Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 8/11/2020 - P49

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P49

2.12 DIVISION 12 -- FURNISHINGS

A. 12 3600 - Countertops
2.13 DIVISION 13 -- SPECIAL CONSTRUCTION
2.14 DIVISION 14 -- CONVEYING EQUIPMENT

A. 14 2100 - Electric Traction Elevators

B, 14 4250 - Vertical Wheelchair Lifts

14 2400 - Hydraulic Elevators

Board Of Aldermen - Agenda - 8/11/2020 - P48

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P48

2.08

2.69

2.10

BOZEr ALS TaAMNMog

07 2119 - Foamed-in-Place Insulation

0? 2126 - Biown Insulation

OF 2129 - Sprayed Insulation

Q7 2500 - Weather Barriers

07 5400 - Thermoplastic Membrane Roofing
07 6100 - Sheet Metal Roofing

07 6200 - Sheet Metal Flashing and Trim

07 7100 - Roof Specialties

0? 7123 - Manufactured Gutters and Downspouis
OF 7200 - Root Accessories

07 8123 - Intumescent Fire Protection

07 8400 - Firestopping

O7 9200 - Joint Sealants

DIVISION 08 «+. OPENINGS

Board Of Aldermen - Agenda - 8/11/2020 - P47

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P47

sienna Nashua Public Health
CONTRACT 18 Mulberry Street

DOCUMENTS Nashua, NH

Board Of Aldermen - Agenda - 8/11/2020 - P46

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P46

52.0 Elevator Sections 3/18/20
$2.1 Stair Sections 3/18/20
§2.2 Entry Sections & Details 3/18/20
PLUMBING

P1.00 Basement Sanitary & Vent Piping Plan 3/18/20
P1.01 First Floor Sanitary & Vent Piping Plan 3/18/20
P1.02 Second Floor Sanitary & Vent Piping Plan 3/18/20
P2.00 Basement Domestic Piping Plan 3/18/20
P2.0i First Floor Domestic Piping Plan 3/18/20
P2.02 Second Floor Domestic Piping Plan 3/18/20
P3.00 Detail Legend & Schedules 3/18/20
P4.00 Specifications 3/18/20
MECHANICAL

Board Of Aldermen - Agenda - 8/11/2020 - P45

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P45

Exhibit “A”
CONTRACT DOCUMENTS

Nashua Public Health

@
18 Mulberry Street
Nashua, NH

uly 30, 2020

SHEET DRAWING LIST ISSUE
DATE

Board Of Aldermen - Agenda - 8/11/2020 - P44

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P44

O THE AGREEMENT
he Mealth

Exhibit “A” CONTRACT DOCUMENTS

Exhibit “B” ALLOWANCES

Exhibit “C” ASSUMPTIONS AND CLARIFICATIONS
Exhibit “D” CONSTRUCTION SCHEDULE

Exhibit “E” SCHEDULE OF VALUES

Exhibit “F” CONTINGENCY

Martini Northern, LLC

&

TINT

é:

10 Main Street # mn vec
Newfields, NH 03856 i
RAAT

a ee

uarity te mmartiningrthecn ce
WV Lites Tuninorminsit com

b

Board Of Aldermen - Agenda - 8/11/2020 - P43

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P43

Init.

litem Price
See Exhibit B

§ A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based:
(dentip each assumption and clarification.)

See Exhibit C

§ A3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information:
(ist any other documents or information here, or refer to an exhibit attached to this Amendment.)

ARTICLE A4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND
SUPPLIERS

Board Of Aldermen - Agenda - 8/11/2020 - P42

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P42

[X] Not later than three hundred and twenty (320 ) calendar days from the date of commencement of the
Work.

i ] By the following date:

§ A.23.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are
to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial
Completion of such portions by the following dates:

Portion of Work Substantial Completion Date
None

Board Of Aldermen - Agenda - 8/11/2020 - P41

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P41

(S 2,825,625.08 ), subject to additions and deductions by Change Order as provided in the Contract Documents.

§ At4.2emized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the
Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager’s
contingency; altemstes; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price
as deftmed in Section 3.2.1 of the Agreement.

(Provide itemized statement below or reference an attachment)

Board Of Aldermen - Agenda - 8/11/2020 - P40

By dnadmin on Sun, 11/06/2022 - 23:05
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P40

Init.

This Amendment dated the thirtieth day of July in the year Two Thousand and Twenty, ts
incorporated into the accompanying ALA Document A133™ 2019, Standard Form of
Agreement Between Owner and Construction Manager as Constructor where the basis of
payment is the Cost of the Work Pius a Fee with a Guaranteed Maximum Price dated the
nineteenth day of December in the year 2019 (the "Agreement")

(in words, indicate day, month, and year.)

for the following PROJECT:
(Name and address or location)

Pagination

  • Previous page ‹‹
  • Page 1002
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact