Finance Committee - Agenda - 3/6/2019 - P333
21.
22.
23.
24.
include, but not be limited to paving, pipe installation, catch basins, manholes and
curbing.
Unless specifically agreed to in advance, driveway tie-ins will be paved concurrent with
top course paving operations.
In no circumstances shall driveway tie-ins not be completed within two weeks of the
adjacent top course paving.
COOPERATION WITH REFUSE PICKUP