Technical Specifications FY2019 Paving Program
ITEM 609.5 —RESET GRANITE CURB
A. SCOPE
This work shall consist of removal, Stockpiling and resetting granite curb as shown on the
drawings or as directed by the Engineer. Furnishing and placing all materials required for
resetting granite curb shall be included.
B. MATERIALS AND CONSTRUCTION
The Contractor shal] furnish all materials, labor and equipment necessary for resetting granite
curb in accordance with relevant provisions of Section 609 of the NHDOT Standard
Specifications for Road and Bridge Construction, latest edition, and City of Nashua Standard
Specifications for Sidewalk Construction, latest edition. The most stringent specifications shal]
apply unless otherwise directed by the Engineer,
C. MEASUREMENT AND PAYMENT
Contractor shall record the location and linear feet of granite curb reset for each street. Payment
is contingent upon submittal of quantities in a per street format.