Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 10/6/2020 - P68

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P68

| oI

ENERGY EFFICIENT INVESTMENTS INC.

heat output adds to the building cooling load.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include:

30 Transformers

(6) 15 kVA
(2) 45 kVA
(2) 75kVA
(8) 112.5 kVA
(3) 150 kVA
(5) 220 kVA
(1) 225 kVA
(2) 300 kVA
(1) 400 kVA

Board Of Aldermen - Agenda - 10/6/2020 - P67

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P67

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 2- Controls Upgrade

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Board Of Aldermen - Agenda - 10/6/2020 - P66

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P66

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua South High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Board Of Aldermen - Agenda - 10/6/2020 - P65

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P65

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 10- Walk In Coolers

Board Of Aldermen - Agenda - 10/6/2020 - P64

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P64

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 6-—- Mini Splits
EEI proposes removing the (19) existing Mitsubishi ductless splits.

Board Of Aldermen - Agenda - 10/6/2020 - P63

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P63

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include upgrading:

32 Transformers

(5) ISKVA
(4) 30 kVA
(2) 45 kVA
(1) 75 kVA
(6) 112.5 kVA
(1) 145kVA
(1) 150kVA
(1) 175 kVA
(3) 220 kVA
(4) 225 kVA
(2) 300 kVA
(2) 500 kVA

Board Of Aldermen - Agenda - 10/6/2020 - P62

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P62

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Board Of Aldermen - Agenda - 10/6/2020 - P61

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P61

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua North High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Board Of Aldermen - Agenda - 10/6/2020 - P60

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P60

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM: Nashua South High School

M&V Option Used

1. LED Lighting Option A
2. Controls Upgrade Option C
3. Weatherization Option C
4, Transformers Option B
5, Retro-Commissioning Option C
6. Mini Splits Option B
7, Condensing Hot Water Option A
8. Targeted Balancing Option A
9. Kitchen Hood Option B
10, Walk In Coolers Option B

Board Of Aldermen - Agenda - 10/6/2020 - P59

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P59

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Project Overview

1, PROJECT SUMMARY

The goal of this project is to achieve energy savings through upgrades to the buildings’
electrical, plumbing, mechanical, and building envelope. This project will result in improved
building performance, thereby reducing energy and maintenance costs.

School Address SF
Nashua North High School 8 Titan Way 420,000
Nashua South High School 36 Riverside St. 430,000

2. M&V OPTION SUMMARY

Pagination

  • Previous page ‹‹
  • Page 1118
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact