ORIGINAL AND
FINAL :
CONTRACT START AND
PROJECT NAME & PROJECT AMOUNT AND END DATES
LOCATION OWNER PROJECT DESCRIPTION AND SPECIFIC SCOPE EXPLANATION (MIDIYYYY)
WPCF Secondary City of Chicopee Work consisted of, but was not limited to, both clarifier tank and Original Amount: 10/26/2016
Clarifier Upgrade, 80 Median Street mechanism/process related work, Concrete tanks were $1,386,890
Contract 7 Chicopee, MA 01085 rehabilitated, leaks through clarifier walls were sealed and cracks 03/19/2019
repaired in the concrete, Repair work included the demolition and Final Amount:
Chicopee, MA Quinn Lonezak replacement of the existing tank pressure relief/check valves and $1,324,529
413-594-3585 the removal and replacement of the grout wear surface. The
existing clarifier mechanisms, weirs, baffles and supports in the
clarifiers were demolished and replaced. The entire sludge removal
mechanism was replaced including the mechanical drive units, the
draft tubes, corner sweeps and walkways.
South Essex South Essex Sanitary District | The project consisted of the construction of upgrades to the Original Amount: 11/20/2017
Sewerage District, PO Box 989 treatment plant including replacement of oxygen reactor impellers, $1,625,801
Oxygen Mixer Salem, MA 01870 installation of a drain and site drainage improvements. 07/10/2019
Final Amount:
Salem, MA Alan Taubert $1,770,425
978-774-4550
Odor Control City af Newburyport, MA Work included the installation of: 1) a new 20,000 cubic feet per Original Amount: 04/28/2017
Improvements 60 Pleasant Street minute biofilter comprised of engineered media housed in a new $4,163,576
Newburyport, MA 07950 cast-in-place vessel, 2) exterior odor control ductwork: 316 spiral 02/28/2018
Newburyport, MA stainless steel above ground and DR15 PCV generally below
Anthony Furnari ground, galvanized support columns and beams; connections to Final Amount:
978-465-4464 existing odor control system and exterior booster fans, 3) supply air $4,200,508
systems including two new make-up air units and interior ductwork,
4) two primary clarifier flat aluminum covers, new stair, lighting,
electrical wiring, and duct work, 5) new septage receiving statin
within inline sewage grinder, rock basket, and 6) demolition of the
existing biofilter, irrigation piping, buried structures, concrete pads,
concrete barriers, ductwork, and electrical components.