Finance Committee - Agenda - 11/18/2020 - P41
*s «68 @® #@ &@ wb & & © & *&® @ © Fe FF F FF Fe Fhe FeO ehUhhUh hhUrhhlCUc hUchhUrhhUhrhUhHhUhhUchhUh}]h UhV!LhUh)M])hUMhrhUh]hUh!hUhOhUmh!
*s «68 @® #@ &@ wb & & © & *&® @ © Fe FF F FF Fe Fhe FeO ehUhhUh hhUrhhlCUc hUchhUrhhUhrhUhHhUhhUchhUh}]h UhV!LhUh)M])hUMhrhUh]hUh!hUhOhUmh!
soo @#@ @hmUch OoOmhlUchrhUchO OO oHhUhHhUhFDhUchOmhUrhFhUrhOrhlUrhHDhUhFOChUrhhlUchhhlUrhhUcrhhUch FP HH HOhUchhUhhUhmhUhOrhUCUchFmhUchFhUchOFrhUcCPOrhUrhUhFhUhrChUhhrhUCUcPmhUCUchOhmrhCUcrhhUCcr Chr he PRP FP FH FH Fh hUhMDhUhO
Structural Set - As Prepared by Rist Frost Shumway Englneerlng, P.C.
eee ee @ @ @ © @ @ @ © # 6&6 e F&F FB HO
§-001
3-002
8-003
8-004
§-005
5-066
$-100
8-101
$-102
$-103
$-104
$-105
$-106
S-107
8-108
5-201
$-202
5-304
3-302
3-303
$-304
THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA NEW HAMPSHIRE
LIST OF DOCUMENTS
EXHIBIT “G”
10/20/2020
REPORTS
SW Cole Geotech Report
RPF Hazardous Material Report — File No. 199123
PROJECT DRAWINGS & SPECIFICATIONS
General - As prepared by ICON Architects
« G-000 Cover Sheet
« G-001 Drawing Set
e G-002 Abbreviations & Graphic Symbols
Civil Set — As Prepared by Rist Frost Shumway Engineering, P.C.
« cC-001 Civil Notes, Legend & Abbreviations
THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
ASSUMPTIONS & CLARIFICATIONS
EXHIBIT “F”
16/20/2020
The following Is a list of assumptions and clarifications to Harvey Construction’s GMP:
*
THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
ALTERNATES
EXHIBIT “D”
10/20/2020
The following is a list of add alternates presenily not included in Harvey Construction’s GMP:
{Alternates include labor, material, equipment and mark-ups unless noted otherwise).
NONE
Certification of Document’s Authenticity
AIA® Document D401™ — 2003
Init.
See Attached Exhibit D
§ A.1.1.4 Allowances included in the Guaranteed Maximum Price, if any:
(Identify allowance and state exclusions, if any, from the allowance price.)
Item Price ($0.00)
See Attached Exhibit E
§ A11.4 Assumptions, if any, on which the Guaranteed Maximum Price is based:
See Attached Exhibit F
§ A.1.1.6 The Guarantecd Maximum Price is based upon the following Supplementary and ather Conditions of the
Contract:
Document Title Date Pages
None
BATA document A133°- 2009 Exhibit A
Guaranteed Maximum Price Amendment
_for the following PROJECT:
(Name and address or location}
. Downtown Performing Art Center
201 Main Street
Nashua, NH 03061
“THE OWNER:
(Name, legal status and address)
City of Nashua
229 Main Street
Nashua, NH 03061-2019
THE CONSTRUCTION MANAGER:
(Name, legal status and address)
Harvey Construction Corporation
10 Harvey Road
Bedford, New Hampshire 03110
ARTICLE A.4
ADDITIONS AND DELETIONS:
RESOLUTION:
PURPOSE:
SPONSOR(S):
COMMITTEE
ASSIGNMENT:
FISCAL NOTE:
LEGISLATIVE YEAR 2020
R-20-093
Approving the Maximum Price Amendment for the
Performing Arts Center
Mayor Jim Donchess
Finance Committee
The Guaranteed Maximum Price to construct the Preforming
Arts Center, guaranteed by the Construction Manager, is
$15,821,890, subject to additions and deductions through the
Change Order process.
ANALYSIS