Finance Committee - Agenda - 3/17/2021 - P167
b. CONTRACTOR certifies that: (i) there is no increase in cost to the OWNER; and (ii) it will conform
substantially, even with deviations, to the detailed requirements of the item named in the Contract
Documents.
2. Substitute Items
a. If in ENGINEER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not
qualify as an “or-equal” item under paragraph 6.05.A.1, it will be considered a proposed substitute item.