Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Minutes - 8/19/2020 - P34

Finance Committee - Minutes - 8/19/2020 - P34

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Wed, 08/19/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 08/19/2020 - 00:00
Page Number
34
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__081920…

valmont QUOTATION

Valmont Industries, Inc.
28600 Ida Street

Quete Number: 488749-03

Created: 8/3/2020 12:44:40 PM

Revised: 8/3/2020 1:13:09 PM

Valley, NE 68064

5 MOUNT @ 68' (2) 6 STANDOFF ARMS WITH 2-3/8" X 36" 1
MOUNTING PIPES

SiteProl Parts: (1) UQB4, (2) PSA6, (2) 2-3/8" x 36" mounting pipes

6 MOUNT @ 65' (2) 6’ STANDOFF ARMS WITH 2-3/8" X 36” 1
MOUNTING PIPES

SiteProt Parts: (1) UQB4, (2) PSAG, (2) 2-3/8" x 36" mounting pipes

7? #24" X 10' GRIP STRUT ICE BRIDGE WITH Z-BRACKET 6
TRAPEZE (14 RUN 10'-6" SHOE)

SitePro1 Parts: IB248-2
Line is for a total of (6) ice bridges to span 60' when connected.

® 24" Grip-Span Ice Bridge Kits with 2-Bracket Trapeze.
« # of Runs - 14

* Trapeze - Z-Brackets, 1 Level

« Size - 24" x 10°

* Poles - 3-1/2" x 10'-6" Base Shoe

* Complete Kit

$1,336

$1,336

$650

NOTES

FINISH SYSTEM
Galvanized (GV) Base Coat: Hot-Dip Galvanized to ASTM A123 Spec: F-1.

GENERAL
Products may be foreign built - !f this is mot acceptable please request a revised quote.

MONOPOLE
For pole weight, base reactions and design/antenna loads, please refer to Valmont Permit
Drawing File ID 488749-03,

Pole sizes are preliminary only and may change slightly at time of order entry.
Foundation build and tower erection are by others.

FREIGHT
Estimated Cost, with unloading of truck by others to Nashua, NH, nearest access point to the
site, via flat bed tractor traller. Any special handling by other. (4 truck(s) required)

Estimated anchor steel freight shipped direct from our supplier. Average anchor steel lead time
is 4 to 6 weeks.

DELIVERY
Estimated lead time is 8 to 10 weeks, Please note that lead times are estimated and can
fluctuate due to production capacity. Please contact customer service to verify current lead
times or If a better dellvery date is possible when placing an order. A complete soil report and
plot plan (for guyed towers) must be received by Valmont prior to manufacturing.

MATERIAL PRICE
Due to material price fluctuations, Valmont reserves the right to review all material pricing prior
to accepting any order. Any order placed on hold is subject to a price review at the time of its
release,

Valmont may be required by state law to collect Sales/Use Tax at the time of shipment. If
required, this tax will appear as a separate Item on the Invoice, If you have a tax exempt
certificate, submit it at the time of order.

Page 2 of

$4,076

$250

$31,100

Page Image
Finance Committee - Minutes - 8/19/2020 - P34

Footer menu

  • Contact