Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/19/2019 - P28

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P28

Drawing for HVAC-1 Replacement #1

SETI UGnudA aseEMYyOS Wor pad yume A

TPpSs NY ‘SHOdeauonw ‘paig qed JeUISHpUl OOSET

NIMIVO &

wcsaun aag i

SC Of PIUEIZIOL

| SiN 4295

TIO T yeays

TABU AIBA GTOZ ‘Ot “434

WVdS0TOSv5 -|apow

ueaiganspe

- UONIEIS B1/4 ENYSEN BIEOOETZ ‘WEN DaloIq

Jajpuey siy uoista aNpOId

{uojsog) PUur(SUZ MAN S.LH -@5YO 5312S

T# Juawase|day T-DVAH :8e) Wun

UONBAS]Z/Ueld

MIA ONG ava

MIA DRULIWOS!

INO BS

MAGIA NOUIVASTS

ANITA ONT INOW

Finance Committee - Agenda - 6/19/2019 - P27

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P27

Technical Data Sheet for HVAC-1 Replacement #1

pals dua oka a

Section Length Weight Casner Weights (Ib) ; Center of Gravity (in)
in ib PL Pz P3 pa xe yy zz
1 52 732 157 144 209 222 31 30 17
Entire Unit 52 732 157 144 209 222 32 36 17
VY > q)
; P2 P3
Air Flow _
Pl P4
5 2)
Pian View
> XX

NOTE: Special components aren't included in the corner weights and center of gravity data.

iene ee

The air-handier is selected outside of the scope of AHRI 430

Finance Committee - Agenda - 6/19/2019 - P26

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P26

Technicai Data Sheet for HVAC-1 Replacement #1

Combination Coil Length: 24 in Shipping Section: 1

Finance Committee - Agenda - 6/19/2019 - P25

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P25

Technical Data Sheet for HYAC-1 Replacement #1

Jobinformation

job Name
Date
Submitted By

Software Version

Unit Tag

ues
21900368 Nashua Fire Station - Lake Street
February 20 2019

DA

11.75

HVAC-1 Replacement #1

Unit Overview

Air Volume

Static Pressure Per epee

Scary) Total
inWe hia

2.60 0,00 36° 62*

Model Number

Cciae]

nN

CACOLOGBAM | 4805

*Not including base rails, coil connectors, drain connectors and control boxes.

Finance Committee - Agenda - 6/19/2019 - P24

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P24

Technical Data Sheet for HVAC-i Replacement #1..... i : osTaaeebers aaa 3
Drawing for HVAC-1 Replacement #1......... gueeesspusnsS¢eG0t eS suueue Gas SGusdsueusTsesneTnaesE tay 5U0ees=5555=en=es=siSesnsuestassaiesusers «f=? = 6
Technicai Data Sheet for HVAC-1 Replacement A2............00 se eeeseses SseoesrPSaaTaA faeeeneresereaaen eseeraeee fay ees esesearessaes ss=usssursssnsrers 10
Drawing for HVAC-2 Repiacement #2 ea 13
Job Number: J4F053 Page Prepared Date: 2/20/2019

Job Name: 21900368 Nashua Fire Station - 2 of 18 www. DaikinApplied.com

Finance Committee - Agenda - 6/19/2019 - P23

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P23

SUBMITTAL DATA

for
21900368 Nashua Fire Station - Lake Street

Sold to

Prepared for

Yeaton Engineering

Job Number: J4FO53 Customer PO#:

Prepared by
HTS — Derek Anneser
2/20/2019

Job Number: J4FOS3 Page Prepared Date: 2/20/2019
Job Mame: 21900368 Nashua Fire Station - 1 of 18 www. DaikinApplied.com

Finance Committee - Agenda - 6/19/2019 - P22

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P22

A new thermal expansion tank with an 8.9-gallon acceptance voiume shall be provided (Similar to
Amtrol ST-30VC)} on the cold-water feed side of the boiler before the check valve. A new 2-inch
discharge thermostatic mixing valve shall be installed rated for ASSE 1017.

A new self-sensing ECM hot water recirculation pump (Similar to the Taco 00e) shall be provided
and installed to maintain hot water distribution temperature. The pump shall run whenever the
hot water return line reaches a temperature of 105°F or lower.

Finance Committee - Agenda - 6/19/2019 - P21

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P21

Contractor shall provide and install 4” diameter fiue and combustion air venting for the domestic
water heater to terminate at the exterior of the building. Venting shall be installed as per
manufacturer provided guidelines and material shall be as per manufacturer. Routing of vents shall
be coordinated with and approved by the owner but it is assumed they could be run up in the flue
chase adjacent to the break room above the mechanical room and then terminated at the sidewall.

Finance Committee - Agenda - 6/19/2019 - P20

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P20

Proposed Mechanical

« General
The bidding contractor shall put in writing and issue with the bid proposal any assumptions or
exemptions above and beyond those outlined in the RFP pertaining to the project.

Finance Committee - Agenda - 6/19/2019 - P19

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P19

VA
Existing Conditions

*

* Heating, Cooling, and Ventilation Systems

Pagination

  • Previous page ‹‹
  • Page 860
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact