Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 7/6/2022 - P31

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P31

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

Finance Committee - Agenda - 7/6/2022 - P30

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P30

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

Finance Committee - Agenda - 7/6/2022 - P29

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P29

Attachment A

Fee Summary Sheet
“Basic” and “Additional” Services
Final Engineering Design

Item Fees
ZT, Basic Design Services... cscccsessessecenessesseescssrcseesseecenssoescocseceeessaucescnsuesees $286,340.00

2. Additional Services:

A.l

A.2

A.3

A.4

Finance Committee - Agenda - 7/6/2022 - P28

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P28

Attachment A

Fee Summary Sheet

Finance Committee - Agenda - 7/6/2022 - P27

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P27

CONTRACT FORM

Please sign and return these originals as your acceptance of the above scope and terms,
including noted attachments, and your authorization to proceed. Please also provide a
purchase order or equivalent accounting number, if applicable, at the end of this letter in
order to allow us to proceed.

Finance Committee - Agenda - 7/6/2022 - P26

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P26

CLIENT RESPONSIBILITIES

Final Engineering Design Proposal 05-11-22

4920

Owner/Contractor contract documents (except technical documents) and/or
purchase order, in order to solicit for and enter into a construction contract with a
Contractor or Construction Manager.

Solicit, administer, and award bids for construction implementation of this project.

Provide construction administration and supervisions of Contractor or Construction
Manager.

Finance Committee - Agenda - 7/6/2022 - P25

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P25

ITEMS NOT INCLUDED
1. More meetings than identified in basic and additional services.

2. Construction drawings and specifications. (Note: At this time the City has not
defined the scope or method of project delivery, or its phasing, which would dictate
the criteria of scope and extent of these construction documents}. Segments 3, 4, 6
& 11-14 all other drawings and specs.

3. Changes to the final engineering designs that are a result of issued state, federal or
city permit conditions.

Finance Committee - Agenda - 7/6/2022 - P24

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P24

A.l Geotechnical Analyses & Recommendations

TTG intends to subcontract the geotechnical engineering work to SLR International
(formerly HTE Northeast, Inc.) out of Bedford, NH. TTG has performed many similar
water/land projects with SLR support.

Finance Committee - Agenda - 7/6/2022 - P23

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P23

13,7 Design the new floating dock and gangway system including intermediate supports.

13.8 Re-examine the “0.00 ft rise” river model with the final design pile features to
confirm conformance.

13.9 Use the river model to assess pile erosion and scour, ice, and woody/miscellaneous
debris loadings.

13.10 Prepare final design drawings and specifications for City review and approval.

Segment 14 — Renaissance Park Improvements

Finance Committee - Agenda - 7/6/2022 - P22

By dnadmin on Sun, 11/06/2022 - 21:47
  • Read more about Finance Committee - Agenda - 7/6/2022 - P22

Segment 10 —- Replace and Widen ADA Ramp Below Library

No TTG final engineering required.

Segment 11 — 58-60 Main Street Boardwalk and Ramp

11.1

11.2

11.3

11.4

11.5

Design the final boardwalk bracket connections for the building.

Design the transition corner from the bracketed boardwalk to the parking lot ramp.
Design the ramp boardwalk and supporting piles.

Evaluate riverbank slope protection for erosion and scour.

Prepare final drawings and specifications for City review and approval.

Pagination

  • Previous page ‹‹
  • Page 1909
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact