Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/1/2022 - P54

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P54

LOCKER ANCHORED TO GASE ON 24° CENTERS MAX.

GENERAL DETAILS
FRONT BASES FURNISHED 72” LONG —|y ANCHOR TO WALL ON 36* CENTERS MAX, ra
ERECTOR TO CUT AS REQUIRED (SEE DETAIL “A")
ANCHOR
BACK LEGS ON 36” CTRS. MAX BASE, ANCHORED ON] 24°] CENTERS MAX. 2 PLACES
[VL (ANG AT EXPOSED ENOS) si i — EA. GASE.
WARNING 4 Lf 4 Lf / i 4. ye / = ; - ; ; ; t
WOOD SCREWS BY ERECTOR MUST HAVE A MIN
END BASES A
ANCHORED TO FLOOR * | 8 3 p
2 PLACES EA. BASE.
END BASES

Finance Committee - Agenda - 6/1/2022 - P53

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P53

OOD EXD e

fio-24 4 38"
MACHINE SCREW ANO

f-2e 2
MACHINE SCREW

HOODS aRE 10 BE CUT TO FIT LOCKER
wowT “@
4

ROWS, AND COMPLETELY ASSEMBLED WITH
0-24 x 3/8 TR, HO, ACHINE SCREWS
AND NUTS BEFORE PLAOQNG ON LOGHERS,

OPAL HOOD & END, AND
ATTACH wT OK 1/2" »
METAL SCREW

oxo CAP

CUT HOOD AS REQUIRED AT (1)
ENO OF EACH ROW. EITHER RIGHT aN
OR LEFT HAND END UAT BE CUT

Finance Committee - Agenda - 6/1/2022 - P52

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P52

l
| 14
Cover Piel
stated on expased cndy ot lne<ers for
1 durabhiy and an enhanced apocarance
fers optional heavy duty end panels (punched
requced) with all soit heads exposed. end
panels sheay only vertcal frame bolt heads No
ade ao Gxpased on cng finshing panels

Top Closures Closure Strips Front Expansion Fillers

Finance Committee - Agenda - 6/1/2022 - P51

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P51

Mens Supervisors
30.34
de,
26-26 Lockers to remain

MHS ta Remove Slope Tops and Salvage

| for Re-installation after Electrical Outlets

8-15

and Power Strips are Installed.
27-29

35-42
16-23 |

— MD) © SERVICE
INSTALLATION

{TT TT | mathand,com
20 Downgast Or TYartvoutn, ME 04066
*800 4388870

43-47

Finance Committee - Agenda - 6/1/2022 - P50

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P50

ESSSeoy sa" —-~—|

EXISTING LOCKERS TO REMAIN

AOD ELECTRICAL ONLY

Womens Supervisors

Add Power Strip to each
Unit,

MH6 te drill hole in top
of unit and attach Power
Strip with Double Sided
Adhesive Tape.

No Slope Tops Required
for this room
See Pictures

No slope tops are present
in this room

www. mathand.com

20 Downeast Or * Yarmouin, ME 04096
1 *800°458 41870

Finance Committee - Agenda - 6/1/2022 - P49

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P49

nt iiller
typ | panel _
42"
ee z yp
iter filler filler
panal panel = panel
Wher
panel
EE CCLOIL Loo
r 22a |

Womens Patrol Room

DEMO Existing (38) 18° wide 2 21°
Deeg x 72° high Wilson

Lockers

Concrete base to remain

Dispose of Lockers is dumpsters
provided by MHS

temove existing 4" cove base
leestall (28) 24" 2 217 a 72"
Cotlagiate HDV Lyon Werk
Lockers

Contingous Slope Tops
Finished End Panels at all

Finance Committee - Agenda - 6/1/2022 - P48

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P48

34'-6§"

ame To Pairs! Te Patrol
Roam 2 Room 2 1
add (2) 266 add (2}2 x6
I~ j window
| i << add 12° of base. 23 6 no
| 4 phnwoed
10°-0"
=p window
typ TT
18°-0" co ho new base needed
~ add (7) 246 add {2} 7x6 4
4?" |
tye 1

Mens Patrol 1

BERO Exrsting (125) 18° Wide
a 21” Deep x 72” High Wilson
lockers

5: 1/2" base concrete Io remain

Remove exlating 4° cove base

Olspose of Lockers bn dumpsters.
provided by MHS.

Finance Committee - Agenda - 6/1/2022 - P47

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P47

16-8" add Fil

Mens Patrol Room 2

DEMO Existing 152) 24° Wide
«21° Deep x 72" High Wilson
Lockers

Oemo 2-Base

Olspose of Lockers in dumpsters
providad by MHS.

Install (52) 24° w 21° 2 72°
Collegiate HDV Lyon Wotksoace
lockers

Includes, 3” metal 2-base
Continuous Slope Tops.

Finished End Panels at al]
exposed ends

17) Single Revs FEP
{2} Double Ain FEP
(1) Flat Finished End Panel

Finance Committee - Agenda - 6/1/2022 - P46

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P46

Conxsau pos

Slope Toe

NUMBER PLATE

F T= 7 tH YY
iPad
SHELF Va
1-COAT ROD 6 4-SINGLE
PRONG HOOKS i“
a
" “
STAINLESS STEEL a, | 21 4/16" 72° wai
RECESSED HANDLE ie) CLEAR Li“
LOCK HOLE FILLER i | /
i“
Exar,
Le se”
SuRis 4
M, a
DIAMOND PERFORATED DOOR la . YY
: sen oe | bit sto ano
ne : . ‘ | a » ao. 4
INTERIOR MAX __| | SINGLE ROW
ELEVATION TYP. £ND ELEVATION
FRONT ELEVATION

Finance Committee - Agenda - 6/1/2022 - P45

By dnadmin on Sun, 11/06/2022 - 21:41
  • Read more about Finance Committee - Agenda - 6/1/2022 - P45

Cyber oer
3 ft. 3-Outlet 2-USS Surce Protector

Pagination

  • Previous page ‹‹
  • Page 2083
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact