Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Minutes - 8/19/2020 - P39

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P39

Product and Service Capabilities

* Monopoles (built in Valley, NE)
* Tapered slip-fit monopoles up to 250’
* Self-supporting towers (built in Plymouth, IN and Salem, OR)
* Pipe and solid rod designs
* Heights up to 500°
* Guyed towers
* Cellular and broadcast {am/fm}
* Heights up to 1500'
¢ Disguised Structures
* Monopine and monopalm
* Flag poles and unipoles
* Clock tower, water tanks, wind mills, bell towers
* Engineering Services
* PE stamps for all 50 states
* Tower reanalysis

Finance Committee - Minutes - 8/19/2020 - P38

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P38

valmont ¥

COMMUNICATION STRUCTURES

COMMUNICATION
STRUCTURES

Finance Committee - Minutes - 8/19/2020 - P37

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P37

valmont ¥

STRUCTURES

Finance Committee - Minutes - 8/19/2020 - P36

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P36

valmont WF

STRUCTURES

COMMUNICATIONS
STANDARD TERMS AND CONDITIONS OF SALE

Finance Committee - Minutes - 8/19/2020 - P35

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P35

valmont QUOTATION

Valmont Industries, Inc.
28800 Ida Street

Quote Number: 488749-03
Created: 8/3/2020 12:44:40 PM
Revised: 8/3/2020 1:13:09 PM

Valley, NE 68064

GENERAL NOTES
Please send orders to Lisa Taylor (lisa.taylor@valmont.com).

* Valmont reserves the right to apply storage charges of three-hundred and fifty dollars ($350.00) per month
for structures kept in our yard beginning the 1st of the month following the original ship date.

Finance Committee - Minutes - 8/19/2020 - P34

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P34

valmont QUOTATION

Valmont Industries, Inc.
28600 Ida Street

Quete Number: 488749-03

Created: 8/3/2020 12:44:40 PM

Revised: 8/3/2020 1:13:09 PM

Valley, NE 68064

5 MOUNT @ 68' (2) 6 STANDOFF ARMS WITH 2-3/8" X 36" 1
MOUNTING PIPES

SiteProl Parts: (1) UQB4, (2) PSA6, (2) 2-3/8" x 36" mounting pipes

6 MOUNT @ 65' (2) 6’ STANDOFF ARMS WITH 2-3/8" X 36” 1
MOUNTING PIPES

SiteProt Parts: (1) UQB4, (2) PSAG, (2) 2-3/8" x 36" mounting pipes

Finance Committee - Minutes - 8/19/2020 - P33

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P33

valmont QUOTATION
Quote Number: 488749-03

Fae Ont eee ess Inc. Created: 8/3/2020 12:44:40 PM
Revised: 8/3/2020 1:13:09 PM

Valley, NE 68064

Prepared for: City Of Nashua, NH
Attention: William Mansfield
Addressi: PO Box 785

Address2:
City: Nashua
State: NH
Zip: 03061
Phone: (603) 594-3521
Email: mansfieldw@nashuapd.com
Budgetary: No
RFQ: Project: City of Nashua - Keesler Farm - Nashua, NH - 88'
monopole
NOTICE

Finance Committee - Minutes - 8/19/2020 - P32

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P32

Criteria

Weight

Qualifications and Experience:

Bidder must provide information that demonstrates they possess the technical
expertise that is required for this scope of work

Reference Feedback

Respondent must demonstrate adequate experience in the following areas:
qualification, general experience and technical competence of the project team

Experience with similar type/size project

Expertise and resources that can perform the necessary tasks required to deliver

30%

Finance Committee - Minutes - 8/19/2020 - P31

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P31

Cable Tray/Ice Bridge

Pricing should include 60 feet of above ground 24 inch wide Ice bridge with poles, trapeze and
accessories.

Proposals shall include:

Lead time on stamped foundation drawings 2 weeks

Lead time on receiving the required anchor bolts 4 weeks

Lead time on Delivery of tower 10 weeks

Cost of Monopole Materials_26.200 (monopole and all associated accessories. current mounts at

each height excluding dishes)
*Include a list of all equipment that is included in this price

Finance Committee - Minutes - 8/19/2020 - P30

By dnadmin on Mon, 11/07/2022 - 13:27
  • Read more about Finance Committee - Minutes - 8/19/2020 - P30

Microwave Dish at 84 feet

1 RFS SC3-WI100AC Solid with Radome,
Ultra High freq
172.2 deg Azimuth/ Freq 11205.0

No mount will be required as a chain mount was purchased with the microwave.
Specs are included in the antenna supplement (Appendix B)

The tower should be designed to include a microwave dish at 84 feet for future expansion utilizing
the listed microwave dish and chain mount for loading. (Azimuth Information isn’t available at
this time. Tower should be constructed to allow for this dish to be added in the future.)

Pagination

  • Previous page ‹‹
  • Page 556
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact