Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P207

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P207

2.) Sections 4.1 and 4.1.1 -- to be disregarded as they are solely intended for HMA.

3.) Section 4.2 — replaced in its entirety to read “Test Specimens — specimen length and
width must match Figure | (cutting template), and specimen height must be 0.50 in.
Make and cure the micro-surfacing overlay test specimens using similar methods and
resulting in similar mixture composition and mix consistency as done for the TB 100
(Wet Track Abrasion) and TB 147 (Loaded Wheel Test) specimens.

Finance Committee - Agenda - 6/7/2017 - P206

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P206

The water shall be potable and shall be free of harmful soluble salts.
Modifier

Special quick-setting emulsifier agents shall be milled into the asphalt emulsion. The emulsified
asphalt shall be so formulated that when the paving mixture is applied at a thickness of one inch
with the relative humidity at not more than 50% and an ambient air temperature of at least 75
degrees F, the material will cure sufficiently so that rolling traffic can be allowed in one hour
with no damage to the surface, as verified by the Engineer.

Additives

Finance Committee - Agenda - 6/7/2017 - P205

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P205

ITEM 404.11 —-MICRO-SURFACING
A. SCOPE

Work shall include all labor, materials, equipment, and transportation required for surface
preparation and placement of a thin overlay (micro-surface) as shown on the plans and as
directed by the Engineer.

B. MATERIALS

Emulsified Asphalt

Finance Committee - Agenda - 6/7/2017 - P204

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P204

ITEM 403.12 -HOT BITUMINOUS PAVEMENT, HAND METHOD
A. SCOPE

This work shall include paving using the hand method for areas where it is impractical to pave
using machine method, where shown on the plans, or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 6/7/2017 - P203

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P203

ITEM 403.11 -HOT BITUMINOUS PAVEMENT, MACHINE METHOD
A. SCOPE

This work shall consist of furnishing and placing bituminous pavement including shim pavement
to the depth shown on the plans or ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 6/7/2017 - P202

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P202

ITEM 304.112 - RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12” DEEP
A. SCOPE

Finance Committee - Agenda - 6/7/2017 - P201

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P201

ITEM 203.112 — Street Patch
A. SCOPE

This work includes removing damaged asphalt by milling, saw cutting, or jack hammering as
determined by the Engineer. If removal extends to the subbase, the subbase shall be compacted
to 95% density prior to placing new asphalt.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 6/7/2017 - P200

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P200

DIVISION 9

TECHNICAL SPECIFICATIONS

Finance Committee - Agenda - 6/7/2017 - P199

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P199

RESPONSIBILITIES

OWNER: City of Nashua

CONTRACTOR:

The following documents are attached to and made a part of this Certificate:

[For items to be attached see definition of Substantial Completion as supplemented and other specifically
noted conditions precedent to achieving Substantial Completion as required by Contract Documents.}

This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR’s obligation to complete the Work in accordance with the Contract

Finance Committee - Agenda - 6/7/2017 - P198

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P198

CERTIFICATE OF SUBSTANTIAL COMPLETION

PROJECT:

OWNER’S CONTRACT NO:

DATE OF ISSUANCE:
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.:

CONTRACTOR:

ENGINEER: DPW Engineering

This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:

TO City of Nashua
(OWNER)
And To
(CONTRACTOR)

Pagination

  • Previous page ‹‹
  • Page 1276
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact