMUM REQUIREMENTS OUTLINED BY SCAQMD RULE #1113
-ALL COMPOSITE WODD £ AGRIFIBER PRODUCTS SHALL CONTAIN NO UREA-FORMALDEHYDE RESINS

PA,
crs

‘87 Union Street, Manchester NE

t

ARCHIT

oe

WALLS:

BENJAMIN MOORE OR APPROVED EQUAL PRIME 3 2 FINISH COATS. EGGSHELL FINISH ON
WALLS AND SEMI-GLOSS FINISH ON DOORS, FRAMES, AND TRIM COLORS BY ARCHITECT.

BASE 4° JOHNSONITE 1/8" RUBBER COVE BASE

FLOORS:

WHERE | CARPET TILES: INTERFACE 24424 NYLON TILES (TO MATCH EXISTING)

MARMOLEUN FORBO MARMOLEUM. 2.5MM SHEET FLOORING, 3 COLOR UNIQUE DESIGN BY ARCHITECT
ROLLER SHADES: LEVELOR, INSTALLAT ALL TRANSACTION WINDOWS:
MILLWORK

PLAM-T (UPPERS & FULL HEIGHT) | WILSONART OR APPROVED EQUAL COLOR ANO STYLE BY ARCHITECT,

PLAM-2 (LOWERS & VANITY) WILSONART OR APPROVED EQUAL COLOR ANO STYLE BY ARCHITECT,

GENERAL PROJECT
NOTES

‘SOLID SURFACE: CORIAN OR APPROVED EQUAL. COLOR AND STYLE BY ARCHITECT. COLOR PRICE GROUP 2
APPLIANCES:
‘STAINLESS STEEL FRONTS GENERAL ELECTRIC OR APPROVED EQUAL

fpro|. no. S0a0-048

A001

Page Image
Finance Committee - Agenda - 9/16/2020 - P56

Finance Committee - Agenda - 9/16/2020 - P57

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
57
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

EATEMIOR

EXTERIRE,

200K PVDF ALUMINUM Wit EXTERIGR SET 1° IMEULATED LOWE

TEMPERED GLAZING. Th

SPECICATION
WNT ERIOR

aU" PVDF ALUMINS Wit CENTER SET 14" TEMPERED CLAZRIG, 3 fr
MEDIUM STRE & RAIL Ye § ir BOTTOM RAIL 4 8 127 JHTERMEDUATE Rak
DOORS, PROVIDE FINISH PER SPECIFICATION.

ALURVFULL ALURHALE

onan & GLAZIIG TO MATCH SURROUHI

IGNG STOREFRONT
LANCER MANUF TYPE 1 ST APPLICATION, SATIN CHROME FINISH FOR
HAND-CONTH
ALUMINUM THREB ee MEATHERSTRPP IG. ALL SWEEP STRIP BUTT HINGES. PUSH re

HAROLD PULL MAOUE EXE DEVICE CL

AUTOMATIC DOOR OPERATORS AND ACTUATORS REQUIRED VIMERE NOTED, (fy dena

SERIES,

IRERMALLY BROKEH FRAME,
10 BOTTOM RAB, & 10° MICRMEDATE RAIL DOORS. PROVIDE FISH PER

S*VA0E STLE & RAR Wt

TYPICAL EXTERIOR & INTERIOR STEEL DOOR & FRAME:

SGA. PULL PLUSH PRIMED & PTD, Goo GALVANIZED,
YSULATED TOU. 73 0 EXP.

ANDED POLYSTYRENE,
RISULATED 6 TEMPERED GLAZBIG AT WIS20N PANELS,

46GA. FULL FLUSH PRIMED & PID. GEO GALVANIZED,
VISION PAHELS.

TEMPERED GLAZEUG AT
SEE NOTE RELOGy FOR FRE RESISTIVE GLAZING EV FIRE RATED COENNIGS.

Mo RGF

TYPICAL INTERIOR DOORS & FRAMES:

134" 7.PLY SOUD CORE FLUSH DOH WW HARDADCOWENEER
prgteereD bee Hates penn POP DENSITY.
ye CD OCCHS, MATCHBIG LAMINATED SULES,
ES SAUL CONTA ITO FORMALDESCE,
br} TEMPERED SAFETY GLASS AT VISION PANELS.
AP FRE RESISTIE SAFETY GLASS AT FIRE RATED OPENACS,
RESISTIVE GLASS 10 MEET REQUIREMENTS OF ASTMENS:

SUPERVITE X 4s6050 100 WIRED FIRE PROTECTIVE GLANS OR APPROVED EQUAL

HOCLOAW METAL FRAME: _ EUDED FRAMES AT MASOHETE WALLS

PRIMED COMPRE! SSO ANENORG & 7a BARCWARE REINFORCE MENTE,

aoe
rer

SAR MEA
ung

F TP FRABE

HARDWARE NOTES:

} pe 10 BE 628 BATE CHROMPIM PLAT
CYLINORICAL LOCKSETS TO BE LEVERS ER RAGEAL SERIES STARDARD DUTY

3 LEVER SET FUNCTIONS AS NOTED. 70 BE CONFIRMED MATH GAMER,
4 tevER STYLE TO BE SCLAGE ep Tung OR APPROVED SUBSTITUTE,
5 PROWIDE BM aM

PROVIDE ‘ORALL DOORS, VIAL STOPS WHEREVER POSSE,
: DOME TYPE FLOOR STOPS DF THE PROPER HEIGHT WHERE WALL STOPS:

CANNOT BE utp.
A PUSH PLATES TO SE 4" WMIDEn 16° HIGH PUDH & PLAL PLATES 4 BARS, WES 2100.
Sones.

§, POOR PULLS TO BE 1° DAA STOCK WITH 247" PROVECT Weed d 1.172” CLEAREDICE.
Te PROTECTIVE PLATES: KICK (0°), MOF (39, AND ARMOR (MP) x VAEITH OF COCR
IR BEVELED EDGES WITH MATCHING FASTENERS. PROTECTION

PLATES:
4b CLOSERS TO BE LON AO TOO 1450 SERIES SARCENE aa ava,
12 ALL DOORS TO HAVE AUTOMATIC DOOT OPERATORS SHALL Hat
BUTTON LOCATIONS COUFIRMED BY ARCHITECT face ToielALATION,
EF iee pee tee ES.
See ES eee BY REESE.

SLENCOAS Bt ve

18. DUT DEVICES © MULUIGHS BY FALCON 425 SERIA,

16, TOUCHLESS S\VITGH BY ESSEX HAROLE AMAVE FORALL SELF OPERATED COORT
YATH MORTON AUTOMATES T122-SER ES OPERATOR,

TYPICAL HARDWARE SET SHALL CONSIST OF ALL STARDARD COMPONENTS FOR

THe OPERATIONF UNC NOH SROws EVEN F HOT LISTED HERE TO NOLUDE
FRTE-ANUCKLE, FULL WORTIE, BALL BEARING HINGES BY WES anEeS @

EXTERIOR | POWER OPERATORS & DOOR ACTUATORS. LGM 4607016 SERI

OER NCE a RESURED AT ALL ee GGA Wal ROOM HALES PER

ADA STANDARDG "THIS DOOR TO REMAIN UNLOCKED DURING BUEIESS HOURS:

OBE pootebad ALEXcnOn noene

‘COORGINATE AGTESS CONTRO: VATH GITY OF MASHUA, LOCATIONS 1VITH ACCESS
CONTROL 70 HAVE ELECTR STRINE YT WIRED CONNECTION,

‘CONTRACTOH TO VERIFY DOOR OP Enis AND SLE

Health and security updates
229 Main St
Nashua * NK

Nashua City Hall Remodel

VARIES__.

2-10"

3-10"

®

S SOFFIT ABOVE

GYPSUM WALLBOARD PAINTED ABOVE
COUNTER

1/2" TEMPERED GLASS SETIN CRL BRASS
(BRUSHED SATIN) 1/2” $0 DEGREE OPEN
CLAMP (TYPE £} CRL# RH1412BN - MOUNT
TO WALL.

7 12" ALUMINUM CHANNEL TO RECEIVE
GLASS AT BASE AND WALL (RECESSED)

~~ 3/4" SOLID SURFACE COUNTER TOP ON
3/4" H,D, PARTICLE BOARD WITH
WATERFALL

ee SOLID SURFACE BACKSPLASH

Art
PACE

f

mS STRIP LIGHT UNDER COUNTERS

(INTEGRATE WITH RECESSED LIGHTING
POWER) NOT SHOWN ON ELECTRICAL,
| ~---— BLOCKING AS NEEDED

FULL OVERLAY FLUSH PLASTIC LAMINATE
e ON a" HD. PARTICLE BOARD - TYP.

4/4" GAP WITH ALUMINUM STICKING SET
Jf CK 38"

it

rat

2 TRANSACTION DIVIDER WALL
(macs SCALE LZ 1
2 . 2

=e

“ana WOOD BASE

VARIES.

2-10"

3-10"

XO SOFFIT ABOVE

GYPSUM WALLSOARD PAINTED ABOVE
| COUNTER

/ 1/2" TEMPERED GLASS - EASE EDGE

om 34" SOLID SURFACE COUNTER TOP ON

4" H.D, PARTICLE BOARD WITH
WATERFALL
XC SOLID SURFACE SACKSPLASH

.

}
FULL OVERLAY FLUSH PLASTIC LAMINATE
ON 3/4" 1.0, PARTICLE BOARD - TYP,

192" GAP WITH 12" ALUMINUM STICKING
SET BACK 3/8

1/4" GAP WITH ALUMINUM STICKING SET
BACK 8"

3/4°X4" WOOD BASE (MAPLE-STAINED}

A-y

2 CLEAR PLEXELASS SET ba An,
BRUSHED STAIN ERS M4" HIGH X 1a
SQUARE PRS PARTITION POST — ————-—

yo BAS MAPLE (STAINED) CAP OVER -—-——-——
UPL E MAPLE BOARD i.

9 GYPSUM WALLIOARD ATH METAL __/
Cer.

7 LN" STEEL STEAD YALL —

BID SET2 «8/17/2020

cS

s) 7
‘eam

woe Phodschitetts nel § inlatithoarchdectinet

feta or Buy & MALT Ree

GENERAL NOTES
AND PETARS
feed. reo. SE=DDaF

A002

Page Image
Finance Committee - Agenda - 9/16/2020 - P57

Finance Committee - Agenda - 9/16/2020 - P58

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

u Criet Asien:

zh

2 Floor Plan - Assessing [2,200SF)
NH SCALE Wa wy

“ALL EXT. WINDOWS: APPLY 3a Seotchshiele Safety ond.
Securily Window Fim $70 - 7 mil {0.8mm} Single ply

Ww. bas
SSE MIL Ered aw 18° 0.6, pan. STOO WITH

c DSULAT OR)
= S18" TYPE X GWB ROTH SIDE, TAPED A SCREWED PER UL

LUSTING 4 BET PRACTICE,
+ ACOUETIC INSULATION Mei Re eed on
APPROVED EQUAL. RUN CONTRUOLS REA

cor
ACOOIRC SEALAns oT EkooetR OF OF AND ATALL
SEAMS, EXP. JORITS ANO PENETRARONSE.

EG JONES REQUIRED FOR Arty RUN (HORE. Of VERT)
OVER 30:

Yet PLA (PROTECTION LEVEL 1}

<2 50 MIL Sud x @ 16 0.6. (MIL STUD Wi

ACOUERC INSULATION)

= 1/4" BULLET RESBTANT FIBERGLASS PANEL PROTECTION
PUBLIC SIDE [BRFIO0 BY CR LAURENCE OR

[a ee Eee reese

Tye nrexowsson DE. TAPED & SCREWED PER UL
UTS. a REST PRACTICE.

ACOUERC SHALL BES THERMA-FIBER OF
APPROVED EQUAL. RUN CONTMUQUE NEA
ACQUSTIC SEALANT AT PERIMETE® OF GYP AND AT ALL
SEAMS, EXP. JORTTS AND PENETRATIONS,

JORMS REQUIRED FOR any RUN [HORM OF VERT)

OVER 20

VERIFY in PIELD) FRE SPRRAKLER COVERAGE WHERE
PROVIDED.

SCOPE OF WORK

(ASSESSING OFFICE - LOWER LEVEL (2.20081)
1

DEMOLITION OF SEVERAL WALLS, DODRS, INTERIOR WINDOW.
‘CUT MEW WINDOW AND DOOR LOCATIONS, DEMO EXETING
ACT CHUNG AND LIGHTING, Ari REMOVE ALL WALLPAPER

CONSTRUCT NEW WALLS, PATCH AND PAINT COMPLETE
[CLUDING WAULT)

RECONHGURE DUCTWORK FOR NEW WALL LOCATIONS AND
BALANCE SYSTEM.

PROVIDE NEW LED LIGHTING IN MEW ACT CEUNG THROUGHOUT
BACK OFFICE

ROR POWER DRTRAURON POWER
SUIT TTT SEAERCENECT UGHING, AND

STEM CATA AND SECURIY WIR 10 BE BID
TY CMY OF NATHUA VENOOE ANG INCLUDED I OVERALL CORT

&
SALVAGE FLOORING AND INSTALL ADDIMONAL AS REQUIRED:

FROMM ATTIC STOCE PROVIDED BY OWNER

PROVIDE MEW SERVICE COUNTERS WITH SECURITY GLATEIG
WITHhd A NEW ALUMINUM STOREFRONT SYSTEtd IN THE
cl THE ASSESSING OFFICE

NEW MILLWORK IN SERVICE HIOSK TO PROVIDE PLAM & COUNTER
AND OPEN FACE CABIET FOB TRANEACTION EQUIPMENT AND:
SOUD SURFACE COUNTERS. ON THE PUBLIC SIDE FOR PUBLIC

WALL WINDOWS AND DOORS BETWEEN PUBLIC AMD SIAFF
LOCATIONS 10 BE LEVEL | SECUTITY BULLET RESISIAr UP TO 8.
FEET OFF THE FINISHED FLOOR. CONFERENCE ROOM DOOR TO.
BE 20.MIN. RATED WIRE GLASS ONLY.

RECONFIGURE FIRE SPRIPGLERS IM THE CORRIDOR AS scouneet
TO PROVIDE ADEQUATE COVERAGE. NO SPRDIKL

PRESENT THE ASTESRSG OFICE AND WAL HOT BEREGURED

AS PART OF THE CONTRACT,

PROVIDE SAFETY AMD SECURITY FILM ON ALL EXTERIOR WINDOWS.
PLANS.

AS MOTED ON THE

3 REFER TO PLANE FOR ADDITIONAL WORK

Nashua City Hall Remodel
Health and security updates

229 Main St
Nashua * NH

BID SET2 8/17/2020 |
|

Mdededaea

lt

Page Image
Finance Committee - Agenda - 9/16/2020 - P58

Finance Committee - Agenda - 9/16/2020 - P59

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

REPLACE DOOR LEAF AND FRAME =~

See air

a Enlarged Kiosk
HOTY SCALE: 1/2" = 1-0"

—————

CHLING NOTES

| WHERE DEAMS, PIFES, AND OF OTHER COMSIRUCTION DETALS
PREVENT THE USE OF STAMOARD RECESSED FETURES, STANDARD
SHALLOW RECESSED FICTURES SHALL BE USED. (FDCTURE CUTS TO-
BE APPROVED BY ARCHITECT,

2, THE GC AND ELECTRICAL COMCTRACTORS SHALL CHECK ALL
CERING HEIGHTS AND CELING PLEPIUM COMDMONS FOR
CLEARANCE OF ALL DUCTWORK LIGHTING, AND OTHER
CEILING HEIGHT SHOWN ON CONTRACT DRAWINGS. ANY

BE BROUGHT TO.
ATTENTIGR.

3, SUSPENDED CEILING HEIGHTS SHALL BE SHOWN Ont
ARCHITECTS REFLECTED CERIIG PLAN AND ANY DEVIATION
FROM HEKGHES SHOW WiLL BE LUBMITFED 10 THE ARCHITECT
FOR APPROVAL

4. PRIOR TO CLOSPIG UP Arby CEMRIGS. abiy PLENUM SYSTEMS

PLUMBING, & ELECTRICAL) SHALL BE REPECTED AND

TESTREG. SAN
FROFER THER:
PROPER BSSULATION AND

FUNCTION.

S. ALL HUNG ACOUSTICAL TLE CERINCS SHAUL BE INSTALLED IN
ACCORDANCE WITH AFFUCAME

4 ALL JOINIS IM THE FIELO SHALL BE SQUARE LEVEL ANT
PERFECTLY ALICIED WIM EACH OTHER AMO WEH THE RECESSED
UGHTIG FoaURES.

7. CEWING CONTRACIOR TO COORDINATE ACCESS MLE
PANELS WITH OTHER TRADES,

(8, THE AC-OFPUNERS AND REGITERS PU ALL AREAS SHALL DE SET
IN THE CENTER OF TRES.

9. ALL DRYWALL SOFFITS AMD FASCIAS ARE TO BE BADICATED On|

10. AULLIGHTING, COUING MOUNTED DEVICES. SPREITLER
HEADS, ETC. SHALL BE LOCATED Bt THE CENTER OF CERING TES
11, UNLESS PROTED OTHERWIE, ALL NEW CELINGS TES TO 8E
ARMSTRONG ULTIMA 7 7 WIR 9/14 ARMSTRONG GRID AND
ACCESSORIES

SOUD SURFACE COUNTER
VF.

Nashua * NH

Health and security updates
229 Main St

Nashua City Hall Remodel

BID SET 2 8/17/2020

see Thearchitects.net | Infosthearchitectinet

Page Image
Finance Committee - Agenda - 9/16/2020 - P59

Finance Committee - Agenda - 9/16/2020 - P60

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

Finish Schedule - ASSESSING
Room # [Room Name ‘Area (SF) | Perimeter Hoor Base Walls Ceiling Notes
21|Comdor 505.48 [122-1 ASS ASE AS ASE PAINT TOUCH UP AT RELOCATED DOOR
258 |Chief Assessor 147.69 _ [52-8 1/7 ASE ASE FRESH PAINT ACT
258/Admin 16295 _ [53-3 1/4" CPT TES 1 MATCH EXBTING PID GWE ACT
250|C 128.64 [A7-2 2 CPrTLes | MATCH EXISTING PID GWB ACT 2 FE SOLID COLOR CPT BORDER
26A|Assessors 706.74 [138-11 1/4" AS ASE RESH PAIN AGT
268|Admin 744.80 [141-3 CPTTLES 1 MATCH EXBTING RESH PAIN ACT
274] aul 17495. A ASE RESH PA‘ ASE
278|Vaul 271.40 _|6F'-10 172" A ASS RESH PAIN ASS
32|Conidor 316.36 [130-11 A ASE RESH PAINT ASS
[salons 50.10 [31-10 CPT TILES 1 RUBBER PIG Gwe ASS
328 | Public 124.17 [58-5 3/4 CPTTILES 2 RUBBER, PID GWB ASIS [RE-USE SALVAGED CPT TILES
inferior Door Scheciule - ASSESSING
DOOR Frome | PSF Nominal Leat| Fe Hordware
ID From To Swing | Bevation Material Leaf Ske W xH Resistance HW Closer Set Remarks
Material Rating
| Isc Existing door frame and leaf
258. [Admin = [Admin HM s-0"«7 0" Unrated | O @ |office lo be relocated. Add 24x36"
i WOOD : b
Vision Panel kil
New frame, leaf and side lite.
Isc Fil into existing (2
25C |Coridor |Conference | HM MNoop [Sa xTO" [4S minutes) @ office Side lite)-VIF, Glazing to be:
7 lominated CERAMIC for Level
ion. Badge Access.
. sc rer . ‘i New frame and Leaf. Badge
26A |Coridor |Assessors | \ HM Woop Box?" [4S minutes) 0 & |office ACOs
% sc Existing door frame and leat
268 [Admin |Conference | HM WOOD S-0"*7 "0" Unrated Oo @ Office to be relocated, Add 24°36
s Vision Pearvel kit.
[ | bc New frame and Leaf. 1/2
324 |Klosk Admin | i HM WOOD Fe 7 " 45mintes! O B /|Office Mision panel w/ CERAMIC
glass.
Inferior Storefront Schedule - ASSESSING
leat / Fire
DOOR . . Frame Nominal Leaf ‘ Panic Hercware
From To Swing Hevotion : Panel a Resistance Clorer Remarks
fr) Materiol | Motedal | #4 XH |“ porng | HW Set
; ALUM / Office. [Match exiting corridor storefront in
om) [Bopielbe, juste: | \ H MUM: Joiass | [TS Unvoted | Hold open. |finish, tail sizes and hardware finish.
ane GLASS vs Match existing corridor storefiont in
ane: |PEDES!: || omer J OM TierL. verdad: || © a finith, rail sizes and harcware finish,
GLASS / Match exiting corridor storefront in
$03 “
bie | ini Lele sum ss’ bearer] wore | o | a ek wo ii dtr
ALUM / Office Match existing corridor storefront in
soa fc x
preiten: |Pubs if a ALUM Neeage: | [SETH Herated | | 8 |iokd open.| finish, rail sizes and hareware finish,
sos: troblks: ‘|epeteioe es aru (FASS! | gery uvatea | oO o Match exiting corridet storeftont in
METAL finish, rollsires and hardware finish.
Inferior Window Schedule - ASSESSING
1D Type | Bevation | Nominal x) Nomina Remorks
LEVEL | BULLET RESISTANT
; mnie a GLAZING AND FRAME. BAFFLE
A [Special [| BGs a4 6-8 | winDOW, CLEAR ANODIZED
ALUMINUM FRAME.
LEVEL | BULLET RESISTANT
sae : IGLALING AND FRAME. BAFFLE &
B ishece a eal ae AF [TRANSACTION WINDOW, CLEAR
ANODIZED ALUMINUM FRAME
FIXED WINDOW - LEVEL | BULLET
RESISTANT GLAZING AND FRAME.
w268 |Special Po a 6-8 [20 Min RATED GLASS AND:
FRAME. CLEAR ANODEED
ALUMINUM FRAME
EXTERIOR WINDOWS:

PECIAL WINDOWS:

RECESSED DEAL TRAY

ALL EXT. WINDOWS: APPLY 3M Scotchshield Safely and
Becutity Window Film 570 - 7 mil [0.1Emm} Single ply

BAFFLE TRANSACTION WINDOW TO BE: TOTAL SECURITY SOLUTIONS VERTICAL
BAFFLE INTERIOR TRANSACTION WINDOW WITH COUNTER TOP & 5/5.

FIXED WINDOW: GLAZING TO BE ARMOURED ONE 20 MINUTE IRE RATED-
PART # AOTSGS14FR. FRAME TO BE STEEL KD WITH FIRE STOPS.

FINISH NOTES:
CPT TILES 1: SAME AS EXISTING CARPET TILES IN ADMIN/ASSESSORS. REPLACE AS
NEEDED. INSTALL NEW AS NEEDED
CPT TILES 2: SAME AS EXISTING CARPET TILES IN CORRIDOR. REPLACE AS NEEDED,
INSTALL NEW AS NEEDED

BASE: MATCH EXISTING.

RUBBER: SEE A00] GENERAL NOTES
FRESH PAINT: FRESH COAT OF PAINT (WALL, TRIM, DOOR FRAME AND DOOR LEAF
WHERE APPLICABLE.)

PTD GWE: PRIMED AND 2 COATS
ACT: 24°24" GRID, ARMSTRONG DUNE TEGULAR 9/16, COLOR OF GRID AND
PANELS TO BE WHITE.

KIOSK COUNTER: SOLID SURFACE COUNTER, EASED EDGE

ALUMINUM STOREFRONT SYSTEM :

“KAWNEER 450° OR EQUAL.

2X4 1/2' ANODIZED ALUMINUM W/ FRONT SET

SINGLE PANE TEMPERED GLAZING. OTHER INFILL PANELS: METAL
PANEL [SEE ELEVATION)

3.1/2" MEDIUM STILE & RAIL W/ 6 1/2" BOTTOM RAIL & 8 1/4"
INTERMEDIATE RAIL DOORS.

BRONZE ANODUED FINISH TO MATCH EXISTING CORRIDOR
STOREFRONT FOR S01-S04 AND 25C

CLEAR ANODIZED ALUMINUM FOR W268, W325,

142 3OUD TURFACE ZEPARATOR
/_ BRACKET
‘fa
A have A NEVES
‘ cians eles
Z i
E |__|
‘t
L f 4 Po | i
1 1 1 1
L u u ul
¥
5 CONCEALED RAKKS COUNTER

SUPPORT BRACKET (TYP)

LEVEL 1 BAFRLE
winDOw wr
INTEGRATED SECURED:

LOCKABLE CASH
Drawer

re
Ir

Aen '

i
& soungurrace countie?

(CONCEALED RARKE COUNTER
tomcat |

LEVEL 1 BAFFLE

i
BATEGRATED SECURED ay

ne

rowel

East Kiosk.
SCALE: 1/2"

SOUD SURFACE
‘CounmeRTOr

LEVEL OAPRE

TRANSACTION
ee

INTEGRATED TO.

WIDOW: 5/5
ct RECESSED TRAY
1 IN BASE

Len sYRP ucHT UNCER
COUNTERS (PFTEDRATE
Suabpen vit RECEBSeO LiceTIVG
FowER) HoT sHoWe On
BRACKET ELECTRICAL
cy
2 ntivemcal fies FLOCHNG AS NEEDED
APPLICATION 3 ~~ wari
Pusuc une” |1R3
penciren [ES
COVEBASE—=IES

(6 \_ MILLWORK DETAIL ADA ACCESSIBL
wong SCALE: 3/4" =

ee

West - Public Sicle

io

West: Staff Side

SCALE Wz = 1-0" pene, = Ast
Peter e ‘ eps
PC ——— ee ———
4 ) z
Fa Sher oven
|
fs leven
Es) ——raneas ur ro
E oo
7! nour nave
fi! LEVEL 1 BAFFLE
TRAREACTION
g | yo
: OUD suRFACE BEGRATED TO
ile WINDOW: 5/2
3 RECESSED TRAY
MEALE
ad
cl LED STAI Lear UHOER
iS (MTEGRATE
WATH RECESEED UTS
surPORT BRACKET UBT SOA ON
flesthcat
¥ BLOCKING AS NEEDED
"Von rusuic SIDE

Vien COVE
BASE

ror

SCALE: 3/4"
1

COMPUTER TERMINAL COUNTER

a.
a
O65
EG
oo,
we l2At
SeceZz
S55:
ro g
She
= OOF G
O on =
oo
>=
bo
Cha
Zz

°o

3

a

~~

~

i

co

A

tu

w

a

oO

rani!
an
Uist
HTH HLA

Page Image
Finance Committee - Agenda - 9/16/2020 - P60

Finance Committee - Agenda - 9/16/2020 - P61

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
61
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

SCOPE OF WORK

MOTOR VEHICLE & TAX DIVISION (3, 2005f)
1

DEMOLITION OF SEVERAL WALLS, MLLWORK DOORS, PAEED PLATFORM IN MOTOR VEHICLE. CUT NEW DODR OPENING LOCATIONS,
DEMO EXSTING ACT CBUNG AND UGHTING.

2
COPSTRUCT NEW WALL, PATCH AND PAINT COMPLETE (INCLUDING VAULT)
3

DEMO AIR HANDLERS AND PROVIDE MEW VEF SYSTEM TIED INTO ENSTING DUCTWORT FOR MEW WALLLOCANIONS AND BALANCE =|
SYSTEM

4
PROVIDE NEW LED IGHIING IN NEW ACT CELING THROUGHOUT

UMTING NORMAL DISTRIBUTION, POWER OUTLET SYSTEM, EMERGENCY LIGHTING, AND FIRE DETECTION AND
HONAUNG SYSTEM DMIA AND SECURIT WRING TO BEBID BY CIT OF NASHUA VENDOR AND RELUDED IM OVERALL COST

FLOORING TO REMAIN IN TAX AND FINANCE OFFICES, SALVAGE AS NEED AND INSTALL ADDMIGNAL AS REQUIRED FROM ATTIC STOCK
PROVIDED BY OWNER. ENTIRE MOTOR VEHICLE DIVSION TO RECEIVE NEW CARPET TILES IN OFFICE AREAS AND RESILIENT FLOORING
INI PUBLIC AREA.

229 Main St
Nashua * NH

PROVIDE NEW SGUDSURFACE SERVICE COUNTERS WITH SECURITY BAMTLESTYLE GLAZING AND HPL WAREIGOT HALF WALLHPL AMO |
TEMPERED GLASS DIVIDERS TO SEPARATE THE SERVICE COUNTERS WINDOWS. PROVIDE ROWER SHADES ON ALL SERVICE COUNTER |
WinDOws.

Health and security updates

NEW MILLWORK IM OFFICES TO RE PLAM COUNTERS WITH WOOO EDGES AND OPEN FACE HPL CABINET FOR TRANSACTION
EQUIPMENT.

Nashua City Hall Remodel

(UL, WINDOWS AND DOORS BETWEEN PUBLIC AND STAFF LOCATIONS TO BE LEVEL 1 SECUTITY BULLET RESETANT UP 106 FEET OFF
Te PsHED ROOR

RECONMOURE ARE SPRIUELERS AL REQUIRED TO PROVIDE COVERAGE

PROVIDE 3-0" CLEAR PLEXIGLASS DIVIDERS ON S DESKS IM THE TAX OFRICE TO REPLACE TO THE EXRTING DIVIDERS

PROVIDE NEW CABINETS AND SINE IN BREAK ROOM
&

PROVIDE LARGER OPENING BETWEEN LOBBY 146 AND 124, SALVAGE ALL EXITING MARBLE AND RECONFIGURE TO RETAIN EXITS:
, Herone LOOK PLAN TO BE PROVIDED.

"BROWNE WALL HUNG SARITEERS AE NOTED ON PLANS

PROVIDE NEW ROLLER SHADES ON ENSTING DERIOR WIDOWS
Ie
REFER TO PLANS FOR ADDITONAL WORK

BID SET2 8/17/2020

AUR
| 13

Louny
6

earey

PA,
crs

ARCHIT
(87 Union Street, Manchester NH

1

ween Thedrchitects.net | inlogthearchitect:net

ATM
MAM TOP £ BASE 2 z.
: T
MEW DOOR AT =
{ DENS 3 a 7 c 5 g =
re TA | “tbat “pat
ce C | i Cy
rae BI Sate me : i
Sh EI { | i
a ge Wa i
a DN »
\
ax 4 hemes | ! |
ia T
| ‘ = ALIGN FOR NEW
. 4 -0F TALL WALL —" a OCR WALL
Eosiric Ramune 10 FECENE ‘win or P ne
' af PLEMGLARE PANELE TO PLENIGLASS ~ : aS Or AU BS
gt {Ih TEFLAGE Ban IDOE (5 ABOVE Ws ONIDERS cor
| —~ Tow!) ser WRLWALL eave (PLAN TOF &
x - DAZE) TOTAL k,
i | MANAGER wi 2 wine 2 lp
|] Fe reas et
1 ALOVE - AM: by
1 | % Ean ia ne
|

