ECM 7 — Condensing Hot Water

The current water heating units are standard efficiency. This measure would be to
replace the current system with high efficiency condensing Lochinvar units Armor Floor
Mounted units with 98% efficiency. The units have a 5:1 turndown with stainless steel
heat exchanger. Scope to include new ASME storage tanks, expansion tanks, and
circulation pumps.

ECM 8 - Targeted Balancing

Board Of Aldermen - Agenda - 10/6/2020 - P47

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P47

Scope of work:

Inspect exterior doors for deficiencies to the weather stripping and door sweeps. Install
new weather stripping and door sweeps as needed.

ECM 4 - Transformers

Board Of Aldermen - Agenda - 10/6/2020 - P46

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P46

Assumptions:
o Net Annual Interior LED Lighting kWh Savings = 820,956 kWh

o % of time HVAC Systemis Heating = 3000 hours / 8760 hours = 35%
o % of time HVAC Systemis Cooling = 3000 hours / 8760 hours = 35%
o Heating SystemEfficiency = 80%
o Cooling System Efficiency = .7 kW/ton
o Utility Rate per Therm = $1.00/therm
o Utility Rate per kWh = $.15/kWh

Scope of Work:

Install (2,953) LED 2x4 and 2x4 retrofit fixtures with Spacewise control and wireless
dimming capability

Board Of Aldermen - Agenda - 10/6/2020 - P45

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P45

Energy Conservation Measures

In this section of the document we will define the Energy Conservation Measures we have
evaluated for this project. Then we will define the measures on a building by building basis.
Careful consideration was given to each measure and its interaction withthe overall building
performance.

General ECM Descriptions
Nashua North High School

ECM 1 - LED Lighting

Board Of Aldermen - Agenda - 10/6/2020 - P44

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P44

Economic Analysis

Board Of Aldermen - Agenda - 10/6/2020 - P43

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P43

Utility Analysis

Board Of Aldermen - Agenda - 10/6/2020 - P42

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P42

ECM Matrix

ECM Matrix

Upgrade

ransformers

Commissioning

Hot Water
argeted Balancing
Hood
In Coolers
otal NNHS

Upgrade

ransformers

Commissioning

Hot Water

argeted Balancing

Hood
In Coolers
otal NSHS

Cost for Installed Energy Savings potential Rebates “wal Hectric
‘ a a La)

i Teteei tp -mey

Al?
$1,077,300
$50,000.
$577,371.
$262, 080.
700.
$165,000.
$75,000.
000.
$35,000.
$3690,868.

Board Of Aldermen - Agenda - 10/6/2020 - P41

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P41

Executive Summary

EEI is located in Merrimack, NH, and has a proven track record of designing and
implementing energy improvements to mechanical systems, building controls systems,
insulation, and renewable systems. EEI is also an approved energy management contractor
with, Eversource, Liberty Utilities, and Unitilin New Hampshire.

EEI has developed a plan which could reduce annual energy expenditures in the
district by more than $466,719.70

Board Of Aldermen - Agenda - 10/6/2020 - P40

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P40

Table of Contents

Executive SUM MALY vaccceseeeeeceseeeeeeeeseeeeeeueeaseeeueeeeeseueeeeeseuaeeausauaeeansanas

ECM Matrix wiccccccceeccceceeeceeeeeeeeeeenaeeeeeaeeeesaeeuneeneueuaneeueeaeeueeeeeeugeeeeueeaneegs

3
4
Utility AM@lySIS .....cccccseeceeeseecseeeseeceeaeaeueeeasaeaeeeagueeeesuaueeeuauaueeseanaeaeaesnsD
ECONOMIC ANALYSIS .icccccceceseceeeeeeeeeeeseeeaeeeeuaeaeaeeuaeaeaueeauaeaeaeanaeaeanaeersnssO

7

Energy Conservation Measures DEPP

Board Of Aldermen - Agenda - 10/6/2020 - P39

By dnadmin on Sun, 11/06/2022 - 22:58
  • Read more about Board Of Aldermen - Agenda - 10/6/2020 - P39

(C ENE/EE|

uu |

i |
| meas»

ENE Systems, Inc./Energy Efficient Investments, Inc.
Investment Grade Audit

FOR:

Nashua School District

Prepared by:

Michael Davey, CEM

Date: December 05, 2019

BEE] SENE

ENERGY EFFICIENT INVESTMENTS INC. EFFICIENT INVESTMENTS INC.

w /)

REDUCING THE OPERATING AND ENERGY COSTS OF YOUR FACILITY