Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 11121 - 11130 of 38765

Board Of Aldermen - Agenda - 3/9/2021 - P36

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
36
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C
REQUESTED RECOMMENDS

A-2 Communications Public Safety Portable Radio
Replacement $ 3,500,000 $ 3,500,000

The Fire and Police portable radio equipment will become obsolete as of December 31, 2021. All non-public safety
portable radios are currently obsolete. These radios will need to be replaced. Fire and Police have requested
additional software be installed in these radios to enhance the safety of Police Officers and Firefighters.

A-2 School District Running Track Replacement
NHS — South $ 400,000 $ 400,000

The Running track was installed circa 2004 during the South High School Renovation. The rubberized surface has
been patched every year starting in 2015. A consultant reviewed the track condition this past year and
recommended complete replacement of the rubber surface, with a replacement of the asphalt base a possibility
based on further tests. NHIAA will likely not allow interscholastic track events to be held on the track in its current
condition.

A-2 Police Department Security Fence, Gates and
Security System Upgrades $ 87,858 $ 87,858

This will replace the rusted out fence around the Nashua Police Department with a new fence. Replacing two
existing gates with power operated safety gates and key card access point system Add security cameras to monitor
the new gates. This project was previously requested, and meets the definition of a capital improvement in that it’s a
rehabilitation of an existing facility and the estimated cost is in excess of $50,000, with an anticipated life expectancy
in excess of 10 years.

A-2 Economic East Hollis Street & Bridge St
Development Intersection Improvements $ 183,050 $ 183,050

This request will provide matching funds for a federally funded project improve the intersection of East Hollis and
Bridge Street, which serves as a vital link to the City's downtown core and is a major east/west commuter route. This
project will improve traffic flow, increase access to new housing and the future rail station, provide bicycle and
pedestrian accommodations, and enhance the gateway into the City. The first $3,661,000 does not require a local
match and is funded by NHDOT monies. Should costs exceed that amount by an additional 25%, then the City will be
required to provide 20% match (up to $183,050).

15

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P36

Board Of Aldermen - Agenda - 3/9/2021 - P37

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
37
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C
REQUESTED RECOMMENDS

A-3 Library HVAC Renovation $ 365,000 $ 365,000

In 2015 the Library hired Peregrine Energy Group to evaluate the system. They found 2 of the air handlers are at the
end of their service life and all 3 of the condensers at or near the end of their service life. (In fact one of the
condensers failed in 2018 and was replaced) They have recommended complete replacement of many components
along with the reconditioning of others and the installation of 12 additional VAV dampers at a total cost of
approximately $400,000. Not only will the renovation of our HVAC system save on repair bills it will vastly increase
the efficiency of the system resulting in significant energy savings and increased comfort for staff and customers.
Due to the age of the original report and estimated cost increases the budget has increased by 5%.

A-3 Library Brick Repointing $ 275,000 $ 275,000

There are 24 alcoves on the top story of the library that extend out past the main structure that require repointing and
cleaning of the brick. The deterioration of the mortar is causing water infiltration in a number of areas whenever it
rains, causing the interior paint to blister, puddles to form on the rubber floor and soaking the carpeting.

Division of

A-3 Public Works Overhead Doors
(Street Department) $ 169,000 $ 169,000

The Street Department facility is in need of new overhead doors as the condition of the doors has degraded and
requires constant repairs due to the age of them. Many doors have been impacted by the weather and have rusted
out panels with holes in the doors. The doors are over twenty years old and have constant repairs made to the
motors and the track system. These doors are a vital part of the facility.

Division of City Wide Park and Playground
A-3 Public Works Improvements
(Park and Rec) $ 200,000 $ 200,000

Parks and playgrounds city wide are in need of improvements. Among those requiring immediate attention is the
playground located off Harris Rd behind the Dube ballfield it has not been replaced in over 30 years. Replacement of
swings, slides and other equipment repair to the basketball court are needed. Improvements of lighting, fencing,
signage and pruning of and removing some trees and general repairs and upgrades to the surrounding area are also
needed.

16

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P37

Board Of Aldermen - Agenda - 3/9/2021 - P38

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
38
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS
Division of
A-3 Public Works Pool Repairs & Upgrades
(Park and Rec) $ 65,000 $ 65,000

City pools are in constant need of repairs and upgrades to maintain quality, facilities for the residents of Nashua. An
immediate need is the replacement of the Rotary Pool filter to ensure the facility is working for the coming season.

Dehumidification System

A-3 School District Charlotte, Fairgrounds, &
Ledge St Elementary Schools $ 460,000 $ 460,000

These three schools underwent renovations to the mechanical & Electrical systems between 2011 and 2013. Due to
funding short falls the rear classroom wings did not receive the dehumidification systems installed in the other school
classrooms. This provides an inequitable atmosphere for students and staff in those rear wings.

Community Heritage Trail East
A-3 Development Access to Commuter Rail
Division Station $ 68,307 $ 68,307

This request is to increase the matching funds for the construction of an off street pedestrian/bicycle path between
Main Street and the proposed Commuter Rail Station at 25 Crown St. Similar to the existing Heritage Trail west of
Main St., connecting also to future re-development east of downtown including Renaissance Development. The
request is for $68,307 in addition to the existing matching funds as the project costs have risen based on final
engineering and additional funds are expected from the CMAQ fund in the amount of $273,230 to cover construction
costs. As a federal grant this project requires a minimum of 80% federal and 20% city matching funds.

Community Lock Street and Whitney Street
A-3 Development Sidewalk Improvements
Division and Bike Lanes $ 217,052 $ 217,052

This project will repair/improve sidewalks and add bike lanes on Lock and Whitney Streets, located in a walking
school neighborhood. Sidewalks will be widened to accommodate wheelchairs, strollers, and sidewalk plows. A
federal grant has been awarded and City funds would provide the 20% match. The City has appropriated $45,584 of
the $217, 051.87 funds need for the match of the $1.1 million dollar grant. These improvements are included in the
2000 Master Plan and meet definition #6, of the definition of a capital improvement.

Division of Traffic Communication
A-3 Public Works & Detection Upgrades
(Streets) $ 145,000 $ 145,000

Without constant communications at all of the traffic control cabinets, the clocks in the cabinets wander. The
installation of fiber optic cable or wireless communications connected to these cabinets allows the clocks to be the
same in real time. This supports good traffic coordination and traffic flow on the street. It also allows the traffic
technicians, traffic foreman and traffic signal contractors to access and make changes on the street from the office,
rather than in the field.

17

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P38

Board Of Aldermen - Agenda - 3/9/2021 - P39

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
39
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS

Division of Mine Falls Park

A-3 Public Works Artificial Fields
(Park and Rec) $ 770,000 $ 770,000

The need for more rectangular fields is very evident by the amount of play the existing fields received and the
number of requests that are received for fields. The conversion of 1-2 fields at Mine Falls Park to an artificial surface
with lights would create better playing conditions; reduce the need for fertilization, painting and mowing. This would
also create more available playing time for residents

TOTAL FY 2022 SHORT-TERM "A" PROJECTS: $8,337,711 $8,337,711

18

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P39

Board Of Aldermen - Agenda - 3/9/2021 - P40

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

vf B"

B = Desirable (second priority)! Programs/Projects which benefit the community whose validity of planning and timing have
been established.

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C
REQUESTED RECOMMENDS
Community
B-1 Development Railroad Square CMAQ
Division Project $ 299,999 $ 299,999

The purpose of this project is to improve circulation around Railroad Square and at the Main St/Canal St/Franklin St
intersection to accommodate increased traffic converging from Franklin St and Canal St on to the Main St.
intersection. The improvements also include upgrades to pedestrian and bicycle infrastructure to improve safety.
The total project cost is $1,499,999, with the City 20% match of $299,999.

Division of Truck Wash Bay

B-1 Public Works
(Street Department) $ 1,080,000 $ 1,080,000

The construction of the truck and chassis wash bay will extend the life of the city vehicles. Currently we have a
pressure washer that does not remove the salt residue from the undercarriage of the vehicles. A thorough wash after
working in winter conditions will help to ensure the fleet is maintained at a higher level and will last much longer.

B-1 Fire Department Priority One — Fire/IT Facilities
Safety and Security Video $ 80,000 $ 80,000

Adding Video Security to all 7 facilities to assist in the safety of all personnel and City property 24/7

B-1 Police Department Parking Lot Repaving $ 338,169 $ 338,169

Project to include remove the existing pavement, grade and compact the existing underlying material. Install a 2”
binder course and 1 %” top course and adding one or two catch basins with 300 feet of pipe, granite curbing to be
reset and parking lines to be installed. The current parking has exceeded the anticipated life expectancy; the life
expectancy of the new paving is in excess of 10 years.

19

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P40

Board Of Aldermen - Agenda - 3/9/2021 - P41

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
41
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS
Division of
B-1 Public Works Replacing Mechanic Pits
(Street Department) Purchase of Portable Lifts $ 200,000 $ 200,000

The existing truck pits in the fleet area are a hazard and it has been recommended they be filled in. This will create a
much safer working environment. The existing pits will be filled and portable lifts will be purchased as replacement

Division of
B-1 Public Works Labine Park at
(Park and Rec) Fairgrounds Rehab $ 125,000 $ 125,000

This facility is in much need of renovation and repair. There is currently a plan to rebuild the restrooms. The softball
fence is old and rusted. The turf has an uneven playing surface. This would be a worthwhile project for rehab due to
the proximity of the schools and the Rotary Pool. The ice skating area is in need of grading and new hockey boards
and it would benefit from a roof to create a pavilion. The ice skating area is in need of grading and new hockey
boards. This complex is used by the Elm Street Junior High Girls’ softball team and the adult leagues.

B-2 Fire Department Priority One — Fire/IT Gamewell
& Fiber Optic Infrastructure $ 97,000 $ 97,000

Nashua Fire Rescue and City of Nashua IT Dept. are requesting an upgrade to the Gamewell and Fiber Optic
Infrastructure throughout the City.

Division of
B-2 Public Works Holman Stadium
(Park and Rec) Infrastructure Improvements $ 155,000 $ 155,000

The Holman Stadium Facility continues to be a gathering point for City sporting and civic events. There are some
areas that need attention that were not addressed in the stadium work that occurred in 2003. There is a need to
upgrade the locker rooms with better floor surfacing, improved shower and bathroom services and more efficient
HVAC systems. The field is in need of having the clay surface replaced and have upgrades made to the irrigation
system. There is a need to repair failing roofs and walls, replace and reconstruct portions of the upper wooden
outfield walls. There is a need to pave areas inside the stadium and parking lot to eliminate trip and fall hazards.
Replace out buildings; upgrade electrical and security systems. The field requires some rehab and the marque sign
on Amherst St.

20

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P41

Board Of Aldermen - Agenda - 3/9/2021 - P42

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS
Division of
B-2 Public Works Greeley Park
(Park and Rec) Facility Rehab $ 260,000 $ 260,000

The infrastructure of Greeley Park is in need of attention, road paving is needed on the park roads, signage needs
replacing, parking improvements are needed, fencing needs to be replaced, stage improvements are needed and
repairs/improvements to the Stone House are required. The need to look at better lighting and security including
additional cameras is very evident.

Division of
B-3 Public Works Ledge Street at
(Engineering) Nashua Canal EDC-5 $ 75,000 $ 75,000

Along Ledge Street between Stevens Ave. and Patten Ct., a chain link fence is the only protection between traveling
vehicles and the canal. This request is to replace the existing chain link fence with a crash rated barrier to improve
vehicle safety while maintaining proper pedestrian access. On October 11, 2009, a vehicle crashed into the fence
and landed in the water of the canal highlighting the need for the improvements.

B-3 Library Plaza Renovations $ 1,000,000 $ 1,000,000

The Library and Community Development Division worked with CRGJ Landscape Architects and team to create
plans and bid documents for the renovation of the plaza between the Library and 14 Court St. This renovation will
correct a variety of problems including lighting, access to power, irrigation on the plaza and correcting non-ADA
compliant slopes. The renovations will also improve the connections between the downtown area and the riverfront.

Division of

B-3 Public Works Traffic Signal Upgrades
(Engineering) $ 50,000 $ 50,000

The City has over 90 signalized intersections, each with electronic equipment requiring periodic replacement. It’s
important to replace traffic signal controllers, network switches, and other hardware every 10 to 20 years to ensure
system integrity/function. About ten years ago the City completed a major project to upgrade our coordinated signal
system. Capital investment is needed to protect that previous investment.