hy
a
r

sf

ALL BxT, WINDOWS) PROVIDE NEW ROLLER SHADES FOR THE DIVEION

(Floor Plan - MOTOR VEHICLE / TAX (3,200SF)
eeey SCALE 1) we

Page Image
Finance Committee - Agenda - 9/16/2020 - P61

Finance Committee - Agenda - 9/16/2020 - P62

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
62
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

229 Main St
Nashua » NH

Nashua City Hall Remodel
Health and security updates

Floor Plan - Assessing
SCALE: 1 = 10

"| Floor Plan - Assessing

er

|— DEMO WALL FOR NEW PrENIVG:

|
s

BIDSET2 8/17/2020

@
bese

fn is
9 ar + are,

_ Demo Plan - Motor Vehicle & Tax

\ A
? SCALE 1/8" = 1-0" 5 Hoor Plan = Assessing
———_— 1028" SCALE 10

PREVENT THE LSE OF STANDARD RECESSED FICIURES, STANDARD
SHALLOW RECESSED FIXTUPES SHALL BE USED: (FDCTURE CUTE TO
BE APPROWED BY ABCHITECT)
2-THE GC AND ELECTRICAL CONCTRACTORS SHALL CHECK ALL
BRING PLEAUM CONOHTIONS FOR

CLEARANCE GF ALL DUCTWORF. LICHTING, AND OTHER

FUNG HEIGHT SHOWN ON CONTRACT DRAWINGS. ANY
DECREPAHCIES SHALL BE BROUGHT TO THE ARCHITECTS
ATTENTION

CENLING NOTES
1, WHORE BEAMS, PIPES, AND OR OTHER CONSTRUCTION DETAILS as
=
ae

3. TURPENDED CEILING HEIGHTS SHALL BE SHOWH ON
ARCHIECTS REMLECTED COMING FLAN AND ANY DEVIATION
FROM HEIGHTS SHOWN WILL BE SUBMITTED 10 THE ARCHITECT

L
4. PRIOR 13 CLOSBIG UP ANY CERINOS, ANY PLENUM SYSTEMS
ANG

Sr (HVAC. PLUMBING. £ ELECTRICAL) SHALL BE INSPECTED
WHERE REQUIRE BY CONTRACTORS,

a.
PROPER AUIMORTIES HAVING JUREDICTION TO INOURE THEN
PROPER INSULATION AND FUN!

t : THE ELD SHALL BE SQUARE. LEVEL AND
ot PERFECT AUCHED Wit EACH OTHER AND WIM THe RECESSED

Tt a | I, 7 UGHTING FIXTURES. fae |ossarpnes jews
T +4 | = - 7. CEILING COMIRACTOR TO COORDMATE ACCESS LES
| IL eo ° at I u | PANELS WITH OTHER TRADES

|e he? fi ie rH Nee] | 8. THE AC-DIFFUSERS ANO REGISTERS IN ALL AREAS SHALL BE SET

oo zl 2 |
sa! po! Ls aa Tes.
Sy J | en’ f = ‘\ oe CI FALL DRYWALL SOFFITS ARKO FASCIAS ARE 1O BE MDICATED Ort
if Fil ANS

= 4 Y + 1D. ALL LIGHTING, COhivG MOUNTED DEVICES, SPAmIELER,
HEADS. FIC, SHALL BE LOCATED Bi THE CENTER OF Cetuines TES

V1 UNLESS NOTED OTMERWIBE, ALL NEW CEBINGS TILES 10 BE

ARMSTRONG ULTIMA 2° 2 WHIM 9/16 ARMATEONG GRID AND

]
so

°
a

(2.\_RCP~- Motor Vehicle & Tax
Scail we

———S—

Page Image
Finance Committee - Agenda - 9/16/2020 - P62

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3468
  • Page 3469
  • Page 3470
  • Page 3471
  • Current page 3472
  • Page 3473
  • Page 3474
  • Page 3475
  • Page 3476
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact