Board Of Aldermen - Agenda - 8/11/2020 - P59
Exhibit “F”
CONTRACTOR’S CONTINGENCY
E
re:
Exhibit “F”
CONTRACTOR’S CONTINGENCY
E
re:
7/30/2020
EXHIBIT wee
Project Name: NASHUA PUBLIC HEALTH - FINAL GMP
Estimate #: 4110
Bid Date: 7/28/2020
ESTIMATE SUMMARY
GMP
SCOPE OF WORK SUBTOTAL
YFLCV Ed EEUPR ED Chiugo cm
“TU/TT/s an
Ge A CELOU NL
soeawcnmnsenuaanvssssor
UsFLTor Ri EERE hed whewgo Cm
OZ/TE/ZT NUL
T2/S/T aN
O¢/TE/CT NUL
O2/TE/2T NUL
0Z/EZ/ZT PAM
OZ/vT/ZT UO
0Z/9T/ZT PAM
02/6/ZT POM
02/9T/ZT PAM
02/Z/ZE PAM
O2/ST/eT ant
02/9T/TT UO
OZ/9t/TE uo
02/9T/TE OW
02z/6/TT wow
02/6/TT UOW
Oz/Z/TT uOW
02/6T/OT UO)
02/6T/OT OW
02/9Z/0T Uo
02/6T/OT UO
0Z/6T/OT USN
02/2/ot Hs
02/8T/6 Hs
12/8/e uo
ef
i
SSUES BS
ra)
b/6
‘e
i
‘
Excludes:
Exhibit "C" July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
Removal of existing riser system, including backflow preventer, dry pipe valve, air
compressor, fire department connection, and main drain
Excludes:
centering sprinkler heads on ceiling tiles. Existing are not centered now.
DIVISION 22 (PLUMBING):
DIVISION 23 (HVAC):
DIVISION 26 (ELECTRICAL):
includes:
Area of refuge system, which was previously an alternate
DIVISION 28 (SAFETY AND SECURITY}:
Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
DIVISION 8 (DOORS, FRAMES & HARDWARE):
Includes: 27 new Hollow metals frames
Incluces: 12 new steel doors
Includes: 56 new wood doors
DIVISION 8 (GLASS & GLAZING):
Includes: 3 new bullet resistant transaction windows
new Pella Lifestyle series window with Integral blinds. The blinds are manufacturered
Includes: out of the country and will be delayed. Pella will install the blinds once they come in,
which could be after occupancy.
Exhibit °C July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
utility company charges and backcharges. We exclude costs related to power
Excludes: consumption as a result of the construction process
Excludes: utility company charges and backcharges if required to raise or cover power lines for
lifts to be used to do work around the exterior of the building
Excludes: Future Tariffs imposed that affect costs of materials for the duration of this project
Project Name
Exhibit "C July 30, 2020
ASSUMPTIONS CLARIFICATIONS
NASHUA PUBLIC HEALTH
: NASHUA PUBLIC HEALTH - GMP
Estimate #: 4110
SCOPE CLARIFICATIONS
Based Upon:
Drawings: See Exhibit "A" Dated: 7/16/2020
Specifications: Dated:
Addenda: Dated:
DIVISION 1 (GENERAL CONDITIONS):
Exhibit “B”
ALLOWANCES
The Owner and MN agreed the work described below to be treated as individual allowances, The value of
this work has been incorporated into the Contract Amount. The value of the work has been estimated by
MN based on availabie information. The actual cost of the work will vary from the estimate.
The cost of the work will be tracked and reported to the Owner on a biweekly basis in a format te be
mutually agreed upon by the Owner and MN.