Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 11/18/2020 - P51

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P51

Harvey Construction

Spreadsheet Report
_Nashua PAC GMP PostBid VE _

Page 2
10/27/2020 3:45 AN

Notes

Report foniat

Frames and Paitted Terrace rails.

-Banquet Tablas or Chairs / Moveable Furniture.

No Foundation demolition at the 2-Story Building.

~S5SP6 AESS Prep.

-Architectural As-Built in CADD

-Design Services, Cost associated with Spacial inspections, Sales Tax
-See exhibit "J"

Sorted by ‘Group phase/Phase’
‘Detail summary

Finance Committee - Agenda - 11/18/2020 - P50

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P50

Harvey Construction Spreadsheet Report Page t
Nashua PAC GMP PostBid VE 19/21/2020 8:45 AM

Project nama Nashua PAC GMP Post8id VE
201 Main St.
Nashua
NH
Estimator JEB
Laborrate table == NH
Job size s7c00 sf
Bid date 10/2/2020 2:00 PM
Notes Based on 100% CO Drawings & Specifications dated 8/14/20

Exclusions:
-Design Contingency
-Recent Tariffs.

Finance Committee - Agenda - 11/18/2020 - P49

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P49

THE CITY OF NASHUA
DOWNTOWN PERFORMING ART CENTER
NASHUA, NEW HAMPSHIRE
GMP ESTIMATE
EXHIBIT “H”

10/20/2020

Finance Committee - Agenda - 11/18/2020 - P48

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P48

321640 — Granite Curb

321723 ~ Pavement Markings
321726 — Tactile Warning Surfacing
323113 — Chain Link Fences & Gate
323130 — Bollards

Division 33 — UTILITIES
331100 — Water Distribution System
333100 — Sanitary Sewer System
334100 — Storm Drainage

ADDENDUMS -WNone BATE

Finance Committee - Agenda - 11/18/2020 - P47

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P47

235360 — Mini-Split Air Conditioning Systems
235400 — HVAC Pumps

235450 — Hydrostatic Testing & Chemical Water Treatment
237300 — Variable Refrigerant Flow Systems
237810 — Dedicated Outside Air Unit

238350 — Terminal Heat Transfer Units
238450 — Energy Recovery Units

238960 — Ductwork

239160 — Ductwork Accessories

239200 — Sound Attenuators

239300 — Air Terminal Units

299360 — Air Outlets & Inlats

239750 — Building Automation System
239806 — Instrumentation

Finance Committee - Agenda - 11/18/2020 - P46

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P46

Division 69 - FINISHES
092116 — Gypsum Board Assemblies
092120 — Gypsum Board Shaft Wail Assemblies
092409 — Plaster Patching and Repairs
093006 — Tiling
0951006 — Acoustical Ceilings
096454 — Stage Floor
096510 — Resilient Flooring & Accessories
096800 — Carpeting
099000 — Painting & Coating

DIVISION 10 —- SPECIALTIES
101400 — Signage
102110 - Toilet Compartments —
102210 — Wire Mesh Partitions
102800 — Toilet Accessories
10440 — Fire Protection Specialties
105110 ~ Metal Lockers

Finance Committee - Agenda - 11/18/2020 - P45

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P45

DIVISION 04 —- MASONRY
040120 — Masonry Restoration & Cleaning
042000 — Unit Masonry
044000 — Exterior Stonework

DIVISION 05 - METALS
051200 — Structural Steel
051250 ~ Architecturally Exposed Structural Steel
052100 — Steel Joist
053100 — Steal Decking
054000 - Cold-Farmed Meial Framing
055000 — Metal Fabrications
055100 — Metal Stair & Railings
057300 - Decorative Metal Railings
057500 — Decorative Formed Metal
059000 — Hof Dip Galvanized Coatings

Finance Committee - Agenda - 11/18/2020 - P44

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P44

Telcom — As Prepared by ICON Architects

T-001
T+104
T-102
T-103
7-104
T-105
T-201
T-301

Telecom Legend, Notes & Abbreviations
Basement Floor Telecom Plan

Ground Floor Telecom Plan

Parterre Floor Telecom Plan

Third Floor Telecom Plan

Fourth Floor Tefecom Plan

Telecom Riser Diagram

Telecom Details & Schedules

Theatrical LightIng — As Prepared by ICON Architects

oo * 2 @ 68 8 ©

Finance Committee - Agenda - 11/18/2020 - P43

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P43

ee #68 @ @ @ 8 @ 6& & & & @ © @ 8 @

Fire Alarm — As Prepared by Rist Frost Shumway Englneering, P.C.

es = @ @ @ # @ ©

E-203
E-204
E-205
E-206
£-301
E-302
E-303
E-304
E-305
E-401
E-402
E-403
F501
E-502
E-503
E-504
ES-101
ES-102

FA-004
FA-101
FA-192
FA-103
FA-104
FA-105
FA-106
FA-201

Parterra Floor Power Plan
Third Floor Power Plan
Fourth Floor Power Plan
Roof Power Plan

Finance Committee - Agenda - 11/18/2020 - P42

By dnadmin on Mon, 11/07/2022 - 13:24
  • Read more about Finance Committee - Agenda - 11/18/2020 - P42

Plumbing — As Prepared by Rist Frost Shumway Engineering, P.C.

Mechanical — As Prepared by Rist Frost Shumway Engineering, P.C.

**?e ¢@ © @ @ @©@ @ @ 8 8 ® HehmUchHMUC OFHOrhUchFhUchMmrChCUCcPOhUhCUCchUchmUMPPhmhUCUhFOhmhUCUCMrhlUhH

Poot
Pi00
P101
P102
P103
P104
P105
P106
P201
P202
P201

Pagination

  • Previous page ‹‹
  • Page 615
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact