Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Minutes - 8/19/2020 - P33

Finance Committee - Minutes - 8/19/2020 - P33

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Wed, 08/19/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 08/19/2020 - 00:00
Page Number
33
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__081920…

valmont QUOTATION
Quote Number: 488749-03

Fae Ont eee ess Inc. Created: 8/3/2020 12:44:40 PM
Revised: 8/3/2020 1:13:09 PM

Valley, NE 68064

Prepared for: City Of Nashua, NH
Attention: William Mansfield
Addressi: PO Box 785

Address2:
City: Nashua
State: NH
Zip: 03061
Phone: (603) 594-3521
Email: mansfieldw@nashuapd.com
Budgetary: No
RFQ: Project: City of Nashua - Keesler Farm - Nashua, NH - 88'
monopole
NOTICE

Quoted prices will be held firm for 90 days. Prices are subject to change if product is
not shipped within 2 months cf Purchase Order receipt.

ITEM DESCRIPTION OoTy UNIT PRICE
1 88' MONOPOLE - 87" POLE WITH 1’ FOUNDATION i $21,899
PROJECTION

Price Includes:

- Steel templates and anchor bo'ts.

- Pole sections and accessories to be hot dipped galvanized.

- Transmission line entry ports at the base of the pole.

- Transmission line exit ports at each specified antenna level.

- Pole assembly hardware,

- Removable climbing steps with galvanized Tuf-Tug cable type safety climb system (less
harness).

- Includes TIA-G standard grounding provisions welded to pole.
- Includes 4' lightning rod.

~ Includes 2' beacon mount,

+ Includes El FTS 370d LED AVIAN IR Beacon System

2 STRUCTURAL ANALYSIS 1 $400

Engineering drawings per design, to be P.E. sealed by a Registered Professional Engineer.
A pdf copy of the drawing is supplied, if hard coples are required please indicate on order.
Additional charges may apply for hard copies larger than 8-1/2" x 11".

3 FOUNDATION DESIGN PER CUSTOMER FURNISHED SOILS i $600
REPORT

Custom foundation (unit base or drilled caisson) if soil report is supplied.
A pdf copy of the drawing is supplied, if hard coples are required please indicate on order.
Rock foundations may incur additional charges. Price is for one site. Solls report to be provided
by the customer,
4 MOUNT @ 78' (3} 6' STANDOFF ARMS WITH 2-3/8" X 36" 1 $1,629
MOUNTING PIPES

SitePro1 Parts: (1} UQB4, (3) PSA6G, (3) 2-3/8" x 36" mounting pipes
Page 1 of 3

Page Image
Finance Committee - Minutes - 8/19/2020 - P33

Footer menu

  • Contact