ENERGY EFFICIENT INVESTMENTS INC.

| oI

Introduction

This Measurement and Verification Plan has been prepared as a guide in determining the energy savings as a

result of the installed Energy Conservation Measures. In this document, EEI will show the baseline
calculations used to determine cost savings and how we can evaluate the installed measures to ensure the
Savings Guarantee is being satisfied.

Board Of Aldermen - Agenda - 10/6/2020 - P57

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P57

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Table of Contents

Board Of Aldermen - Agenda - 10/6/2020 - P56

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P56

IKE]

ENERGY EFFICIENT INVESTMENTS ING.

Energy Efficient Investments, Inc.

Measurement and Verification
Annual Report
Period: 2016-2018 Baseline

For:

Nashua, NH School District

Prepared by:
EE], Inc.
Energy Advisors Group
Steve Tarantino, LEED AP O+M, EIT

Prepared on:

01/27/20

Board Of Aldermen - Agenda - 10/6/2020 - P55

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P55

Attachment 4 - Measurement and Verification Plan

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Board Of Aldermen - Agenda - 10/6/2020 - P54

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P54

Attachment 3 - Project Cost

eR rita

Nashua North High School

Cost for Installed
Measure $

Pele er Mad
E

Pree B Corea

Annual Electric
Savings (kWh)

Annual Natural CO? Emmisions

Gas Savings
(Therm)

Reduction
facie)

PT emarsha tts la 4

Board Of Aldermen - Agenda - 10/6/2020 - P53

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P53

Attachment 2 - Maintenance and Service Agreements

To ensure the guarantee School District must maintain equipment as required by
Operational and Maintenance Manuals / Manufacturer Recommendations of all
equipment provided under this contract.

Board Of Aldermen - Agenda - 10/6/2020 - P52

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P52

measure would include checking the air flow at the diffusers to ensure that it meets
current code required flow.

ECM 9- Kitchen Hood

The existing kitchen exhaust systemhas a basic on/off operation. This results in the system
operating during times when it doesn’t need to be operating and conditioned air is
exhausted. This measure is for installing a Captive Aire unit with VFD drives on make-up air
and exhaust fans. A temperature sensor will be installed in the duct work and control
operation based on the temperature inside the duct.

Board Of Aldermen - Agenda - 10/6/2020 - P51

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P51

for commercial and industrial transformers supplying linear loads in the 30-150 kVA
range is 95%, as compared to 98% for a high efficiency model. Further, conventional
transformer losses, which are non-linear, increase by 2.7 times when _ feeding
computer loads.

EEI recommends the replacement of existing inefficient transformers in order to improve
the energy efficiency ofthe electricaldistribution systems through the replacement
of the transformers with new high efficiency units. The scope of work for this measure
would include:

Board Of Aldermen - Agenda - 10/6/2020 - P50

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P50

Scope of Work:

Install (3,860) LED 2x4 and 2x4 retrofit fixtures with Spacewise control and wireless
dimming capability

Install (260) LED high bay fixtures with Spacewise control and wireless dimming capability
Install (642) LED recessed can fixtures

Install (2,947) LED tubes and (1,644) LED drivers

Install (193) LED lamps

Install (47) LED round decorative fixtures

ECM 2 —- Controls Upgrade

EEI proposes installing a complete DDC system as an extension of the existing N4
Enterprise Supervisor.

Scope of work:

Board Of Aldermen - Agenda - 10/6/2020 - P49

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P49

Nashua South High School

ECM 1 - LED Lighting

The schools currently utilize a combination of T8 and T5 fluorescent lighting. EEI proposes
replacing the existing fixtures with new LED lighting. EEI performed a detailed survey of the
interior and exterior spaces in order to identify opportunities in which we can improve
lighting quality, reduce maintenance costs, and save energy.

Pagination

  • Previous page ‹‹
  • Page 1119
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact