Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Minutes - 4/26/2021 - P21

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P21

Resolution R-21-128

REQUEST TOISSUE BONDS NOT TO EXCEED ONE MILLION
FIVE HUNDREDAND FIFTY THOUSAND DOLLARS ($1,550,000).

THE PROCEEDS OF SAID BONDS SHALL BE USED IN ADDITION
TO THE $2,800,000 PREVIOUSLY APPROPRIATED UNDER
RESOLUTION R-19-127 APPROVED ONAPRIL 30, 2019 TO PAY
COSTS OF THE POLICE DEPARTMENT'S HEATING,
VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEM,
WINDOW IMPROVEMENTS AND LOCKER AREA IMPROVEMENT
PROJECTS.

THE USEFULLIFE OF THE IMPROVEMENTS IS TWENTY YEARS

Board Of Aldermen - Minutes - 4/26/2021 - P20

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P20

Brick ,Main Sewer

| Sul GF Cristrsnlen — 188
. fae Je.
Beach St

Exit Matias St
aed ied ht dll a
a 6 sor
‘ | ; asf A
'y TEs 7 { Jha) Mains Server Jar 10 fe; dracntothsenie
: | ry! : = ( of Pratnut Jd, euble hicdmoss tir =|
| \ a 306. 7 azp Wer ule S A areas

; | Ground, 22 hejunction of Wilder Se vikeey

‘i Meles Sa 4 5 Sian the Ee and Hotlss St Senevs pry

: WT # There wasan 8° Pitre fiadin Man Sewed ease 4 »
No Sewer on Het Hettir SE Rabin

Board Of Aldermen - Minutes - 4/26/2021 - P19

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P19

Annual Sewer Infrastructure Improvements

Year Replacement FT Lining FT cclV oy
2009 3,225

2011 2,980 757

2012 2,047 1,237

2013 2,965 600

2014 2,673 836

2015 1,270 270

2016 2,035 224

2017 805 1,094

2018 615 14,221

2019 4,947 27,918 43,032
2020 2,912 55,663 31,290
2021 1,000 30,000 50,000

Main St at Mulberry St — replacing 1869 concrete
sewer with PVC pipe and new structure

Board Of Aldermen - Minutes - 4/26/2021 - P18

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P18

Sewer Infrastructure Budget History

Year Millions
FY 2011 $1.26
FY 2012 $2.00
FY 2013 $1.26
FY 2014 $1.32
FY 2015 $1.39
FY 2016 $1.46
FY 2017 $3.10
FY 2018 $3.00
FY 2019 $5.00
FY 2020 $5.15
FY 2021 $5.41

Ne Koy ee Ck

Gillis St

Board Of Aldermen - Minutes - 4/26/2021 - P17

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P17

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
Point repair

Cure-in-Place Pipe (CIPP) Lining

° Epoxy lining

¢ Replacement

a oii Ww
| es
ey a Ae Wr
| ~ | aa
ree ge ¥
x iasem .
Uy ? t = = — an —
o — 7 ;
‘ / : Oy
metre. ee
me A ve Cera ies
\

Chase Street — built 1885

(12” concrete) Sewer replaced in 2018

Sewer
replaced
2018

Charles Street — Built 1886 ( 12”

concrete) - collapse a

Board Of Aldermen - Minutes - 4/26/2021 - P16

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P16

CITY OF NASHUA, NH PERHAM ST
[rh a Te

mem 0024.6 F 03.3D

b>

Persistent roots entire length
Perham Street —built 1893 (15” clay)

Blockage and collapse Collapse and top fracture
Main Street —built 1869 (15” concrete)

Board Of Aldermen - Minutes - 4/26/2021 - P15

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P15

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
¢ Point repair

¢ Cure-in-Place Pipe (CIPP) Lining

° Epoxy Lining

Hinged fractures at top of pipe Post-lining

Gilman Street — 20 inch clay built 1910

Board Of Aldermen - Minutes - 4/26/2021 - P14

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P14

Annual Sewer Infrastructure Improvements

Rehabilitation of Pipe and Structures
¢ Point repair

Ash St - built 1889 (12” concrete) -crown fractures Ash St — built 1915 (12” clay) - collapse
and collapse

Board Of Aldermen - Minutes - 4/26/2021 - P13

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P13

Annual Sewer Infrastructure Improvements

Assessment of Pipe and Structure Condition

¢ Identify pipe to assess — Prioritized by age,
material, and critically of location

¢ Cleaning of pipe

¢ Closed Circuit Television (CCTV) inspection

¢ Review video and determine if and what
rehabilitation is required

oy TTS TAMH 7
Downstream MH No ee Rye ee

ee Tie Ee as =

Material: ry A cg
TCL ey

Fifield St — built 1919 (12” clay) — alignment offset Myrtle St — built 1879 (24” brick)

Board Of Aldermen - Minutes - 4/26/2021 - P12

By dnadmin on Mon, 11/07/2022 - 07:04
  • Read more about Board Of Aldermen - Minutes - 4/26/2021 - P12

Collection System by the Numbers

¢ 1860's - first sewers installed
¢ 1869 - 32 by 40 inch brick sewer constructed under Main Street to Nashua River

¢ 1885 — 40 by 54 inch brick sewer constructed under East Hollis Street to Merrimack River
¢ 6 to 108 inches — diameter of sewers

¢ 3 to 31 feet - depth of sewers TT 2.
¢ 31.6 miles of pipe over 100 years old ptpine ben aR

e 4.4 miles of brick sewers Sree 2
¢ 74.5 miles of asbestos cement pipe Direction:JU
¢ 37.9 miles of sewers under arterial roads

C1

Pagination

  • Previous page ‹‹
  • Page 583
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact