Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/2/2019 - P106

Finance Committee - Agenda - 10/2/2019 - P106

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
106
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

ORIGINAL AND

FINAL
CONTRACT START AND
PROJECT NAME & PROJECT AMOUNT AND END DATES
LOCATION OWNER PROJECT DESGRIPTION AND SPECIFIC SCOPE EXPLANATION {MIDIYYYY)
Carnaghi ~ Model Spincratt Initial scope was preparing an existing area to support a Carnaghi | Original Amount: 12/04/14
AX52T Vertical 500 Iron Horst Part Vertical Turning Center, which Spincraft uses to create complex $1,164,900
Turning Center North Billerica, MA 01862 metal fabrication for the aerospace, defense and energy industries.
Work consisted of demolition of concrete floor siab, dewatering and Final Amount:
North Billerica, MA Joe Santa Fe excavation with engineered support in order to form and place a $3,291,806
978-667-2774 concrete foundation measuring 60'x55' inside the existing facility.
jsantafe@spincraft.net Prior to starting construction, the soil was found to be contaminated Owner initiated
with asbestos. To address this issue, Methuen, in conjunction with changes due to
the owner and engineer, developed a plan to safely remove and environmental
dispose of over 2,000 tons of contaminated material. issues beyond the
original scope of
work
Anaerobic/Digestion/ | Lewiston-Auburn Water Pollution | Furnish and install two new anaerobic digesters, a biogas and Original Amount: 02/27/14
Energy Recovery - Control Authority digested sludge storage tank and cover system new digester $11,140,548
Lewiston-Auburn PO Box 1928 equipment building with new sludge heat exchangers, central dual-
WPCA - Lewiston, Lincoln, ME 04241 fuel boilers and hot water recirculation pumps, digester mixing Final Amount:
ME system pumps, recirculation pumps and belt filter feed pumps, new $12,774,044
Clayton Richardson electrical and instrumentation and replacement of existing thickened
207-782-0917 sludge pumps. Owner initiated
crichardson@lawpca.org changes for
improvements
beyond the original
scope of work.
Water Treatment City of Somersworth, NH installation of new clarifiers with associated pumps, polymer system, | Original Amount: 02/05/2008

Facility Upgrade

Somersworth, NH

1 Government Way
Somersworth, NH 03878

Robert Belmore
603-692-9503
bbelmore@somersworth.com

controls and instrumentation. Construction of a new concrete clear
well. Construction of three (3) earthen process waste lagoons and
the installation of new Alum, Ferric Chloride, and Aluminum Sulfate
Feed System at the existing 6 MGD water treatment facility.

$6,326,234

Final Amount:
$6,483,467

Owner initiated
changes for
improvements
beyond the original
scope of work.