Finance Committee - Agenda - 10/2/2019 - P109
CONTRACTOR shall submit a design drawing of the upper seal of the diaphragm connection
to the piston sidewalls, The CONTRACTOR shall be required to submit a design drawing
acceptable to the Wastewater Engineer of this connection.
ARTICLE 3 — PERIOD OF PERFORMANCE