Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 4/6/2022 - P339

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P339

CONTRACT FOR PROFESSIONAL SERVICES

ARCGIS Hub, Equitable Property Value and Revaluation
Solution Configuration Support

A CONTRACT BETWEEN

THE CITY OF NASHUA, 229 MAIN STREET, CITY HALL, NASHUA, NH 03060
AND

Environmental Systems Research Institute, Inc.

and its successors, transferees and assignees (together “Professional Consultant” or Esri)

380 New York Street
Redlands CA 92373
ADDRESS OF PROFESSIONAL
CONSULTANT

Finance Committee - Agenda - 4/6/2022 - P338

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P338

City of Nashua

Administrative Services Division (603) 589-3020
229 Main Street - Nashua, NH 03060

To: Mayor Donchess
Finance Committee

Date: March 29, 2022
Re: ArcGlS Hub, Equitable Property Value, and Revaluation Solution Configuration Support

This request is for the configuration of a public accessible Assessment Evaluation dashboard.

Funding: Assessing 2300.32.20.10 Revaluation for $82,040

Finance Committee - Agenda - 4/6/2022 - P337

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P337

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (603) 594-3233

March 30, 2022
Memo #22-254

TO: Mayor Donchess
Finance Committee

SUBJECT: Assessing Data Dashboard Consulting Services in the amount not to exceed $82,040
funded from 55699 Other Contracted Services/Revaluation Bond

Finance Committee - Agenda - 4/6/2022 - P336

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P336

D. Lawn Seed:

1. Grass Seed: Provide fresh, clean, new-crop seed complying with tolerance for
purity and germination established by Official Seed Analysis of North America.
Provide seed mixture composed of grass species, proportions with maximum
percentages of purity and germination, and a minimum percentage of weed
seed, as specified.

¢ 45% Turf Type Tall Fescue

¢ 20% Kentucky Bluegrass

* 20% Creeping Red Fescue

¢ 15% Perennial Ryegrass

Sow at rate of 6-7 Ibs. per 1000 square feet.

Finance Committee - Agenda - 4/6/2022 - P335

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P335

SECTION 02920
LOAMING AND SEEDING
PART 1 —- GENERAL
1.01 DESCRIPTION OF WORK:

A. This section covers all labor, materials, and equipment necessary to do all loaming,
seeding and related work for miscellaneous areas disturbed by roadway and sidewalk

construction and as herein specified.

Note: Loaming and seeding for miscellaneous areas disturbed by roadway and

sidewalk construction is subsidiary to the sidewalk items of work.
1.02 RELATED WORK:
A. Section 02300 - EARTHWORK
B. Section 02370 — EROSION CONTROL

Finance Committee - Agenda - 4/6/2022 - P334

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P334

3.07 CURBING:

A. The Contractor shall install curbing in accordance with the Construction
Requirements as specified in NHDOT Section 609.

3.08 SIDEWALKS:

A. The Contractor shall install sidewalks in accordance with the Construction
Requirements as specified in NHDOT Section 608.

3.09 PAVEMENT MARKINGS:

Finance Committee - Agenda - 4/6/2022 - P333

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P333

C. Final rolling of the top course or surface treatment pavement shall be performed by a
steel wheel roller weighing not less than 285 pounds per inch width of tread at a mix
temperature and time sufficient to allow for final smoothing of the surface and
thorough compaction.

Finance Committee - Agenda - 4/6/2022 - P332

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P332

Engineer, the Contractor shall remove the temporary pavement and install or regrade
the sub-base for installation of permanent pavement.

3.04 PERMANENT BITUMINOUS PAVEMENT:

A. The bituminous paving mixture, equipment, methods of mixing and placing, and the
precautions to be observed as to weather, condition of base, etc., shall be in
accordance with NHDOT Standard Specifications Section 401. The permanent
pavement patch shall be constructed as detailed on the plans.

B. BASE COURSE AND BINDER COURSE PAVEMENT:

Finance Committee - Agenda - 4/6/2022 - P331

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P331

F. The Tack Coat shall be considered subsidiary to the pavement items of work.

2.03 CURBING:

A. Curbing shall conform to the requirements of NHDOT Standard Specifications 609,
Items 609.01 or Item 609.02 as detailed on the plans.

2.04 SIDEWALKS:

A. Sidewalks shall conform to the requirements of NHDOT Standard Specifications
608, Items 608.12 or Item 608.24 as detailed on the plans.

2.05 PAVEMENT MARKINGS:

Finance Committee - Agenda - 4/6/2022 - P330

By dnadmin on Sun, 11/06/2022 - 21:44
  • Read more about Finance Committee - Agenda - 4/6/2022 - P330

PART 2 - PRODUCTS

2.01 CRUSHED GRAVEL SUBBASE:

A. Crushed gravel subbase shall conform to NHDOT Item 304.3 Crushed Gravel, or
Item 304.4 Crushed Stone (Fine Gradation).

2.02 BITUMINOUS CONCRETE PAVEMENT:

A. The type of bituminous pavement courses to be utilized on this project shall be:

Roadway Pavement Section

Layer Description Thickness (inches)

Temporary Pavement (Single Course)
NHDOT 12.5mm Superpave 3” Arterial Streets
(50 Gyration Design)
2” Residential Streets

Permanent Wearing Course

Pagination

  • Previous page ‹‹
  • Page 1983
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact