Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/6/2022 - P334

Finance Committee - Agenda - 4/6/2022 - P334

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
334
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

3.07 CURBING:

A. The Contractor shall install curbing in accordance with the Construction
Requirements as specified in NHDOT Section 609.

3.08 SIDEWALKS:

A. The Contractor shall install sidewalks in accordance with the Construction
Requirements as specified in NHDOT Section 608.

3.09 PAVEMENT MARKINGS:

A. The Contractor shall replace all pavement markings removed or covered-over in
carrying out the work, and as directed by the Engineer, no sooner than 48 hours after
completion of permanent pavement. The markings and respective mixture and
application requirements shall conform to the requirements of NHDOT Standard
Specifications Section 632. Pavement markings are considered subsidiary to the
pavement items of work.

B. When directed by the Engineer, the Contractor shall provide temporary markings at
no additional cost to the Owner.

3.10 PAVEMENT REPAIR:
A. If required in the contract or if permanent pavement becomes rough or uneven,
permanent pavement patches and trenches shall be repaired and brought to grade

utilizing "infrared" paving methods following completion of the construction.

B. The Contractor performing the work shall use care to avoid overheating the
pavement being repaired.

C. Pavement repair shall extend a minimum of 6-inches beyond all edges of the
pavement patch to assure adequate bonding at the pavement joints.

END OF SECTION

2022 Sewer Replacement Project Road Restoration
Nashua, NH 02745-7

Page Image
Finance Committee - Agenda - 4/6/2022 - P334

Footer menu

  • Contact