ITEM 632.9 - OBLITERATE PAVEMENT MARKINGS
A. SCOPE
This work shall consist of removal of pavement lines and symbols at locations shown on the
plans or as ordered by the Engineer.
B. MATERIALS AND CONSTRUCTION
The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
removal of retroreflective paint lines, retroreflective thermoplastic lines, and retroreflective
thermoplastic symbols in accordance with the latest approved NHDOT Standard Specifications
for Road and Bridge Construction.