Finance Committee - Agenda - 6/7/2017 - P217

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P217

ITEM 604.4 - REPAIR OF EXISTING STRUCTURES
A. SCOPE

This work consists of repairing existing structures below 12” from the bottom of existing casting
frame.

B. MATERIALS AND CONSTRUCTION

The contractor shall include all labor, materials, equipment, and transportation necessary to
repair existing structures other than within the top 12 inches below the bottom of casting frame.
Repairs in that section shall not be paid under this item.

Finance Committee - Agenda - 6/7/2017 - P216

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P216

" 8% polyester reinforcing fibers

Finance Committee - Agenda - 6/7/2017 - P215

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P215

Preparation and Placement of Sealant

No crack sealant material shall be applied in wet cracks or where frost, snow or ice is present,
nor when the ambient temperature is below 25 degrees F.

Finance Committee - Agenda - 6/7/2017 - P214

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P214

* At temperatures ranging from ambient to maximum finished product mix
temperature
** Subject to Normal Variations

The modified asphalt-fiber compound shall be mixed at a rate of 8% fiber weight to weight of
asphalt cement. This compound having the same chemical base provides compatibility and
exhibits excellent bond strengths. The fiber functions to re-distribute high stress and strain
concentrations that are imposed on the sealant by thermal sources, traffic loading, etc.

C. EQUIPMENT

Finance Committee - Agenda - 6/7/2017 - P213

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P213

ITEM 405.11 - CRACK SEALING

A. SCOPE

The work covered by this section of the specification consists of furnishing all materials, labor,
transportation, and equipment necessary to perform all operations in connection with the
cleaning and sealing of construction and random cracks in bituminous concrete pavements,
including vegetation removal and sterilization of cracks, where necessary.

B. MATERIAL

Finance Committee - Agenda - 6/7/2017 - P212

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P212

Micro-Surfacing Mixture

Samples of the mixture should be taken daily and may be taken directly from the mixing unit(s).
Consistency and residual asphalt content tests may be made on the samples and compared to the
specifications. Tests will be run by a qualified laboratory at the expense of the Owner. The
Owner must notify the contractor immediately if any test fails to meet specifications.

Finance Committee - Agenda - 6/7/2017 - P211

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P211

Joints

No excessive buildup, uncovered areas or unsightly appearances shall be permitted on
longitudinal or transverse joints. The contractor shall provide suitable width spreading
equipment to produce a minimum number of longitudinal joints throughout the project. When
possible, longitudinal joints shall be placed on lane lines. Half passes and odd width passes will
be used only in minimum amounts. If half passes are used, they shall not be the last pass of any
paved areas.

Mix Stability

Finance Committee - Agenda - 6/7/2017 - P210

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P210

F. SURFACE PREPARATION
General

The area to be resurfaced shall be thoroughly cleaned of vegetation, loose aggregate and soil,
particularly soil that is bound to the surface. Manholes, valve boxes and other service entrances
will be protected from the surfacing material with polyethylene sheeting. All services will be
uncovered upon completion of work.

Cracks in Surface

Finance Committee - Agenda - 6/7/2017 - P209

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P209

Emulsion Pump

The emulsion pump shall be a heated, positive displacement type pump.

Spreading Equipment

Finance Committee - Agenda - 6/7/2017 - P208

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P208

Aggregate - Recommended Gradations:

Type II Production

Screen Size % Passing Tolerance

3/8” 100 +7.0/+7.0
#4 90-100 + 7.0
#8 65-90 +40
#16 45-70 +40
#30 30-50 +40
#50 18-30 +40
#100 10-21 +40
#200 5-15 +2.0

Suggested Application Rates:

Type II - Urban and Residential Streets and Airport Runways:
single course = 18-20 lbs//s.y.
double course = 28-32 Ibs./s.y.

Note: all application rates above are dry aggregate weights exclusive of emulsion and all other
additives.