21

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P42

Board Of Aldermen - Agenda - 3/9/2021 - P43

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS
Division of
B-3 Public Works City Wide Ball Field
(Park and Rec) Improvements $ 100,000 $ 100,000

The Softball, Baseball, and rectangular fields are all in need of improvements based on current usage. These
improvements would include fencing, infields, dugouts, scoreboards, and lighting, sod and drainage improvements.

TOTAL FY 2022 SHORT-TERM "B" PROJECTS: $ 3,860,168 $ 3,860,168

22

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P43

Board Of Aldermen - Agenda - 3/9/2021 - P44

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
44
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

“Cc”

C= Acceptable (third priority): Programs/Projects which are adequately planned, but can be postponed if budget cuts are
required.

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C
REQUESTED RECOMMENDS
Division of Jeff Morin Fields
C-1 Public Works at Roby Park
(Park and Rec) Ice Rink Roof $ 40,000 $ 40,000

The ice rink at the park is very popular. Having a roof over the rink would accomplish three things. The quality of the
ice would improve by keeping the sun and winter elements off of it. The winter ice skating season would be extended
again by keeping the sun off the rink. The roof would also provide a covered space creating a pavilion which
residents could reserve for functions in the park such as family reunions, birthdays and other events.

Priority Two -Station 1 Kitchen
C-1 Fire Department Renovations Architectural $ 30,000 $ 30,000

The last renovation was conducted over 20 years ago and this Station is in need of updating the kitchen and paint
the first and second floors. Improvements needed include, new cabinets, sink, dishwasher, flooring, lighting,
suspended ceiling and ventilation improvements. This request if for Architectural review cost for this year and next
year 2023, for construction cost.

Police
C-2 Department Locker Room Project $ 102,483 $ 102,483

This project will replace all of the existing original lockers in the male and female patrol locker rooms. These lockers
are 39 years old and 37 of them are no longer working due to old worn out parts, due to damage and faulty hinges.
88 shed hasps were added to secure the inoperable lockers.

Police NPD Building Renovations
C-2 Department and Addition $ 12,258,649 $ 12,258,649

This project is needed to update the aging building and better accommodate the growing NPD workforce. The
detention area and evidence lab area need a complete remodel to be up to standards with current trends in law
enforcement and to bring the department up to date in these areas. The project meets the definition of a capital
improvement in that it’s a rehabilitation of an existing facility and the estimated cost is in excess of $50,000 with an
anticipated life expectancy in excess of 10 years.

23

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P44

Board Of Aldermen - Agenda - 3/9/2021 - P45

By dnadmin on Mon, 11/07/2022 - 06:59
Document Date
Fri, 03/05/2021 - 15:10
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 03/09/2021 - 00:00
Page Number
45
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__030920…

PRIORITY DEPARTMENTS PROJECTS DEPARTMENT C.1.C

REQUESTED RECOMMENDS
Division of
C-3 Public Works Water Park Development
(Parks & Rec) at Rotary Pool $ 300,000 $ 300,000

The development of a Splash Pad/Water Park would provide summer activity for many children of the City. The idea
would be to build this water park next to Rotary pool. Building at this location would allow the water park to utilize the
sanitation system already in place at the pool, the restrooms that already exist, and the supervision (lifeguards).
Taking advantage of the existing infrastructure would make the project affordable and would provide a high level of
service to the community.

Community
C-3 Development Heritage Trail East
Division Beautification $ 550,000 $ 550,000

This request is to fund the landscaping, pocket parks, garden areas and general improvements to compliment the
pedestrian/bike path between Main St. and 25 Crown St Commuter Rail Station. After completed final engineering
and due to significant increases in project costs since 2018 when the grant was applied for the full budget (and
additional requested budget) will be consumed by the basic trail construction, including removal of contaminated
soils. The funding is required to complete the project as designed and meet the neighborhoods project goals.

TOTAL FY 2022 SHORT-TERM "C" PROJECTS: $13,281,132 $13,281,132

24

Page Image
Board Of Aldermen - Agenda - 3/9/2021 - P45

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1109
  • Page 1110
  • Page 1111
  • Page 1112
  • Current page 1113
  • Page 1114
  • Page 1115
  • Page 1116
  • Page 1117
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact